1126 1/2 W 56TH ST 90037

Certificate Information: 1126 1/2 W 56TH ST 90037

Application / Permit
22016-10000-03625
Plan Check / Job No.
B22LA02128
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT REAR GARAGE AND A SLEEPING ROOM TO AN ADU. REPLACE (E) ROOF FRAMING. CEILING JOISTS, DAMAGE WALLS AND CONCRETE SLAB IN GARAGE. PER CA GOVT CODE 65852.2(e)(1)(A)
Permit Issued
Issued on 4/13/2023
Issuing Office
Metro
Current Status
CofO Issued on 11/16/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/15/2022 APPLICANT
Assigned to Plan Check Engineer 5/19/2022 SAM CHANG
Corrections Issued 6/1/2022 SAM CHANG
Quality Review Completed 6/6/2022 EUGENE BARBEAU
Building Plans Picked Up 6/27/2022 APPLICANT
Plan Check Approved 9/20/2022 SAM CHANG
Issued 4/13/2023 APPLICANT
CofO in Progress 10/2/2024 CRAIG DAVIS
Permit Finaled 11/16/2024 DEROLD HAUFF
CofO Issued 11/16/2024 DEROLD HAUFF
Permit Finaled 11/16/2024 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 7/1/2022 JEANETTE VONG
Roof/Waste drainage to street Cleared 7/1/2022 JEANETTE VONG
Sewer availability Cleared 7/1/2022 JEANETTE VONG
CPC Cleared 7/6/2022 RUBEN VASQUEZ
Eng Process Fee Ord 176,300 Cleared 7/6/2022 JEANETTE VONG
Hydrant and Access approval Cleared 8/29/2022 GILBERT URREA
Green Code Cleared 9/20/2022 SAM CHANG

Contact Information

Contractor Owner-Builder       ,
Engineer Cooke,, Conway Cecil; Lic. No.: S5524 34658 LINDA ROSEA RD      TEMECULA, CA 92592

Inspector Information

BARRY HACHE, (213) 202-9851 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/2/2023 Partial Inspection SABAS ALONSO
Excavation/Setback/Form/Re-Bar 5/23/2023 Partial Approval SABAS ALONSO
Underground Mechanical 5/23/2023 Partial Approval SABAS ALONSO
Footing/Foundation/Slab 5/25/2023 Corrections Issued SABAS ALONSO
Footing/Foundation/Slab 5/31/2023 Approved OSVALDO PARAMO
ELECTRICAL-Rough 6/27/2023 Corrections Issued SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 6/27/2023 Partial Approval SABAS ALONSO
Green Building Rough 6/27/2023 Approved SABAS ALONSO
PLUMBING-Rough 6/27/2023 Corrections Issued SABAS ALONSO
Underground Mechanical 6/27/2023 Partial Approval SABAS ALONSO
Deputy Wood Construction 6/29/2023 Approved SABAS ALONSO
ELECTRICAL-Rough 7/11/2023 Approved SABAS ALONSO
HVAC-Rough 7/11/2023 Approved SABAS ALONSO
PLUMBING-Rough 7/11/2023 Approved SABAS ALONSO
PLUMBING-Rough 7/12/2023 Partial Approval SABAS ALONSO
Insulation 7/21/2023 Corrections Issued MICHAEL LEWIS
BUILDING-Rough-Frame 7/24/2023 Approved MICHAEL LEWIS
Insulation 7/24/2023 Approved MICHAEL LEWIS
Shower Pan 7/24/2023 Approved MICHAEL LEWIS
Drywall Nailing 7/26/2023 Not Ready for Inspection MICHAEL LEWIS
Interior/Exterior Lathing 7/26/2023 Approved MICHAEL LEWIS
Drywall Nailing 8/3/2023 Approved ALEJANDRO DE ARTOLA
SGSOV-Seismic Gas S/O Valve 8/14/2024 SGSOV Not Ready CRAIG DAVIS
Final 8/19/2024 Corrections Issued CRAIG DAVIS
SGSOV-Seismic Gas S/O Valve 8/19/2024 SGSOV Not Ready CRAIG DAVIS
Smoke Detectors 8/19/2024 Partial Approval CRAIG DAVIS
Final 9/13/2024 Corrections Issued CRAIG DAVIS
SGSOV-Seismic Gas S/O Valve 9/13/2024 SGSOV Not Ready CRAIG DAVIS
Smoke Detectors 9/13/2024 Corrections Issued CRAIG DAVIS
Final 9/19/2024 Corrections Issued CRAIG DAVIS
ELECTRICAL-Final 10/1/2024 Approved CRAIG DAVIS
Final 10/1/2024 OK to Issue CofO CRAIG DAVIS
HVAC-Final 10/1/2024 Approved CRAIG DAVIS
PLUMBING-Final 10/1/2024 Approved CRAIG DAVIS
SGSOV-Seismic Gas S/O Valve 10/1/2024 SGSOV Approved CRAIG DAVIS
Smoke Detectors 10/1/2024 Approved CRAIG DAVIS
Pre-Inspection 10/16/2024 Approved CRAIG DAVIS