1587 W 35TH PL 90018

Certificate Information: 1587 W 35TH PL 90018

Application / Permit
22016-10000-04368
Plan Check / Job No.
B22LA02595
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL EXISTING TWO STORY DWELLING. CREATE ADDITIONAL BEDROOMS AND BATHROOM. REMOVE KITCHEN IN ATTIC LEVEL AND EXTERIOR STAIRS.
Permit Issued
Issued on 4/11/2022
Issuing Office
Current Status
Permit Finaled on 7/25/2022

Permit Application Status History

Submitted 2/14/2022 APPLICANT
Assigned to Plan Check Engineer 2/22/2022 JOSEPH RAFOLS
Corrections Issued 2/23/2022 JOSEPH RAFOLS
Plan Check Approved 3/31/2022 RICARDO RAMIREZ
Issued 4/11/2022 APPLICANT
Building Plans Picked Up 4/27/2022 APPLICANT
Permit Finaled 7/22/2022 SABAS ALONSO

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 3/29/2022 CHRISTOPHER ROCHA
Sewer availability Cleared 3/29/2022 CHRISTOPHER ROCHA

Contact Information

Architect Jung,, Sungyub; Lic. No.: C33776 1024 CERISE AVENUE      TORRANCE, CA 90503
Contractor Simcity Construction Inc; Lic. No.: 1027407-B 3350 W OLYMOIC BLVD #202      LOS ANGELES, CA 90019
Engineer Park,, Juntae; Lic. No.: C65104 3055 WILSHIRE BLVD 880      LOS ANGELES, CA 90010

Inspector Information

SABAS ALONSO, (213) 202-3468 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 5/6/2022 No Access for Inspection SABAS ALONSO
HVAC-Rough 5/6/2022 No Access for Inspection SABAS ALONSO
PLUMBING-Rough 5/6/2022 No Access for Inspection SABAS ALONSO
Wood Frame 5/6/2022 No Access for Inspection SABAS ALONSO
Rough-Elec/Plmb/HVAC 5/11/2022 Not Ready for Inspection RUBEN SALAS
Wood Frame 5/11/2022 Corrections Issued RUBEN SALAS
Rough-Elec/Plmb/HVAC 5/16/2022 Approved SABAS ALONSO
Wood Frame 5/16/2022 Approved SABAS ALONSO
Drywall Nailing 5/19/2022 Approved LILIANA PORTILLO
Interior/Exterior Lathing 5/19/2022 Approved LILIANA PORTILLO
Shower Pan 5/19/2022 Approved LILIANA PORTILLO
Final 6/20/2022 Corrections Issued SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 6/20/2022 SGSOV Approved SABAS ALONSO
Smoke Detectors 6/20/2022 Order to Comply Issued SABAS ALONSO
Final 7/22/2022 Permit Finaled SABAS ALONSO
Smoke Detectors 7/22/2022 Approved SABAS ALONSO