4820 S COOLIDGE AVE 90230

Certificate Information: 4820 S COOLIDGE AVE 90230

Application / Permit
22014-30000-00936
Plan Check / Job No.
B22WL00775
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
substantial demolition of site and existing single story family residence and construction of a two story S.F.R., roof deck. *** 1 of 2 ***
Permit Issued
Issued on 10/14/2022
Issuing Office
Current Status
Issued on 10/14/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 3/1/2022 APPLICANT
Assigned to Plan Check Engineer 3/10/2022 KAVIAN REFAHI
Corrections Issued 3/17/2022 KAVIAN REFAHI
Quality Review Completed 3/25/2022 FELIX FIGUEROA
Applicant returned to address corrections 7/14/2022 KAVIAN REFAHI
Applicant returned to address corrections 8/5/2022 KAVIAN REFAHI
Applicant returned to address corrections 8/8/2022 KAVIAN REFAHI
Plan Check Approved 8/8/2022 KAVIAN REFAHI
Issued 10/14/2022 APPLICANT
Building Plans Picked Up 10/26/2022 APPLICANT

Permit Application Clearance Information

Permit Cleared 4/23/2022 STEVEN JIN
Sewer availability Cleared 4/23/2022 STEVEN JIN
Trees in Parkway Cleared 6/17/2022 ADALBERTO VERA
Low Impact Development Cleared 8/4/2022 CHRIS VONG
Eng Process Fee Ord 176,300 Cleared 8/5/2022 ANTHONY MAINEZ
Roof/Waste drainage to street Cleared 8/5/2022 ANTHONY MAINEZ

Contact Information

Contractor Crescenta Valley Engineering Inc; Lic. No.: 523164-B 2801 E FOOTHILL BLVD      PASADENA, CA 91107
Engineer Attaalla,, Sayed Ahmed; Lic. No.: S5339 11254 HANNUM AVE      CULVER CITY, CA 90230

Inspector Information

DAKOTA LOW, (310) 914-3895 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 12/6/2022 No Access for Inspection JESUS RODRIGUEZ
Pre-Inspection 12/12/2022 Not Ready for Inspection JESUS RODRIGUEZ
Excavation/Setback/Form/Re-Bar 6/13/2023 Partial Approval JESUS RODRIGUEZ
Structural Steel Frame 7/27/2023 Conditional Approval HERBERT GIRON
Deputy Drilled-In Anchors 8/2/2023 Conditional Approval JESUS RODRIGUEZ
Footing/Foundation/Slab 8/4/2023 Corrections Issued HERBERT GIRON
Excavation/Setback/Form/Re-Bar 8/8/2023 Approved JESUS RODRIGUEZ
Footing/Foundation/Slab 8/8/2023 Approved JESUS RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 9/1/2023 Partial Approval JESUS RODRIGUEZ
PLUMBING-Rough 9/1/2023 Corrections Issued JESUS RODRIGUEZ
PLUMBING-Rough 9/22/2023 Approved TEMISTOCLES CAAL
Insulation 9/26/2023 Partial Approval JESUS RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 9/29/2023 Partial Approval JESUS RODRIGUEZ
Deputy Steel/Welding 12/7/2023 Conditional Approval RICHARD STEINBACH
Structural Steel Frame 12/13/2023 Approved JESUS RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 6/27/2024 Corrections Issued TEMISTOCLES CAAL
Deputy Wood Construction 7/2/2024 Conditional Approval JESUS RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 7/8/2024 Partial Approval JESUS RODRIGUEZ
Deputy Reinf. Concrete 7/9/2024 Conditional Approval JESUS RODRIGUEZ
Footing/Foundation/Slab 8/16/2024 Approved JESUS RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 10/11/2024 Corrections Issued JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 10/28/2024 Corrections Issued ARAM AVEDISIAN
Floor/Roof Diaphrgm/Shear Wall 10/29/2024 Partial Approval JESUS PINEDA
PLUMBING-Rough 5/12/2025 Approved MICHAEL ALLEN
Special/Order Compliance 5/12/2025 Corrections Issued MICHAEL ALLEN
ELECTRICAL-Rough 8/5/2025 Corrections Issued MICHAEL ALLEN
Excavation/Setback/Form/Re-Bar 8/5/2025 Approved MICHAEL ALLEN
Footing/Foundation/Slab 8/5/2025 Approved MICHAEL ALLEN
ELECTRICAL-Rough 8/19/2025 Partial Approval RUBEN RIVAS
Floor/Roof Diaphrgm/Shear Wall 8/19/2025 Corrections Issued RUBEN RIVAS
HVAC-Rough 9/2/2025 Not Ready for Inspection RUBEN RIVAS
HVAC-Rough 9/5/2025 Approved WILBER ROSALES
BUILDING-Rough-Frame 9/23/2025 Corrections Issued WILBER ROSALES
Green Building Rough 9/23/2025 Partial Approval WILBER ROSALES
MERV13>=Rough 9/23/2025 Approved WILBER ROSALES
Verify Sprinkler Sign Off 9/23/2025 Approved WILBER ROSALES
BUILDING-Rough-Frame 10/15/2025 Approved WILBER ROSALES
Green Building Rough 10/15/2025 Approved WILBER ROSALES
Interior/Exterior Lathing 10/15/2025 Partial Approval WILBER ROSALES
Insulation 10/28/2025 Corrections Issued RUBEN RIVAS
Insulation 10/31/2025 Approved WILBER ROSALES
Drywall Nailing 11/7/2025 Approved RUBEN RIVAS
Shower Pan 12/17/2025 Approved JESUS PINEDA
Interior/Exterior Lathing 1/15/2026 Approved DAKOTA LOW
Shower Pan 1/15/2026 Approved DAKOTA LOW