1028-1030 S MANNING AVE 90024

Certificate Information: 1028-1030 S MANNING AVE 90024

Application / Permit
22014-30000-01279
Plan Check / Job No.
B22WL01087
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
2-story addition (1,258 sf) to (e) 2-story SFD (3,098 sf) with 1-level basement (194 sf), add subterranean 2-car garage (360 sf) with a storage (137 sf) at the front, add a 2nd unit (798 sf) per SB 9 (GCS 65852.21(b)(2)(A))
Permit Issued
Issued on 9/14/2022
Issuing Office
Current Status
Issued on 9/14/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 3/18/2022 APPLICANT
Assigned to Plan Check Engineer 3/31/2022 REZA HAGHIGHAT
Corrections Issued 4/11/2022 REZA HAGHIGHAT
Quality Review Completed 4/25/2022 CHIHARU SUZUKI
Applicant returned to address corrections 6/20/2022 REZA HAGHIGHAT
Applicant returned to address corrections 6/23/2022 REZA HAGHIGHAT
Applicant returned to address corrections 8/3/2022 REZA HAGHIGHAT
Applicant returned to address corrections 8/5/2022 REZA HAGHIGHAT
Applicant returned to address corrections 8/9/2022 REZA HAGHIGHAT
Applicant returned to address corrections 8/24/2022 REZA HAGHIGHAT
Applicant returned to address corrections 8/29/2022 REZA HAGHIGHAT
Plan Check Approved 9/10/2022 REZA HAGHIGHAT
Issued 9/14/2022 APPLICANT
Building Plans Picked Up 9/15/2022 APPLICANT

Permit Application Clearance Information

Address approval Cleared 5/6/2022 SAUL GARCIA
Permit Cleared 5/6/2022 SAUL GARCIA
Eng Process Fee Ord 176,300 Cleared 5/16/2022 SAUL GARCIA
Sewer availability Cleared 5/16/2022 SAUL GARCIA
Specific Plan Cleared 5/23/2022 EDUARDO HERMOSO
CPC Cleared 6/6/2022 MAXFIELD VERMY
Trees in Parkway Cleared 6/17/2022 ADALBERTO VERA
Low Impact Development Cleared 7/14/2022 LONDY ALVARADO
Roof/Waste drainage to street Cleared 7/16/2022 STEVEN JIN
Excavation more than 5-ft deep Cleared 7/18/2022 CALOSHA APPROVED
Senate Bill 9 Cleared 8/29/2022 MARITZA PRZEKOP
Miscellaneous Cleared 8/30/2022 REZA HAGHIGHAT
GPI Written Notices Cleared 9/10/2022 REZA HAGHIGHAT
Grading Pre-Inspection Cleared 9/10/2022 REZA HAGHIGHAT

Contact Information

Contractor Kellybaron Ventures Inc; Lic. No.: 985418-B 11301 W OLYMPIC BLVD STE 121   #802    LOS ANGELES, CA 90064
Engineer Abdo,, Khaled Abd El-Khal; Lic. No.: C57815 145 S HACIENDA ST      ANAHEIM, CA 92804
Engineer Barajas,, Alejandro Leon; Lic. No.: S4773 565 PEARL ST STE 209      LA JOLLA, CA 92037
Geologist , ; Lic. No.: GEO740 10954 SANTA MONICA BLVD      LOS ANGELES, CA 90025

