572 W 38TH ST 90731
Certificate Information: 572 W 38TH ST 90731
- Application / Permit
- 22016-10000-00339
- Plan Check / Job No.
- X22LA00199
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Windows (13) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. Bathroom (1) remodel for residential buildings (no structural changes). Plumbing fees included. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing ___15___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B. Replace drywall (no new walls added) for single family dwellings and duplexes only.
- Permit Issued
- Issued on 1/12/2022
- Issuing Office
- Current Status
- Permit Finaled on 5/27/2022
Permit Application Status History
| Issued | 1/12/2022 | APPLICANT |
| Permit Finaled | 5/27/2022 | ANSON MAGLASANG |
Permit Application Clearance Information
| Coastal Zone | Cleared | 1/10/2022 | YINGSHI HUANG |
Contact Information
| Contractor | Owner-Builder | , |
Inspector Information
| JOSEPH MCGARRY, (310) 732-4559 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 2/12/2022 | Approved | EUGENE CASSIDY |
| ELECTRICAL-Rough | 3/9/2022 | Approved | ANSON MAGLASANG |
| PLUMBING-Rough | 3/9/2022 | Approved | ANSON MAGLASANG |
| Sewer | 3/9/2022 | Approved | ANSON MAGLASANG |
| Drywall Nailing | 3/19/2022 | Approved | JESUS RODRIGUEZ |
| Insulation | 3/19/2022 | Approved | JESUS RODRIGUEZ |
| ELECTRICAL-Final | 5/27/2022 | Approved | ANSON MAGLASANG |
| Final | 5/27/2022 | Permit Finaled | ANSON MAGLASANG |
| PLUMBING-Final | 5/27/2022 | Approved | ANSON MAGLASANG |
| SGSOV-Seismic Gas S/O Valve | 5/27/2022 | SGSOV Approved | ANSON MAGLASANG |
| Smoke Detectors | 5/27/2022 | Approved | ANSON MAGLASANG |