7702-7704 N TWINING WAY 91304

Certificate Information: 7702-7704 N TWINING WAY 91304

Application / Permit
22014-20000-03139
Plan Check / Job No.
B22VN09767
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
**EPLAN** CONVERT ATTACHED GARAGE (414 SF) AND PORTION (237 SF) OF SINGLE FAMILY DWELLING TO ACCESSORY DWELLING UNIT [7704 N Twining Way, 651 SF] PER [CA Govt. Code 65852.2(e)(1)(A)] . CONSTRUCTION WORK IS PER ENGINEERED DESIGN . (NFPA 13R FIRE SPRINKLERS THRU-OUT)
Permit Issued
Issued on 9/16/2022
Issuing Office
Current Status
CofO Issued on 10/7/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/23/2022 APPLICANT
Assigned to Plan Check Engineer 7/1/2022 RACHEL BEYENE
Corrections Issued 7/3/2022 RACHEL BEYENE
Applicant returned to address corrections 8/23/2022 GEORGE ALVAREZ
Applicant returned to address corrections 8/31/2022 RACHEL BEYENE
Plan Check Approved 9/2/2022 RAHEL BEYENE
Issued 9/16/2022 APPLICANT
CofO in Progress 9/10/2024 ARUTYUN MADATYAN
Permit Finaled 10/7/2024 JOHN JANSON
CofO Issued 10/7/2024 JOHN JANSON
Permit Finaled 10/7/2024 JOHN JANSON

Permit Application Clearance Information

Address approval Cleared 8/18/2022 JOSE DUARTE-DIAZ
Eng Process Fee Ord 176,300 Cleared 8/18/2022 JOSE DUARTE-DIAZ
Sewer availability Cleared 8/18/2022 JOSE DUARTE-DIAZ
"T" removal Cleared 8/22/2022 MIGUEL GAMBOA
ZA Case Cleared 8/22/2022 MIGUEL GAMBOA

Contact Information

Contractor W T B Construction; Lic. No.: 624763-B P O BOX 800277      SANTA CLARITA, CA 91380
Engineer Gosen,, James W; Lic. No.: C43590 15315 BLEDSOE ST      SYLMAR, CA 91342

Inspector Information

ALEXANDER HANDY, (818) 774-4317 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 10/25/2022 Corrections Issued STEVEN BACK
Pre-Inspection 10/25/2022 Partial Inspection STEVEN BACK
Pre-Inspection 11/10/2022 Partial Inspection STEVEN BACK
PLUMBING-Rough 12/16/2022 Partial Approval ALEXANDER HANDY
BUILDING-Rough-Frame 1/26/2023 Corrections Issued ALEXANDER HANDY
ELECTRICAL-Rough 1/26/2023 Corrections Issued ALEXANDER HANDY
HVAC-Rough 1/26/2023 Approved ALEXANDER HANDY
PLUMBING-Rough 1/26/2023 Approved ALEXANDER HANDY
BUILDING-Rough-Frame 2/1/2023 Not Ready for Inspection ALEXANDER HANDY
ELECTRICAL-Rough 2/1/2023 Approved ALEXANDER HANDY
Insulation 2/1/2023 Approved ALEXANDER HANDY
BUILDING-Rough-Frame 2/6/2023 Approved JESUS PINEDA
Drywall Nailing 2/6/2023 Approved JESUS PINEDA
Green Building Rough 2/6/2023 Approved JESUS PINEDA
Interior/Exterior Lathing 2/6/2023 Partial Approval JESUS PINEDA
Verify Sprinkler Sign Off 2/6/2023 Approved JESUS PINEDA
Interior/Exterior Lathing 3/1/2023 Partial Approval ALEXANDER HANDY
Shower Pan 3/1/2023 Approved ALEXANDER HANDY
Final 5/30/2023 Corrections Issued ALEXANDER HANDY
Footing/Foundation/Slab 5/30/2023 Approved ALEXANDER HANDY
Green Building Final 5/30/2023 Not Ready for Inspection ALEXANDER HANDY
SGSOV-Seismic Gas S/O Valve 5/30/2023 SGSOV Not Ready ALEXANDER HANDY
Smoke Detectors 5/30/2023 Approved ALEXANDER HANDY
Final 2/6/2024 Not Ready for Inspection MORRIS JACKSON
Green Building Final 2/6/2024 Not Ready for Inspection MORRIS JACKSON
SGSOV-Seismic Gas S/O Valve 2/6/2024 SGSOV Approved MORRIS JACKSON
Pre-Inspection 8/29/2024 Corrections Issued ALEXANDER HANDY
ELECTRICAL-Final 9/9/2024 Approved ARUTYUN MADATYAN
Final 9/9/2024 OK to Issue CofO ARUTYUN MADATYAN
Green Building Final 9/9/2024 Approved ARUTYUN MADATYAN
HVAC-Final 9/9/2024 Approved ARUTYUN MADATYAN
PLUMBING-Final 9/9/2024 Approved ARUTYUN MADATYAN