7843 S BRIGHTON AVE 90047

Certificate Information: 7843 S BRIGHTON AVE 90047

Application / Permit
22014-20000-04508
Plan Check / Job No.
B22VN13663
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED IRR SHAPED 14'9"X24'6" BEDRM, BATH, CLOSET ADDN @ REAR OF EX 1-STORY SFD. ALL WORK PER ENGR DESIGN
Permit Issued
Issued on 12/21/2022
Issuing Office
Valley
Current Status
CofO Issued on 3/21/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/9/2022 APPLICANT
Assigned to Plan Check Engineer 9/13/2022 YAQUB MIRZA
Corrections Issued 9/13/2022 YAQUB MIRZA
Building Plans Picked Up 9/20/2022 APPLICANT
Plan Check Approved 11/22/2022 HAYATO TSUCHIYA
Issued 12/21/2022 APPLICANT
CofO in Progress 3/20/2026 JOHN QUINTANILLA
Permit Finaled 3/21/2026 DEROLD HAUFF
CofO Issued 3/21/2026 DEROLD HAUFF
Permit Finaled 3/21/2026 DEROLD HAUFF

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 11/16/2022 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 11/17/2022 WALLIE JONG

Contact Information

Contractor A G A Construction Inc; Lic. No.: 918705-B 18375 VENTURA BLVD #548      TARZANA, CA 91356
Engineer Sabzehzar,, Habib; Lic. No.: C50442 8180 N PRICE AVE      FRESNO, CA 93720

Inspector Information

JOHN QUINTANILLA, (213) 792-6055 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

SGSOV-Seismic Gas S/O Valve 1/6/2023 SGSOV Not Ready LILIANA PORTILLO
Pre-Inspection 1/12/2023 Approved ENRIQUE MIRELES
Footing/Foundation/Slab 1/27/2023 Approved LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 2/22/2023 Corrections Issued LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 3/7/2023 Partial Approval LILIANA PORTILLO
PLUMBING-Rough 3/7/2023 Partial Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 3/22/2023 Partial Approval LILIANA PORTILLO
Insulation 3/22/2023 Partial Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 4/4/2023 Partial Approval JOAQUIN GREENOUGH
ELECTRICAL-Rough 5/1/2023 Approved MICHAEL LEWIS
HVAC-Rough 5/1/2023 Approved MICHAEL LEWIS
PLUMBING-Rough 5/1/2023 Approved MICHAEL LEWIS
Deputy Wood Construction 5/4/2023 Approved MICHAEL LEWIS
Insulation 5/12/2023 Approved MICHAEL LEWIS
Interior/Exterior Lathing 5/12/2023 Approved MICHAEL LEWIS
Drywall Nailing 5/17/2023 Approved MICHAEL LEWIS
Green Building Rough 5/17/2023 Approved MICHAEL LEWIS
BUILDING-Rough-Frame 6/12/2023 Approved STUART CHAPMAN
Final 6/12/2023 Corrections Issued STUART CHAPMAN
Green Building Final 6/12/2023 Approved STUART CHAPMAN
SGSOV-Seismic Gas S/O Valve 6/12/2023 SGSOV Approved STUART CHAPMAN
Smoke Detectors 6/12/2023 Approved STUART CHAPMAN
Final 6/27/2023 Partial Inspection MICHAEL LEWIS
Final 3/2/2026 Corrections Issued LUIS CASTRO
Final 3/13/2026 OK to Issue CofO JOHN QUINTANILLA