2007 N SERRANO AVE 90027

Certificate Information: 2007 N SERRANO AVE 90027

Application / Permit
22014-20000-05215
Plan Check / Job No.
B22VN15702
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) 18-0" X 20'-0" GARAGE WITH 30'-4" X 16'-10" IRREGULAR SHAPED ADDITION TO AN ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) and (d). WORK DONE PER ENGINEER.
Permit Issued
Issued on 12/12/2022
Issuing Office
Valley
Current Status
CofO Issued on 5/28/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/21/2022 APPLICANT
Assigned to Plan Check Engineer 10/23/2022 ARTIN ZARUKIAN
Corrections Issued 11/4/2022 ARTIN ZARUKIAN
Building Plans Picked Up 11/8/2022 APPLICANT
Plan Check Approved 12/5/2022 MIROOSH KHACHATOORIAN
Issued 12/12/2022 APPLICANT
CofO in Progress 5/21/2024 BRIAN SULLIVAN
Permit Finaled 5/28/2024 RONALD MYRICK
CofO Issued 5/28/2024 RONALD MYRICK
Permit Finaled 5/28/2024 RONALD MYRICK

Permit Application Clearance Information

Address approval Cleared 11/17/2022 CHRISTOPHER ROCHA
Roof/Waste drainage to street Cleared 11/17/2022 CHRISTOPHER ROCHA
Grading Pre-Inspection Cleared 11/21/2022 KIRK LINKLATER
Eng Process Fee Ord 176,300 Cleared 11/30/2022 AMAAN MALIK
Sewer availability Cleared 11/30/2022 AMAAN MALIK
Construction near power lines Cleared 12/5/2022 TINA MIRANDA

Contact Information

Contractor Ts Construction & Design Inc; Lic. No.: 1064916-B 18375 VENTURA BLVD #375      TARZANA, CA 91356
Engineer Helou,, Dawn Renee; Lic. No.: C52361 22701 ERWIN ST      WOODLAND HILLS, CA 91367

Inspector Information

CRAIG VAUGHAN, (213) 202-3250 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 12/15/2022 Conditional Approval JOAQUIN GREENOUGH
PLUMBING-Rough 12/19/2022 Partial Approval JOAQUIN GREENOUGH
Excavation/Setback/Form/Re-Bar 12/20/2022 Approved JOAQUIN GREENOUGH
Deputy Drilled-In Anchors 1/9/2023 Conditional Approval JOAQUIN GREENOUGH
BUILDING-Rough-Frame 1/31/2023 Not Ready for Inspection JOAQUIN GREENOUGH
ELECTRICAL-Rough 1/31/2023 Approved JOAQUIN GREENOUGH
Floor/Roof Diaphrgm/Shear Wall 1/31/2023 Not Ready for Inspection JOAQUIN GREENOUGH
Green Building Rough 1/31/2023 Not Ready for Inspection JOAQUIN GREENOUGH
HVAC-Rough 1/31/2023 Corrections Issued JOAQUIN GREENOUGH
PLUMBING-Rough 1/31/2023 Corrections Issued JOAQUIN GREENOUGH
HVAC-Rough 2/2/2023 Approved JOAQUIN GREENOUGH
PLUMBING-Rough 2/2/2023 Approved JOAQUIN GREENOUGH
BUILDING-Rough-Frame 2/3/2023 Corrections Issued JOAQUIN GREENOUGH
Green Building Rough 2/3/2023 Not Ready for Inspection JOAQUIN GREENOUGH
Insulation 2/13/2023 Corrections Issued RUBEN SALAS
BUILDING-Rough-Frame 2/22/2023 Approved JOAQUIN GREENOUGH
Green Building Rough 2/22/2023 Approved JOAQUIN GREENOUGH
Insulation 3/13/2023 Approved STUART CHAPMAN
Interior/Exterior Lathing 3/13/2023 Partial Approval STUART CHAPMAN
Drywall Nailing 3/17/2023 Approved BRIAN SULLIVAN
Shower Pan 3/17/2023 Approved BRIAN SULLIVAN
ELECTRICAL-Final 5/10/2024 Approved BRIAN SULLIVAN
Final 5/10/2024 Corrections Issued BRIAN SULLIVAN
Footing/Foundation/Slab 5/10/2024 Approved BRIAN SULLIVAN
Green Building Final 5/10/2024 Approved BRIAN SULLIVAN
HVAC-Final 5/10/2024 Approved BRIAN SULLIVAN
PLUMBING-Final 5/10/2024 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 5/10/2024 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 5/10/2024 Approved BRIAN SULLIVAN
Final 5/20/2024 OK to Issue CofO BRIAN SULLIVAN