1835 N OLD RANCH ROAD 90049

Certificate Information: 1835 N OLD RANCH ROAD 90049

Application / Permit
22014-30000-05932
Plan Check / Job No.
B22WL04430
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
2-story over 1-level basement storage addition to rear side of (e) single story SFD w./ att. 2-car carport
Permit Issued
Issued on 6/8/2023
Issuing Office
West Los Angeles
Current Status
CofO Issued on 6/4/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/5/2022 APPLICANT
Assigned to Plan Check Engineer 12/15/2022 REZA HAGHIGHAT
Corrections Issued 12/17/2022 REZA HAGHIGHAT
Quality Review Completed 12/21/2022 CHIHARU SUZUKI
Building Plans Picked Up 12/27/2022 APPLICANT
Applicant returned to address corrections 1/18/2023 REZA HAGHIGHAT
Plan Check Approved 5/24/2023 REZA HAGHIGHAT
Issued 6/8/2023 APPLICANT
CofO in Progress 5/30/2025 KEVIN SARGSYAN
Permit Finaled 6/4/2025 RICHARD STEINBACH
CofO Issued 6/4/2025 RICHARD STEINBACH
Permit Finaled 6/4/2025 RICHARD STEINBACH

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 1/10/2023 JENSON LEE
BHO/Hillside ordinance Cleared 1/10/2023 JENSON LEE
Eng Process Fee Ord 176,300 Cleared 1/11/2023 JENSON LEE
Sewer availability Cleared 1/11/2023 JENSON LEE
BHO/Hillside ordinance Cleared 1/19/2023 AHMED AMARRAGY
Hydrant and Access approval Cleared 2/4/2023 KURT CORRAL
BHO/Hillside ordinance Cleared 3/7/2023 JASON NG
BHO/Hillside ordinance Cleared 3/7/2023 JASON NG
Disturb/Remove Protected Trees Cleared 4/3/2023 ADALBERTO VERA
Construction within easement Cleared 4/26/2023 RIDWAN HARDY
Construction near power lines Cleared 4/27/2023 RIDWAN HARDY
Roof/Waste drainage to street Cleared 5/9/2023 HISASHI KOBAYAKAWA
Watercourse Cleared 5/9/2023 HISASHI KOBAYAKAWA
Excavation more than 5-ft deep Cleared 5/10/2023 CALOSHA APPROVED
GPI Written Notices Cleared 5/10/2023 REZA HAGHIGHAT
Grading Pre-Inspection Cleared 5/10/2023 REZA HAGHIGHAT
Low Impact Development Cleared 5/10/2023 ANTHONY VARGAS

Contact Information

Architect Crawford,, Gregory Mark; Lic. No.: C34797 556 SO FAIR OAKS AVENUE #101-14      PASADENA, CA 91105
Contractor Tosty'S Construction; Lic. No.: 550499-B 3455 CATTARAUGUS AVE      CULVER CITY, CA 90232
Engineer Mirzadeh,, Amir; Lic. No.: C58119 P O BOX 572110      TARZANA, CA 91357
Engineer Resnick,, Bruce Daniel; Lic. No.: S3293 1927 PONTIUS AVE      LOS ANGELES, CA 90025
Engineer Tran,, Quang Tai; Lic. No.: C70929 355 N LANTANA ST 333      CAMARILLO, CA 93010
Geologist Rahimikian,, Pedram; Lic. No.: EG2683 21414 ARCOS DRIVE      WOODLAND HILLS, CA 91364

