6427 N RHODES AVE 91606

Certificate Information: 6427 N RHODES AVE 91606

Application / Permit
22014-20000-01690
Plan Check / Job No.
B22VN05476
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
23'-11" X 20' ADDITION TO AND CONVERT DETACHED GARAGE TO ACCESSORY DWELLING UNIT (760 SQ FT) PER LAMC 12.22 A.33(c) and (d)
Permit Issued
Issued on 6/3/2022
Issuing Office
Current Status
CofO Issued on 1/25/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/11/2022 APPLICANT
Assigned to Plan Check Engineer 4/16/2022 JEROME MAGAT PALMA
Corrections Issued 4/16/2022 JEROME MAGAT PALMA
Plan Check Approved 5/22/2022 JEROME MAGAT PALMA
Issued 6/3/2022 APPLICANT
Building Plans Picked Up 6/6/2022 APPLICANT
Permit Finaled-Status Void 1/9/2023 JOHN COLEMAN
Re-Activate Permit 1/10/2023 JOHN COLEMAN
CofO in Progress 1/10/2023 JOHN COLEMAN
CofO Issued 1/25/2023 MICHAEL SMITH
Permit Finaled 1/25/2023 MICHAEL SMITH

Permit Application Clearance Information

Address approval Cleared 4/20/2022 JOSE DUARTE-DIAZ
Eng Process Fee Ord 176,300 Cleared 4/21/2022 JOSE DUARTE-DIAZ
Sewer availability Cleared 4/28/2022 JOSE DUARTE-DIAZ
Roof/Waste drainage to street Cleared 5/17/2022 JOSE DUARTE-DIAZ

Contact Information

Contractor Owner-Builder       ,

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 6/13/2022 No Access for Inspection CHRISTOPHE COCHRAN
Footing/Foundation/Slab 6/13/2022 Corrections Issued CHRISTOPHE COCHRAN
PLUMBING-Rough 6/13/2022 Corrections Issued CHRISTOPHE COCHRAN
Deputy Drilled-In Anchors 6/15/2022 Conditional Approval MATT KELLERMAN
Footing/Foundation/Slab 6/16/2022 Corrections Issued CHRISTOPHE COCHRAN
Sewer 6/16/2022 Partial Approval CHRISTOPHE COCHRAN
Underground Mechanical 6/16/2022 Partial Approval CHRISTOPHE COCHRAN
Deputy Drilled-In Anchors 6/23/2022 Approved RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 6/23/2022 Not Ready for Inspection RAFAEL CORTES
Footing/Foundation/Slab 6/23/2022 Partial Approval RAFAEL CORTES
Underground Mechanical 6/23/2022 Not Ready for Inspection RAFAEL CORTES
Deputy Drilled-In Anchors 6/28/2022 Partial Approval RAFAEL CORTES
Footing/Foundation/Slab 6/29/2022 Approved RAFAEL CORTES
Underground Mechanical 6/29/2022 Approved RAFAEL CORTES
Underground Mechanical 7/11/2022 Corrections Issued RAFAEL CORTES
PLUMBING-Final 7/15/2022 Corrections Issued RAFAEL CORTES
Gas Test 7/20/2022 Approved RAFAEL CORTES
BUILDING-Rough-Frame 8/2/2022 Not Ready for Inspection RAFAEL CORTES
ELECTRICAL-Rough 8/2/2022 Not Ready for Inspection RAFAEL CORTES
Green Building Rough 8/2/2022 Not Ready for Inspection RAFAEL CORTES
MERV13>=Rough 8/2/2022 Not Ready for Inspection RAFAEL CORTES
PLUMBING-Rough 8/2/2022 Not Ready for Inspection RAFAEL CORTES
Wood Frame 8/2/2022 Not Ready for Inspection RAFAEL CORTES
Pre-Inspection 8/11/2022 Approved RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 8/17/2022 Partial Approval RAFAEL CORTES
ELECTRICAL-Rough 9/8/2022 Approved RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 9/8/2022 Corrections Issued RAFAEL CORTES
Interior/Exterior Lathing 9/8/2022 Corrections Issued RAFAEL CORTES
PLUMBING-Rough 9/8/2022 Corrections Issued RAFAEL CORTES
BUILDING-Rough-Frame 9/15/2022 Approved RAFAEL CORTES
Green Building Rough 9/15/2022 Approved RAFAEL CORTES
HVAC-Rough 9/15/2022 Corrections Issued RAFAEL CORTES
MERV13>=Rough 9/15/2022 Approved RAFAEL CORTES
PLUMBING-Rough 9/15/2022 Approved RAFAEL CORTES
Underground Mechanical 9/15/2022 Approved RAFAEL CORTES
Insulation 9/22/2022 Approved RAFAEL CORTES
Drywall Nailing 9/28/2022 Approved RAFAEL CORTES
Final 12/21/2022 Corrections Issued KIRK SANDERS
Green Building Final 12/21/2022 Approved KIRK SANDERS
MERV13>=Final 12/21/2022 Approved KIRK SANDERS
SGSOV-Seismic Gas S/O Valve 12/21/2022 SGSOV Not Ready KIRK SANDERS
Smoke Detectors 12/21/2022 Approved KIRK SANDERS
Final 12/23/2022 Corrections Issued ARAM AVEDISIAN
Final 12/29/2022 Not Ready for Inspection JOHN COLEMAN
SGSOV-Seismic Gas S/O Valve 12/29/2022 SGSOV Not Ready JOHN COLEMAN
Final 1/9/2023 OK to Issue CofO JOHN COLEMAN
SGSOV-Seismic Gas S/O Valve 1/9/2023 SGSOV Approved JOHN COLEMAN