4019 W SUNSET BLVD 90029

Certificate Information: 4019 W SUNSET BLVD 90029

Application / Permit
22016-10000-06070
Plan Check / Job No.
B22LA03710
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(17) Restaurant
Work Description
TENANT IMPROVEMENT TO EXISTING RESTAURANT ON GROUND FLOOR. MODIFY CUSTOMER AREA TO INCLUDE COVERED PATIO BY MEANS OF RECESSED STOREFRONT.
Permit Issued
Issued on 7/28/2022
Issuing Office
Metro
Current Status
Permit Finaled on 9/29/2023

Permit Application Status History

Submitted 3/7/2022 APPLICANT
Assigned to Plan Check Engineer 3/9/2022 FERNANDO FLORES
Corrections Issued 3/10/2022 FERNANDO FLORES
Building Plans Picked Up 3/11/2022 APPLICANT
Plan Check Approved 6/3/2022 FERNANDO FLORES
Issued 7/28/2022 APPLICANT
Permit Finaled 9/28/2023 RAFAEL CORTES

Permit Application Clearance Information

Food Service Establishment Cleared 6/2/2022 JASH PATEL
Food establishment approval Cleared 6/3/2022 LACDHS APPROVED

Contact Information

Contractor Calasia Construction Inc; Lic. No.: 938255-B 3050 FLETCHER DRIVE      LOS ANGELES, CA 90065
Engineer Tuchscher,, James Todd; Lic. No.: C77649 5503 E 2ND ST      LONG BEACH, CA 90803

Inspector Information

TIMOTHY POWELL, (213) 482-0360 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Light Gage Steel Frame 2/2/2023 Partial Approval MARTIN TAVITIAN
Insulation 2/6/2023 Partial Approval RONALD JIMENEZ
Drywall Nailing 3/20/2023 Partial Approval RAMAZANALI ALMASI
Footing/Foundation/Slab 4/5/2023 Not Ready for Inspection TIMOTHY POWELL
Drywall Nailing 4/14/2023 Partial Approval TIMOTHY POWELL
Wood Frame 4/17/2023 Partial Approval TIMOTHY POWELL
Light Gage Steel Frame 4/28/2023 No Access for Inspection RONALD JIMENEZ
Wood Frame 4/28/2023 No Access for Inspection RONALD JIMENEZ
Drywall Nailing 5/8/2023 Approved RONALD JIMENEZ
Final 7/20/2023 Not Ready for Inspection RONALD JIMENEZ
SGSOV-Seismic Gas S/O Valve 7/20/2023 SGSOV Not Ready RONALD JIMENEZ
Smoke Detectors 7/20/2023 Not Ready for Inspection RONALD JIMENEZ
Interior/Exterior Lathing 9/11/2023 Partial Inspection RONALD JIMENEZ
Interior/Exterior Lathing 9/14/2023 Conditional Approval MARTIN TAVITIAN
Final 9/22/2023 Partial Inspection RONALD JIMENEZ
SGSOV-Seismic Gas S/O Valve 9/22/2023 SGSOV Not Ready RONALD JIMENEZ
Smoke Detectors 9/22/2023 Approved RONALD JIMENEZ
Final 9/28/2023 Permit Finaled RAFAEL CORTES
SGSOV-Seismic Gas S/O Valve 9/28/2023 SGSOV Approved RAFAEL CORTES