4181 N WESLIN AVE 91423
Certificate Information: 4181 N WESLIN AVE 91423
- Application / Permit
- 22016-10000-14580
- Plan Check / Job No.
- X22LA07705
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- 4 door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. Replacement of damaged framing members (less than 10% of replacement cost of building) for houses and duplexes Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __5____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B 10 Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24 Re-stucco for residential buildings. 1 Kitchen/ 3 bathroom remodel for residential buildings (no structural changes
- Permit Issued
- Issued on 5/12/2022
- Issuing Office
- Current Status
- Permit Finaled on 2/24/2023
Permit Application Status History
| Issued | 5/12/2022 | APPLICANT |
| Permit Finaled | 2/24/2023 | MISAEL ESPARZA |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Owner-Builder | , |
Inspector Information
| MISAEL ESPARZA, (818) 374-1169 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Final | 2/21/2023 | Corrections Issued | MISAEL ESPARZA |
| SGSOV-Seismic Gas S/O Valve | 2/21/2023 | SGSOV Not Ready | MISAEL ESPARZA |
| Smoke Detectors | 2/21/2023 | Approved | MISAEL ESPARZA |
| Final | 2/24/2023 | Permit Finaled | MISAEL ESPARZA |
| PLUMBING-Final | 2/24/2023 | Approved | MISAEL ESPARZA |
| Pre-Inspection | 2/24/2023 | Approved | MISAEL ESPARZA |
| SGSOV-Seismic Gas S/O Valve | 2/24/2023 | SGSOV Approved | MISAEL ESPARZA |