5671 W SPREADING OAK DR 90068
Certificate Information: 5671 W SPREADING OAK DR 90068
- Application / Permit
- 22016-10000-11474
- Plan Check / Job No.
- B22LA06698
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- RENOVATION OF AN EXISTING TWO STORY SINGLE FAMILY RESIDENTIAL BUIDLING. EXTERIOR IMPROVEMENTS INCLUDE REPAIR OF EXISTING DECK, RE ROOFING, REPLACEMENT OF DDOORS AND WINDOWS, AND NEW EXTERIOR WALL FINISHES. EXISTING AREA UNDER ROOF REMAINS THE SAME; ENTRY IS EXTENDED TO DRIVEWAY APPROXIMATELY 42" UNDER ROOF AT 19SF. INTERIOR IMPROVEMENTS INCLUDE REMOVAL AND REPLACEMENT OF STAIR, REFRAMING OF A PORTION OF LOWER LEVEL FLOOR, MODIFICATION OF NON STRUCTURAL PARTITION WALLS, NEW FIXTURES, AND APPLIANCES.
- Permit Issued
- Issued on 10/14/2022
- Issuing Office
- Current Status
- CofO Issued on 5/22/2026
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 4/13/2022 | APPLICANT |
| Assigned to Plan Check Engineer | 4/28/2022 | ADRIANA LOPEZ |
| Corrections Issued | 5/12/2022 | ADRIANA LOPEZ |
| Quality Review Completed | 5/18/2022 | KEN GILL |
| Applicant returned to address corrections | 6/16/2022 | ADRIANA LOPEZ |
| Plan Check Approved | 7/8/2022 | ADRIANA LOPEZ |
| Issued | 10/14/2022 | APPLICANT |
| Building Plans Picked Up | 10/17/2022 | APPLICANT |
| CofO in Progress | 5/21/2026 | CRAIG VAUGHAN |
| CofO Issued | 5/22/2026 | DEROLD HAUFF |
| Permit Finaled | 5/22/2026 | DEROLD HAUFF |
Permit Application Clearance Information
| Grading Pre-Inspection | Cleared | 5/20/2022 | KIRK LINKLATER |
| CPC | Cleared | 5/23/2022 | MAXFIELD VERMY |
| ZI | Cleared | 5/23/2022 | MAXFIELD VERMY |
Contact Information
| Contractor | Cmf Homebuilders; Lic. No.: 827119-B | 9903 SANTA MONICA BLVD #626 BEVERLY HILLS, CA 90212 |
| Engineer | Deihimi,, Amir Hossein; Lic. No.: C78194 | 23172 PLAZA POINTE DR STE 145 LAGUNA HILLS, CA 92653 |
Inspector Information
| CRAIG VAUGHAN, (213) 202-3250 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Footing/Foundation/Slab | 3/13/2024 | Approved | ROY SPAULDING |
| PLUMBING-Rough | 3/13/2024 | Approved | ROY SPAULDING |
| ELECTRICAL-Rough | 3/15/2024 | Approved | ROY SPAULDING |
| Deputy Wood Construction | 4/12/2024 | Conditional Approval | ROY SPAULDING |
| Floor/Roof Diaphrgm/Shear Wall | 4/12/2024 | Approved | ROY SPAULDING |
| HVAC-Rough | 4/12/2024 | Approved | ROY SPAULDING |
| Floor/Roof Diaphrgm/Shear Wall | 6/20/2024 | Approved | ROY SPAULDING |
| BUILDING-Rough-Frame | 7/3/2024 | Not Ready for Inspection | DAVID FEILER |
| Green Building Rough | 7/3/2024 | Not Ready for Inspection | DAVID FEILER |
| Interior/Exterior Lathing | 7/3/2024 | Partial Approval | DAVID FEILER |
| BUILDING-Rough-Frame | 7/11/2024 | Approved | ROY SPAULDING |
| Green Building Rough | 7/11/2024 | Approved | ROY SPAULDING |
| Interior/Exterior Lathing | 7/11/2024 | Approved | ROY SPAULDING |
| Interior/Exterior Lathing | 7/15/2024 | Approved | ROY SPAULDING |
| Insulation | 7/24/2024 | Approved | ROY SPAULDING |
| Drywall Nailing | 8/5/2024 | Approved | JOSH MEISTER |
| Shower Pan | 9/11/2024 | Approved | CRAIG VAUGHAN |
| Interior/Exterior Lathing | 9/12/2024 | Not Ready for Inspection | CRAIG VAUGHAN |
| Interior/Exterior Lathing | 9/13/2024 | Partial Approval | CRAIG VAUGHAN |
| PLUMBING-Final | 6/6/2025 | Corrections Issued | CRAIG VAUGHAN |
| PLUMBING-Final | 6/20/2025 | Approved | ALIZAH MAYAGOITIA |
| ELECTRICAL-Final | 6/26/2025 | Corrections Issued | BRENDAN MORELLI |
| ELECTRICAL-Final | 7/9/2025 | Partial Approval | ENRIQUE MIRELES |
| ELECTRICAL-Final | 7/23/2025 | Partial Approval | CRAIG VAUGHAN |
| ELECTRICAL-Final | 12/2/2025 | Not Ready for Inspection | CRAIG VAUGHAN |
| ELECTRICAL-Final | 12/4/2025 | Not Ready for Inspection | CRAIG VAUGHAN |
| Final | 3/13/2026 | Corrections Issued | BRIAN SULLIVAN |
| Green Building Final | 3/13/2026 | Approved | BRIAN SULLIVAN |
| SGSOV-Seismic Gas S/O Valve | 3/13/2026 | SGSOV Not Ready | BRIAN SULLIVAN |
| Smoke Detectors | 3/13/2026 | Approved | BRIAN SULLIVAN |
| Pre-Inspection | 3/27/2026 | Not Ready for Inspection | CRAIG VAUGHAN |
| Final | 4/23/2026 | Partial Inspection | CRAIG VAUGHAN |
| HVAC-Final | 4/23/2026 | Approved | CRAIG VAUGHAN |
| SGSOV-Seismic Gas S/O Valve | 4/23/2026 | SGSOV Approved | CRAIG VAUGHAN |
| ELECTRICAL-Final | 5/20/2026 | Approved | CRAIG VAUGHAN |
| Final | 5/20/2026 | OK to Issue CofO | CRAIG VAUGHAN |