9628 W CRESTA DR 90035

Certificate Information: 9628 W CRESTA DR 90035

Application / Permit
22014-20000-02583
Plan Check / Job No.
B22VN08178
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMOVE (E) TRELLIS, BEDROOM, BATHROOM AND CLOSET. CONVERT (E) PATIO COVER TO ENLARGE / REMODEL KITCHEN. INTERIOR REMODEL THROUGHOUT SFD TO RELOCATE LIVING ROOM, LAUNDRY ROOM, BATHROOM, AND BEDROOM; AND TO ADD NEW BEDROOM AND BATHROOM. ADD NEW 14' X 30'PATIO COVER.
Permit Issued
Issued on 8/2/2022
Issuing Office
Valley
Current Status
CofO Issued on 2/22/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/26/2022 APPLICANT
Assigned to Plan Check Engineer 5/31/2022 JEROME MAGAT PALMA
Corrections Issued 5/31/2022 JEROME MAGAT PALMA
Applicant returned to address corrections 7/15/2022 ALEC MOUSAKHANIAN
Building Plans Picked Up 7/20/2022 APPLICANT
Issued 8/2/2022 APPLICANT
CofO in Progress 2/12/2024 OGANES TARAKHCHYAN
Permit Finaled 2/22/2024 DANIEL ORRANTE
CofO Issued 2/22/2024 DANIEL ORRANTE
Permit Finaled 2/22/2024 DANIEL ORRANTE

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 6/28/2022 JENSON LEE
Grading Pre-Inspection Cleared 7/15/2022 JEROME MAGAT PALMA
Roof/Waste drainage to street Cleared 7/25/2022 JENSON LEE

Contact Information

Contractor P M A Renovations; Lic. No.: 1033506-B 17941 VENTURA BLVD #204      ENCINO, CA 91316
Engineer Hsiao,, Stephanie; Lic. No.: C75937 255 N MICHIGAN AVE #5      PASADENA, CA 91106

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 11/21/2022 Corrections Issued OGANES TARAKHCHYAN
METHANE-Barrier 11/21/2022 Not Ready for Inspection OGANES TARAKHCHYAN
METHANE-Subgrade 11/21/2022 Not Ready for Inspection OGANES TARAKHCHYAN
Pre-Inspection 11/28/2022 Approved OGANES TARAKHCHYAN
Footing/Foundation/Slab 3/7/2023 Conditional Approval JESUS RODRIGUEZ
METHANE-Barrier 3/7/2023 Approved JESUS RODRIGUEZ
METHANE-Subgrade 3/7/2023 Approved JESUS RODRIGUEZ
ELECTRICAL-Rough 3/24/2023 Not Ready for Inspection ASHLEY THOMPSON
Floor/Roof Diaphrgm/Shear Wall 3/24/2023 Partial Approval ASHLEY THOMPSON
HVAC-Rough 3/24/2023 Conditional Approval ASHLEY THOMPSON
PLUMBING-Rough 3/24/2023 Approved ASHLEY THOMPSON
Deputy Wood Construction 3/28/2023 Conditional Approval ASHLEY THOMPSON
Shower Pan 4/14/2023 Corrections Issued CLAYTON GRAHAM
Shower Pan 4/19/2023 Approved CLAYTON GRAHAM
Interior/Exterior Lathing 4/24/2023 Approved JEREMY TODD
Wood Frame 4/24/2023 Approved JEREMY TODD
Pre-Inspection 5/1/2023 Not Ready for Inspection CLAYTON GRAHAM
Interior/Exterior Lathing 5/4/2023 Approved JEREMY TODD
ELECTRICAL-Rough 5/19/2023 Approved CLAYTON GRAHAM
Insulation 6/5/2023 Corrections Issued CHRISTOPHER WILSON
Green Building Rough 6/7/2023 Corrections Issued CLAYTON GRAHAM
Wood Frame 6/7/2023 Corrections Issued CLAYTON GRAHAM
BUILDING-Rough-Frame 6/9/2023 Approved CLAYTON GRAHAM
Insulation 6/9/2023 Not Ready for Inspection CLAYTON GRAHAM
BUILDING-Rough-Frame 6/13/2023 Approved CLAYTON GRAHAM
Green Building Rough 6/13/2023 Approved CLAYTON GRAHAM
HVAC-Rough 6/13/2023 Approved CLAYTON GRAHAM
Insulation 6/13/2023 Approved CLAYTON GRAHAM
Drywall Nailing 6/23/2023 Approved JESUS PINEDA
Final 12/26/2023 Not Ready for Inspection MEL KHACHATOURIAN
Footing/Foundation/Slab 12/26/2023 Approved MEL KHACHATOURIAN
Green Building Final 12/26/2023 Not Ready for Inspection MEL KHACHATOURIAN
METHANE-Final 12/26/2023 Not Ready for Inspection MEL KHACHATOURIAN
SGSOV-Seismic Gas S/O Valve 12/26/2023 SGSOV Not Ready MEL KHACHATOURIAN
Smoke Detectors 12/26/2023 Not Ready for Inspection MEL KHACHATOURIAN
Gas Test 1/3/2024 Approved OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 1/3/2024 SGSOV Not Ready OGANES TARAKHCHYAN
Service/Power Release 1/3/2024 Approved OGANES TARAKHCHYAN
HVAC-Final 1/10/2024 Approved OGANES TARAKHCHYAN
PLUMBING-Final 1/10/2024 Approved OGANES TARAKHCHYAN
ELECTRICAL-Final 1/12/2024 Approved OGANES TARAKHCHYAN
Green Building Final 1/12/2024 Approved OGANES TARAKHCHYAN
Smoke Detectors 1/12/2024 Not Ready for Inspection OGANES TARAKHCHYAN
Final 1/30/2024 Corrections Issued OGANES TARAKHCHYAN
METHANE-Final 1/30/2024 Approved OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 1/30/2024 SGSOV Approved OGANES TARAKHCHYAN
Smoke Detectors 1/30/2024 Approved OGANES TARAKHCHYAN
Final 2/2/2024 Not Ready for Inspection OGANES TARAKHCHYAN
Final 2/9/2024 OK to Issue CofO OGANES TARAKHCHYAN