4601 N MALEZA PL 91356
Certificate Information: 4601 N MALEZA PL 91356
- Application / Permit
- 22016-10000-16584
- Plan Check / Job No.
- X22LA08812
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- (1)Kitchen/(1)bathroom remodel for residential buildings (no structural changes). Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __5____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B. Water damage, termite damage/ dry rot repair less than 10% of replacement cost of residential buildings. (10)Window and (2)door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. Re-stucco for residential buildings. Replace drywall (no new walls added) for single family dwellings and duplexes only.
- Permit Issued
- Issued on 7/25/2022
- Issuing Office
- Current Status
- Permit Finaled on 6/2/2023
Permit Application Status History
| Issued | 7/25/2022 | APPLICANT |
| Permit Finaled | 6/1/2023 | SEAN WIRCH |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Maad Construction; Lic. No.: 1082474-B | 848 DEVORE AVE SIMI VALLEY, CA 93065 |
Inspector Information
| JOHN KIDWELL, (818) 774-4314 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Final | 7/28/2022 | Corrections Issued | DAVID SANDOVAL |
| SGSOV-Seismic Gas S/O Valve | 7/28/2022 | SGSOV Not Ready | DAVID SANDOVAL |
| Pre-Inspection | 8/5/2022 | Corrections Issued | SEAN WIRCH |
| Pre-Inspection | 8/12/2022 | Corrections Issued | DAVID SANDOVAL |
| Pre-Inspection | 9/21/2022 | Corrections Issued | DAVID SANDOVAL |
| Footing/Foundation/Slab | 11/3/2022 | Corrections Issued | DAVID SANDOVAL |
| Interior/Exterior Lathing | 1/12/2023 | Partial Approval | DAVID SANDOVAL |
| Pre-Inspection | 1/12/2023 | Not Ready for Inspection | DAVID SANDOVAL |
| Excavation/Setback/Form/Re-Bar | 1/28/2023 | Corrections Issued | SEAN HAUPT |
| Wood Frame | 1/28/2023 | Not Ready for Inspection | SEAN HAUPT |
| Drywall Nailing | 3/14/2023 | Approved | DAVID SANDOVAL |
| Final | 6/1/2023 | Permit Finaled | SEAN WIRCH |
| SGSOV-Seismic Gas S/O Valve | 6/1/2023 | SGSOV Approved | SEAN WIRCH |
| Smoke Detectors | 6/1/2023 | Approved | SEAN WIRCH |