4340 N FULTON AVE 91423

Certificate Information: 4340 N FULTON AVE 91423

Application / Permit
22016-10000-19847
Plan Check / Job No.
B22LA12946
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(15) Telecommunication Transmitter - wireless
Work Description
ePlan SECTOR SCOPE OF WORK * Install (3) proposed 6'-0" panel antennas (1 per sector) - (3) future CBRS antennas with integrated radio (1 per sector) * Install (3) Proposed FRP screen boxes * Install proposed jumpers as required * Install (6) proposed radios (2 per sector) * Install (3) proposed surge suppression device ( 1 per sector) * Install (3) proposed hybrid cables * Install proposed cable tray on roof EQUIPMENT OF WORK * Install (1) proposed equipment platform with utility H-Frame * Install (1) proposed BBU in cabinet * Install (1) proposed equipment cabinet * Install (1) proposed power conduit * Install (1) proposed telco conduit * Install (1) proposed NEMA 3 telco-fiber box * Install (1) proposed GPS antenna * Install new gen plug intersect camlock at ground level
Permit Issued
Issued on 10/24/2022
Issuing Office
Current Status
Permit Finaled on 12/5/2023

Permit Application Status History

Submitted 8/16/2022 APPLICANT
Assigned to Plan Check Engineer 8/16/2022 SELLA BENYAMIN
Corrections Issued 8/16/2022 SELLA BENYAMIN
Plan Check Approved 10/19/2022 ANDREW SANTIAGO
Issued 10/24/2022 APPLICANT
Permit Finaled 12/4/2023 STEVEN LEVITT

Permit Application Clearance Information

"Q" conditions Cleared 10/14/2022 KATHERINE RICE
Plan Approval Cleared 10/14/2022 KATHERINE RICE
ZA Case Cleared 10/14/2022 KATHERINE RICE

Contact Information

Contractor Diversified Communications Services Inc; Lic. No.: 540890-B       ,
Contractor Diversified Communications Services Llc; Lic. No.: 540890-B       ,
Engineer Connell,, Daniel Michael; Lic. No.: NA62543       ,

Inspector Information

JEFFREY FULTON, (818) 374-1132 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Wood Frame 12/23/2022 Approved DANIEL VARNUM
Final 8/29/2023 Not Ready for Inspection ROBERT DAVIS
SGSOV-Seismic Gas S/O Valve 8/29/2023 SGSOV Approved ROBERT DAVIS
Smoke Detectors 8/29/2023 Approved ROBERT DAVIS
Final 12/4/2023 Permit Finaled STEVEN LEVITT