1253 W SUNSIDE ST 90732
Certificate Information: 1253 W SUNSIDE ST 90732
- Application / Permit
- 22016-10000-18326
- Plan Check / Job No.
- B22LA11775
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- REMOVE AND REPLACE 40 FT OF SUPFLOOR AND FLOOR FRAMING, REMOVE AND REPLACE DRYWWALL THROUGHT, 1 WINDOW SAME SIZE AND LOCATION IN EXISTING 2 STORY SINGLE FAMILY DWELLING WITH ATTACHED GARAGE.
- Permit Issued
- Issued on 6/24/2022
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 2/9/2023
Permit Application Status History
| Submitted | 6/17/2022 | APPLICANT |
| Assigned to Plan Check Engineer | 6/17/2022 | AUNG SOE |
| Plan Check Approved | 6/17/2022 | AUNG SOE |
| Issued | 6/24/2022 | APPLICANT |
| Permit Finaled | 2/8/2023 | JOHN KLARIN |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Accurate Property Restoration; Lic. No.: 733551-B | 2570 W 237TH STREET STE B TORRANCE, CA 90505 |
| Engineer | Hokama,, Michael; Lic. No.: S4505 | 4 ST JUST AVE LADERA RANCH, CA 92694 |
Inspector Information
| JOSEPH MCGARRY, (310) 732-4559 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| BUILDING-Rough-Frame | 9/19/2022 | Partial Approval | ANSON MAGLASANG |
| BUILDING-Rough-Frame | 11/18/2022 | Approved | ANSON MAGLASANG |
| ELECTRICAL-Rough | 11/18/2022 | Approved | ANSON MAGLASANG |
| HVAC-Rough | 11/18/2022 | Approved | ANSON MAGLASANG |
| Insulation | 11/29/2022 | Approved | ANSON MAGLASANG |
| Drywall Nailing | 12/8/2022 | Approved | JAMES CHAVEZ |
| Interior/Exterior Lathing | 1/13/2023 | Corrections Issued | JAMES CHAVEZ |
| Interior/Exterior Lathing | 1/18/2023 | Approved | JAMES CHAVEZ |
| Final | 2/3/2023 | Corrections Issued | JULIAN AMAYA |
| SGSOV-Seismic Gas S/O Valve | 2/3/2023 | SGSOV Not Ready | JULIAN AMAYA |
| Smoke Detectors | 2/3/2023 | Corrections Issued | JULIAN AMAYA |
| ELECTRICAL-Final | 2/8/2023 | Approved | JOHN KLARIN |
| Final | 2/8/2023 | Permit Finaled | JOHN KLARIN |
| HVAC-Final | 2/8/2023 | Approved | JOHN KLARIN |
| PLUMBING-Final | 2/8/2023 | Approved | JOHN KLARIN |
| SGSOV-Seismic Gas S/O Valve | 2/8/2023 | SGSOV Approved | JOHN KLARIN |
| Smoke Detectors | 2/8/2023 | Approved | JOHN KLARIN |