Inspector Information

KEVIN SARGSYAN, (310) 914-3889 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Structural Steel Frame 7/31/2023 Partial Inspection KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 9/13/2023 Partial Approval KEVIN SARGSYAN
Deputy Reinf. Concrete 9/14/2023 Conditional Approval KEVIN SARGSYAN
BUILDING-Rough-Frame 10/10/2023 Corrections Issued KEVIN SARGSYAN
Deputy Steel/Welding 10/10/2023 Conditional Approval KEVIN SARGSYAN
Structural Steel Frame 10/10/2023 Corrections Issued KEVIN SARGSYAN
Reinforced Concrete Frame 10/12/2023 Partial Approval KEVIN SARGSYAN
Structural Steel Frame 10/12/2023 Partial Approval KEVIN SARGSYAN
Reinforced Concrete Frame 10/18/2023 Partial Approval KEVIN SARGSYAN
Deputy Reinf. Concrete 10/19/2023 Conditional Approval KEVIN SARGSYAN
Deputy Steel/Welding 12/8/2023 Conditional Approval KEVIN SARGSYAN
Footing/Foundation/Slab 12/15/2023 Conditional Approval ARAM AVEDISIAN
Reinforced Concrete Frame 1/5/2024 Partial Approval KEVIN SARGSYAN
Reinforced Concrete Frame 1/11/2024 Partial Approval KEVIN SARGSYAN
Footing/Foundation/Slab 1/29/2024 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Rough 1/29/2024 Corrections Issued KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 1/31/2024 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 1/31/2024 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 3/1/2024 Not Ready for Inspection KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 3/4/2024 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 3/5/2024 Not Ready for Inspection KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 3/13/2024 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 3/19/2024 Partial Approval KEVIN SARGSYAN
Footing/Foundation/Slab 3/20/2024 Partial Inspection KEVIN SARGSYAN
Insulation 4/8/2024 Corrections Issued KEVIN SARGSYAN
Insulation 4/10/2024 Partial Approval KEVIN SARGSYAN
HVAC-Rough 5/1/2024 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 5/13/2024 Partial Approval KEVIN SARGSYAN
HVAC-Rough 5/16/2024 Approved KEVIN SARGSYAN
PLUMBING-Rough 5/16/2024 Corrections Issued KEVIN SARGSYAN
Reinforced Concrete Frame 5/16/2024 Corrections Issued KEVIN SARGSYAN
Insulation 5/20/2024 Corrections Issued KEVIN SARGSYAN
PLUMBING-Rough 5/20/2024 Not Ready for Inspection KEVIN SARGSYAN
Footing/Foundation/Slab 5/23/2024 Partial Approval EVAN COOPER
PLUMBING-Rough 5/23/2024 Approved EVAN COOPER
Deputy Wood Construction 5/29/2024 Conditional Approval KEVIN SARGSYAN
ELECTRICAL-Rough 5/30/2024 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Rough 6/3/2024 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 6/4/2024 Partial Approval KEVIN SARGSYAN
Deputy Wood Construction 6/5/2024 Conditional Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 6/13/2024 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 6/17/2024 Not Ready for Inspection KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 6/21/2024 Approved KENNETH NAGLE
BUILDING-Rough-Frame 6/27/2024 Not Ready for Inspection KEVIN SARGSYAN
FLOOD-Proofing Certificate 6/27/2024 Approved KEVIN SARGSYAN
Green Building Rough 6/27/2024 Not Ready for Inspection KEVIN SARGSYAN
Interior/Exterior Lathing 6/27/2024 Not Ready for Inspection KEVIN SARGSYAN
Interior/Exterior Lathing 7/1/2024 Not Ready for Inspection BOBBY KEY
BUILDING-Rough-Frame 7/8/2024 Corrections Issued KEVIN SARGSYAN
Green Building Rough 7/8/2024 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 7/8/2024 Partial Approval KEVIN SARGSYAN
BUILDING-Rough-Frame 7/10/2024 Approved KEVIN SARGSYAN
Drywall Nailing 7/10/2024 Partial Approval KEVIN SARGSYAN
Insulation 7/11/2024 Not Ready for Inspection KEVIN SARGSYAN
Insulation 7/15/2024 Approved KENNETH NAGLE
Drywall Nailing 7/22/2024 Not Ready for Inspection EVAN COOPER
Interior/Exterior Lathing 7/22/2024 Approved EVAN COOPER
Drywall Nailing 7/26/2024 Approved KEVIN SARGSYAN
Sewer 8/22/2024 Approved ARAM AVEDISIAN
HVAC-Final 10/25/2024 Corrections Issued ARAM AVEDISIAN
PLUMBING-Final 10/25/2024 Corrections Issued ARAM AVEDISIAN
ELECTRICAL-Final 11/14/2024 Approved ARAM AVEDISIAN
HVAC-Final 11/14/2024 Approved ARAM AVEDISIAN
PLUMBING-Final 11/14/2024 Approved ARAM AVEDISIAN
Final 5/29/2025 OK to Issue CofO KEVIN SARGSYAN
Footing/Foundation/Slab 5/29/2025 Approved KEVIN SARGSYAN
Green Building Final 5/29/2025 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 5/29/2025 SGSOV Approved KEVIN SARGSYAN
Smoke Detectors 5/29/2025 Approved KEVIN SARGSYAN