1024-1024 1/2 W 39TH PL 90037

Certificate Information: 1024-1024 1/2 W 39TH PL 90037

Application / Permit
22016-10000-02192
Plan Check / Job No.
B22LA01273
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(5) Apartment
Work Description
fire damge repair: Remove and replace 130sqft of damged roof framing, Reinforce limited ceiling framing. Remove and replace drywall from water and smoke damge, kit and bathroom cabinet and 16 windows same size
Permit Issued
Issued on 4/5/2022
Issuing Office
Current Status
Permit Finaled on 3/29/2023

Permit Application Status History

Submitted 1/25/2022 APPLICANT
Assigned to Plan Check Engineer 2/2/2022 RACHEL BEYENE
Corrections Issued 2/2/2022 RACHEL BEYENE
Building Plans Picked Up 2/3/2022 APPLICANT
Plan Check Approved 3/22/2022 RAHEL BEYENE
Issued 4/5/2022 APPLICANT
Permit Finaled 3/28/2023 SABAS ALONSO

Permit Application Clearance Information

Historic Resource Verification Cleared 3/3/2022 MAX LODER
Redevelopment Project Area Cleared 3/15/2022 SUSAN WONG

Contact Information

Contractor Excelsior Restoration Inc; Lic. No.: 969992-B 2430 N GLASSELL ST #E      ORANGE, CA 92865
Engineer Zhong,, Raymond Meng; Lic. No.: M27635 2416 W VALLEY BLVD      ALHAMBRA, CA 91803

Inspector Information

SABAS ALONSO, (213) 202-3468 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 6/7/2022 Corrections Issued SABAS ALONSO
ELECTRICAL-Rough 6/7/2022 Approved SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 6/7/2022 Not Ready for Inspection SABAS ALONSO
HVAC-Rough 6/7/2022 Approved SABAS ALONSO
PLUMBING-Rough 6/7/2022 Corrections Issued SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 8/10/2022 Partial Approval SABAS ALONSO
BUILDING-Rough-Frame 8/16/2022 Not Ready for Inspection SABAS ALONSO
PLUMBING-Rough 8/16/2022 Approved SABAS ALONSO
BUILDING-Rough-Frame 9/2/2022 Corrections Issued ANDREW BEELI
BUILDING-Rough-Frame 10/12/2022 Corrections Issued STUART CHAPMAN
Insulation 11/15/2022 Approved SABAS ALONSO
Drywall Nailing 12/14/2022 Approved SABAS ALONSO
ELECTRICAL-Final 3/20/2023 Corrections Issued SABAS ALONSO
Final 3/20/2023 Corrections Issued SABAS ALONSO
HVAC-Final 3/20/2023 Approved SABAS ALONSO
PLUMBING-Final 3/20/2023 Approved SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 3/20/2023 SGSOV Not Ready SABAS ALONSO
Smoke Detectors 3/20/2023 Corrections Issued SABAS ALONSO
ELECTRICAL-Final 3/23/2023 Approved SABAS ALONSO
Final 3/23/2023 Corrections Issued SABAS ALONSO
HVAC-Final 3/23/2023 Approved SABAS ALONSO
PLUMBING-Final 3/23/2023 Approved SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 3/23/2023 SGSOV Not Ready SABAS ALONSO
Smoke Detectors 3/23/2023 Not Ready for Inspection SABAS ALONSO
Final 3/28/2023 Permit Finaled SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 3/28/2023 SGSOV Approved SABAS ALONSO
Smoke Detectors 3/28/2023 Approved SABAS ALONSO