2230 N STANLEY HILLS DR 90046
Certificate Information: 2230 N STANLEY HILLS DR 90046
- Application / Permit
- 22016-10000-12976
- Plan Check / Job No.
- X22LA06783
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- (1) Door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. (1) Kitchen / (2) Bathroom remodel for residential buildings (no structural changes). Replace drywall (no new walls added) for single family dwellings and duplexes only. Concrete block freestanding masonry fence walls constructed per Information Bulletin P/BC 2020-096 located in residential zones, maximum 6 feet height above grade, and not located in the required front yard or within 5 feet of the side street lot line of a reverse corner lot (subject to additional limitations of LAMC Section 12.22C20(f) and Information bulletin P/ZC 2002-002). "COMPLY WITH DEPARTMENT ORDER effective date 01/08/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE".
- Permit Issued
- Issued on 7/25/2022
- Issuing Office
- Current Status
- Issued on 7/25/2022
Permit Application Status History
| Issued | 7/25/2022 | APPLICANT |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Medina Custom Builders Inc; Lic. No.: 1030633-B | 17412 CHASE ST NORTHRIDGE, CA 91325 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 8/3/2022 | Partial Approval | RYAN SALAZAR |
| Insulation | 10/18/2022 | Approved | RYAN SALAZAR |
| Drywall Nailing | 11/1/2022 | Approved | ANDEY CHAPARRO |
| Interior/Exterior Lathing | 12/20/2022 | Approved | PATRICK LIEBREGT |
| Final | 1/23/2024 | Not Ready for Inspection | JOEL ORDAZ |
| SGSOV-Seismic Gas S/O Valve | 1/23/2024 | SGSOV Not Ready | JOEL ORDAZ |
| Smoke Detectors | 1/23/2024 | Corrections Issued | JOEL ORDAZ |
| Final | 1/26/2026 | Not Ready for Inspection | PTOLEMY HILL |
| SGSOV-Seismic Gas S/O Valve | 1/26/2026 | SGSOV Not Ready | PTOLEMY HILL |
| Smoke Detectors | 1/26/2026 | Not Ready for Inspection | PTOLEMY HILL |