- Work Description
- Soft-Story Seismic Retrofit per LABC Chapter 93: By adding (1) SSCC at WEST, (1) SSCC at NORTH and (1) 2 way SSCC for SOUTH-EAST Elevations.
- Permit Issued
- Issued on 12/9/2022
- Issuing Office
- Current Status
- CofC Issued on 7/28/2023
Permit Application Status History
| Submitted | 4/22/2022 | APPLICANT |
| Assigned to Plan Check Engineer | 5/5/2022 | BIDYUT RATH |
| Corrections Issued | 5/17/2022 | BIDYUT RATH |
| Quality Review Completed | 5/20/2022 | SAI KHUM |
| Applicant returned to address corrections | 6/13/2022 | BIDYUT RATH |
| Plan Check Approved | 6/17/2022 | BIDYUT RATH |
| Issued | 12/9/2022 | APPLICANT |
| OK for CofC | 6/21/2023 | MICHAEL PETRUSKO |
| CofC Issued | 7/28/2023 | HENRY BAGHDASSARIAN |
Permit Application Clearance Information
| Tenant Habitability Plan | Cleared | 10/3/2022 | ISMAEL HERNANDEZ |
Contact Information
| Contractor | Lockwood Engineering; Lic. No.: 1016915-B | 9663 SANTA MONICA BLVD 745 BEVERLY HILLS, CA 90210 |
| Engineer | Shaolian,, Shahab Joseph; Lic. No.: C84155 | 15134 FRIAR ST VAN NUYS, CA 91411 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 2/21/2023 | Approved | GRANT WOODS |
| Excavation/Setback/Form/Re-Bar | 4/10/2023 | No Access for Inspection | GRANT WOODS |
| Excavation/Setback/Form/Re-Bar | 4/11/2023 | Approved | MICHAEL PETRUSKO |
| Deputy Reinf. Concrete | 4/12/2023 | Conditional Approval | PAUL DAVIDSON |
| Wood Frame | 4/19/2023 | Approved | MICHAEL PETRUSKO |
| Deputy Wood Construction | 4/21/2023 | Conditional Approval | AMANUEL BERHE |
| Floor/Roof Diaphrgm/Shear Wall | 4/21/2023 | Approved | AMANUEL BERHE |
| Floor/Roof Diaphrgm/Shear Wall | 4/24/2023 | Approved | AMANUEL BERHE |
| Interior/Exterior Lathing | 4/28/2023 | Approved | MICHAEL PETRUSKO |
| Final | 5/31/2023 | Not Ready for Inspection | MICHAEL PETRUSKO |
| SGSOV-Seismic Gas S/O Valve | 5/31/2023 | SGSOV Not Ready | MICHAEL PETRUSKO |
| Smoke Detectors | 5/31/2023 | Not Ready for Inspection | MICHAEL PETRUSKO |
| Final | 6/15/2023 | No Access for Inspection | MICHAEL PETRUSKO |
| SGSOV-Seismic Gas S/O Valve | 6/15/2023 | SGSOV Not Ready | MICHAEL PETRUSKO |
| Smoke Detectors | 6/15/2023 | No Access for Inspection | MICHAEL PETRUSKO |
| Final | 6/21/2023 | OK for CofC | MICHAEL PETRUSKO |
| SGSOV-Seismic Gas S/O Valve | 6/21/2023 | SGSOV Approved | MICHAEL PETRUSKO |
| Smoke Detectors | 6/21/2023 | Approved | MICHAEL PETRUSKO |
| Special/Order Compliance | 6/23/2023 | Corrections Issued | GRANT WOODS |