1408 N ORANGE GROVE AVE 90046

Certificate Information: 1408 N ORANGE GROVE AVE 90046

Application / Permit
22016-10000-03297
Plan Check / Job No.
B22LA01895
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ePlan: Addition to rear of (E) 1 Story SFD and remodel of existing portion
Permit Issued
Issued on 4/25/2022
Issuing Office
Current Status
Issued on 4/25/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 2/3/2022 APPLICANT
Assigned to Plan Check Engineer 2/4/2022 HERNAN ARREOLA
Corrections Issued 2/4/2022 HERNAN ARREOLA
Applicant returned to address corrections 3/31/2022 HERNAN ARREOLA
Plan Check Approved 4/17/2022 HERNAN ARREOLA
Issued 4/25/2022 APPLICANT

Permit Application Clearance Information

HPOZ Cleared 2/14/2022 AMANDA KAINER
Roof/Waste drainage to street Cleared 2/28/2022 ABEL CASILLAS
Eng Process Fee Ord 176,300 Cleared 3/7/2022 ABEL CASILLAS

Contact Information

Architect Van, Leer, Louisa B; Lic. No.: NA28646       ,
Contractor Owner-Builder       ,
Engineer Phillips,, Craig Richard; Lic. No.: C69673 2123 VESTAL AVE      LOS ANGELES, CA 90026

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 9/27/2022 Approved RAUL BARAJAS
HVAC-Rough 9/27/2022 Approved RAUL BARAJAS
PLUMBING-Rough 9/27/2022 Approved RAUL BARAJAS
Wood Frame 9/27/2022 Not Ready for Inspection RAUL BARAJAS
BUILDING-Rough-Frame 10/18/2022 Approved BRIAN SULLIVAN
Green Building Rough 10/18/2022 Approved BRIAN SULLIVAN
Wood Frame 10/18/2022 Approved BRIAN SULLIVAN
Insulation 10/25/2022 Approved RAUL BARAJAS
Interior/Exterior Lathing 10/25/2022 Approved RAUL BARAJAS
Drywall Nailing 11/7/2022 Approved JOAQUIN GREENOUGH
Interior/Exterior Lathing 11/7/2022 Approved JOAQUIN GREENOUGH
Shower Pan 11/7/2022 Approved JOAQUIN GREENOUGH
Final 9/28/2023 Corrections Issued STUART CHAPMAN
Footing/Foundation/Slab 9/28/2023 Approved STUART CHAPMAN
Green Building Final 9/28/2023 Approved STUART CHAPMAN
SGSOV-Seismic Gas S/O Valve 9/28/2023 SGSOV Approved STUART CHAPMAN
Smoke Detectors 9/28/2023 Approved STUART CHAPMAN
Final 5/2/2024 Not Ready for Inspection BRIAN SULLIVAN