1616 N MARLAY DR 90069

Certificate Information: 1616 N MARLAY DR 90069

Application / Permit
22016-10000-01622
Plan Check / Job No.
B22LA00888
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED REMODEL TO (E) 2-STORY SFD. SCOPE WILL INCLUDE INTERIOR REMODEL, KITCHEN, BATHROOMS, WINDOW/DOOR CHANGEOUT, AND NEW ELEVATOR. SCOPE WILL ALSO INCLUDE REMOVAL OF EXISTING ADU.
Permit Issued
Issued on 8/12/2022
Issuing Office
Metro
Current Status
CofO Issued on 5/16/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/23/2022 APPLICANT
Assigned to Plan Check Engineer 2/3/2022 MICHAEL LOPEZ
Corrections Issued 2/10/2022 MICHAEL LOPEZ
Quality Review Completed 2/15/2022 SEAN DANG
Applicant returned to address corrections 5/5/2022 YOUNG KIM
Applicant returned to address corrections 6/9/2022 MICHAEL LOPEZ
Applicant returned to address corrections 7/11/2022 MICHAEL LOPEZ
Plan Check Approved 8/12/2022 MICHAEL LOPEZ
Issued 8/12/2022 APPLICANT
CofO in Progress 5/2/2024 STUART CHAPMAN
CofO in Progress 5/13/2024 JOAQUIN GREENOUGH
CofO in Progress 5/13/2024 DAVID JENNINGS
CofO in Progress 5/13/2024 JOAQUIN GREENOUGH
CofO Issued 5/16/2024 DEROLD HAUFF
Permit Finaled 5/16/2024 DEROLD HAUFF

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 4/28/2022 CINDY QI
Roof/Waste drainage to street Cleared 4/28/2022 CINDY QI

Contact Information

Architect Matt,, Andrew Peter; Lic. No.: C35211 1106 SOUTH BURNSIDE AVENUE      LOS ANGELES, CA 90019
Contractor Lightning Brothers Construction; Lic. No.: 635234-B 1629 PACIFIC AVE #158      OXNARD, CA 93033
Engineer Wendt,, Randal; Lic. No.: GE2341 842 COE ST      CAMARILLO, CA 93010
Engineer Yamini,, Soly; Lic. No.: C33719 540 WARNER AVE      LOS ANGELES, CA 90024

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 8/16/2022 Conditional Approval RAUL BARAJAS
Grading Pre-Inspection 8/18/2022 Partial Inspection RAUL BARAJAS
Excavation/Setback/Form/Re-Bar 8/22/2022 Approved RAUL BARAJAS
Footing/Foundation/Slab 8/22/2022 Approved RAUL BARAJAS
Deputy Reinf. Concrete 8/23/2022 Conditional Approval RAUL BARAJAS
Reinforced Masonry Frame 9/1/2022 Approved RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 9/9/2022 Approved RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 10/28/2022 Approved RAUL BARAJAS
Floor/Roof Diaphrgm/Shear Wall 11/14/2022 Approved RAUL BARAJAS
PLUMBING-Rough 11/14/2022 Not Ready for Inspection RAUL BARAJAS
BUILDING-Rough-Frame 12/5/2022 Not Ready for Inspection RAUL BARAJAS
Green Building Rough 12/5/2022 Not Ready for Inspection RAUL BARAJAS
PLUMBING-Rough 12/5/2022 Approved RAUL BARAJAS
BUILDING-Rough-Frame 12/13/2022 Approved STUART CHAPMAN
Green Building Rough 12/13/2022 Not Ready for Inspection STUART CHAPMAN
HVAC-Rough 12/13/2022 Not Ready for Inspection STUART CHAPMAN
HVAC-Rough 12/14/2022 Approved STUART CHAPMAN
ELECTRICAL-Rough 12/21/2022 Approved STUART CHAPMAN
Interior/Exterior Lathing 12/21/2022 Not Ready for Inspection STUART CHAPMAN
Wood Frame 12/21/2022 Partial Approval STUART CHAPMAN
Interior/Exterior Lathing 12/28/2022 Partial Approval STUART CHAPMAN
Insulation 1/4/2023 Approved STUART CHAPMAN
Drywall Nailing 1/13/2023 Approved RAUL BARAJAS
Shower Pan 1/18/2023 Approved RAUL BARAJAS
Interior/Exterior Lathing 1/20/2023 Partial Approval RAUL BARAJAS
BUILDING-Rough-Frame 6/27/2023 Approved STUART CHAPMAN
Final 6/27/2023 Corrections Issued STUART CHAPMAN
Green Building Final 6/27/2023 Approved STUART CHAPMAN
Green Building Rough 6/27/2023 Approved STUART CHAPMAN
SGSOV-Seismic Gas S/O Valve 6/27/2023 SGSOV Not Ready STUART CHAPMAN
Smoke Detectors 6/27/2023 Approved STUART CHAPMAN
Final 8/28/2023 Corrections Issued STUART CHAPMAN
SGSOV-Seismic Gas S/O Valve 8/28/2023 SGSOV Approved STUART CHAPMAN
Service/Power Release 1/10/2024 Approved RAUL BARAJAS
Final 5/2/2024 OK to Issue CofO STUART CHAPMAN
Final 5/13/2024 Not Ready for Inspection JOAQUIN GREENOUGH