16107 W VICTORY BLVD 91406

Certificate Information: 16107 W VICTORY BLVD 91406

Application / Permit
22016-10000-04668
Plan Check / Job No.
B22LA02817
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(16) Retail
Work Description
Tenant improvement to an existing retail space to include the following items: 1. remove existing front mazzanine 2. provide new interior decor 3. new cooler/freezer boxes. 4. new roof top HVAC units.
Permit Issued
Issued on 6/14/2022
Issuing Office
Current Status
Permit Finaled on 10/11/2022

Permit Application Status History

Submitted 2/16/2022 APPLICANT
Assigned to Plan Check Engineer 3/3/2022 QUAN NGHIEM
Corrections Issued 3/15/2022 QUAN NGHIEM
Building Plans Picked Up 3/22/2022 APPLICANT
Disabled Access Plans Picked Up 4/8/2022 APPLICANT
Quality Review Completed 5/4/2022 CHAD DOI
Applicant returned to address corrections 5/9/2022 QUAN NGHIEM
Plan Check Approved 6/14/2022 QUAN NGHIEM
Issued 6/14/2022 APPLICANT
Permit Finaled 10/8/2022 CAMERON CHABAN

Permit Application Clearance Information

ZI Cleared 3/17/2022 RYAN LY
DAS Clearance Cleared 5/18/2022 QUAN NGHIEM

Contact Information

Contractor Tech One Construction Inc; Lic. No.: 854945-B 5373 BROOKS ST      MONTCLAIR, CA 91763
Engineer Baroonian,, Armen; Lic. No.: S4227 867 N FAIR OAKS AVE 100      PASADENA, CA 91103

Inspector Information

SEAN GRIFFITH, (818) 374-1102 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Drywall Nailing 7/20/2022 Not Ready for Inspection CAMERON CHABAN
Light Gage Steel Frame 7/20/2022 Partial Approval CAMERON CHABAN
Pre-Inspection 7/20/2022 Partial Inspection CAMERON CHABAN
Light Gage Steel Frame 7/22/2022 Partial Approval CAMERON CHABAN
Drywall Nailing 8/1/2022 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 8/10/2022 Conditional Approval CAMERON CHABAN
Deputy Drilled-In Anchors 8/17/2022 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 8/18/2022 No Result Entered GARY EWELL
Light Gage Steel Frame 8/23/2022 Partial Approval CAMERON CHABAN
Deputy Other (see comments) 8/24/2022 Conditional Approval CAMERON CHABAN
Drywall Nailing 8/27/2022 Conditional Approval CAMERON CHABAN
Pre-Inspection 9/9/2022 Partial Inspection CAMERON CHABAN
Pre-Inspection 9/15/2022 Partial Inspection CAMERON CHABAN
Final 9/26/2022 Not Ready for Inspection CAMERON CHABAN
Reinforced Masonry Frame 9/26/2022 Approved CAMERON CHABAN
SGSOV-Seismic Gas S/O Valve 9/26/2022 SGSOV Not Ready CAMERON CHABAN
Smoke Detectors 9/26/2022 Approved CAMERON CHABAN
SGSOV-Seismic Gas S/O Valve 9/29/2022 SGSOV Not Ready CAMERON CHABAN
Final 10/1/2022 Partial Inspection CAMERON CHABAN
SGSOV-Seismic Gas S/O Valve 10/1/2022 SGSOV Not Ready CAMERON CHABAN
Final 10/8/2022 Permit Finaled CAMERON CHABAN
SGSOV-Seismic Gas S/O Valve 10/8/2022 SGSOV No Gas CAMERON CHABAN