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/26/2022 Approved CARLOS MATAMOROS
Excavation/Setback/Form/Re-Bar 11/16/2022 Corrections Issued STEPHANIE SWANSON
Footing/Foundation/Slab 11/16/2022 Corrections Issued STEPHANIE SWANSON
Footing/Foundation/Slab 11/16/2022 Partial Approval STEPHANIE SWANSON
METHANE-Barrier 11/16/2022 Approved STEPHANIE SWANSON
METHANE-Subgrade 11/16/2022 Approved STEPHANIE SWANSON
Footing/Foundation/Slab 11/17/2022 Partial Approval STEPHANIE SWANSON
Deputy Reinf. Concrete 11/18/2022 Conditional Approval STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 12/2/2022 Partial Approval STEPHANIE SWANSON
Footing/Foundation/Slab 12/2/2022 Partial Approval STEPHANIE SWANSON
Footing/Foundation/Slab 12/6/2022 Partial Approval STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 5/10/2023 Partial Approval BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 5/10/2023 Corrections Issued BRENDAN LOONEY
Floor/Roof Diaphrgm/Shear Wall 6/7/2023 Partial Approval STEPHANIE SWANSON
Footing/Foundation/Slab 6/7/2023 Corrections Issued STEPHANIE SWANSON
PLUMBING-Rough 6/7/2023 Corrections Issued STEPHANIE SWANSON
Footing/Foundation/Slab 6/8/2023 Partial Approval STEPHANIE SWANSON
Piling/Pier/Caisson 6/20/2023 Partial Approval MICHAEL PELHAM
Deputy Reinf. Concrete 6/21/2023 Conditional Approval STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 7/5/2023 Partial Approval STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 7/12/2023 Partial Approval STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 7/13/2023 Partial Approval STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 7/25/2023 Partial Approval STEPHANIE SWANSON
Footing/Foundation/Slab 8/29/2023 Partial Approval STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 10/13/2023 Partial Approval STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 10/13/2023 Corrections Issued STEPHANIE SWANSON
ELECTRICAL-Rough 10/23/2023 Partial Approval STEPHANIE SWANSON
Footing/Foundation/Slab 11/6/2023 Partial Approval STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 11/15/2023 Partial Approval STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 12/5/2023 Approved STEPHANIE SWANSON
Footing/Foundation/Slab 1/18/2024 Partial Approval STEPHANIE SWANSON
Deputy Reinf. Concrete 1/19/2024 Conditional Approval STEPHANIE SWANSON
PLUMBING-Rough 1/19/2024 Partial Approval STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 2/2/2024 Corrections Issued STEPHANIE SWANSON
Deputy Shotcrete 2/5/2024 Conditional Approval STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 2/5/2024 Partial Approval STEPHANIE SWANSON
Footing/Foundation/Slab 7/15/2024 Partial Approval STEPHANIE SWANSON
Excavation/Setback/Form/Re-Bar 8/6/2024 Partial Approval STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 8/27/2024 Corrections Issued SEAN HAUPT
Floor/Roof Diaphrgm/Shear Wall 8/28/2024 Partial Approval STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 9/9/2024 Partial Approval STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 10/15/2024 Partial Approval STEPHANIE SWANSON
Footing/Foundation/Slab 10/15/2024 Approved STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 10/25/2024 Corrections Issued STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 10/31/2024 Partial Approval CARLOS MATAMOROS
PLUMBING-Rough 11/1/2024 Partial Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 11/4/2024 Partial Approval STEPHANIE SWANSON
Interior/Exterior Lathing 2/3/2025 Partial Approval STEPHANIE SWANSON
PLUMBING-Rough 2/21/2025 Corrections Issued STEPHANIE SWANSON
PLUMBING-Rough 2/24/2025 Partial Approval STEPHANIE SWANSON
Shower Pan 2/27/2025 Corrections Issued STEPHANIE SWANSON
Shower Pan 3/4/2025 Approved REGINA MENDEZ
ELECTRICAL-Rough 3/26/2025 Partial Approval DANIEL VERA
BUILDING-Rough-Frame 4/9/2025 Not Ready for Inspection DANIEL VERA
Green Building Rough 4/9/2025 Not Ready for Inspection DANIEL VERA
HVAC-Rough 4/9/2025 Not Ready for Inspection DANIEL VERA
METHANE-Rough 4/9/2025 Approved DANIEL VERA
Interior/Exterior Lathing 4/22/2025 Partial Approval DANIEL VERA
HVAC-Rough 4/24/2025 No Access for Inspection MEL KHACHATOURIAN
HVAC-Rough 4/25/2025 Corrections Issued DANIEL VERA
BUILDING-Rough-Frame 5/1/2025 Not Ready for Inspection CHRISTOPHER WILSON
Green Building Rough 5/1/2025 Not Ready for Inspection CHRISTOPHER WILSON
HVAC-Rough 5/1/2025 Not Ready for Inspection CHRISTOPHER WILSON
Pre-Inspection 5/1/2025 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 5/1/2025 Approved CHRISTOPHER WILSON
BUILDING-Rough-Frame 5/2/2025 Conditional Approval DANIEL VERA
Green Building Rough 5/2/2025 Approved DANIEL VERA
HVAC-Rough 5/2/2025 Approved DANIEL VERA
Insulation 5/7/2025 Partial Approval SEAN HAUPT
Drywall Nailing 5/13/2025 Partial Approval DANIEL VERA
Drywall Nailing 5/22/2025 Partial Approval DANIEL VERA
ELECTRICAL-Rough 5/22/2025 Approved DANIEL VERA
Drywall Nailing 5/28/2025 Not Ready for Inspection DANIEL VERA
Insulation 5/28/2025 Approved DANIEL VERA
Special/Order Compliance 5/28/2025 Corrections Issued DANIEL VERA
Drywall Nailing 6/13/2025 Approved DANIEL VERA
Interior/Exterior Lathing 6/24/2025 Approved TEMISTOCLES CAAL
PLUMBING-Rough 8/19/2025 Not Ready for Inspection DANIEL VERA
Underground Mechanical 8/19/2025 Partial Approval DANIEL VERA
Underground Mechanical 10/3/2025 Approved DANIEL VERA
Excavation/Setback/Form/Re-Bar 2/2/2026 Approved EVAN COOPER
Deputy Reinf. Concrete 2/3/2026 Conditional Approval RYAN SALAZAR
Service/Power Release 4/13/2026 Approved RYAN SALAZAR
Footing/Foundation/Slab 4/15/2026 Approved EVAN COOPER
Deputy Reinf. Concrete 5/22/2026 Conditional Approval ANDREW NAVE