1542 N MURRAY CIR 90026

Certificate Information: 1542 N MURRAY CIR 90026

Application / Permit
22014-20000-01205
Plan Check / Job No.
B22VN03945
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
7'- 4 3/4" x 5' (37 SQ. FT.) ADDITION TO THE (E) MASTER BEDROOM, AND REPLACE THE DAMAGED ROOF OVER THE MASTER BEDROOM. ADD 7'-4 3/4" x 21'-10 1/2" (75 SQ. FT.) TO THE COVERED ENTRY AND REPLACE THE DAMAGED ROOF OVER THE COVERED ENTRY. REPLACE (15 WINDOWS, (4) EXTERIOR DOORS AND (6) INTERIOR DOORS. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 4/20/2022
Issuing Office
Current Status
CofO Issued on 9/17/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/15/2022 APPLICANT
Assigned to Plan Check Engineer 3/16/2022 OMAR GARNICA
Corrections Issued 3/16/2022 OMAR GARNICA
Plan Check Approved 4/13/2022 OMAR GARNICA
Issued 4/20/2022 APPLICANT
Building Plans Picked Up 4/21/2022 APPLICANT
CofO in Progress 8/26/2024 HAMIK HARTOUNIAN
CofO Issued 9/17/2024 DEROLD HAUFF
Permit Finaled 9/17/2024 DEROLD HAUFF

Permit Application Clearance Information

Grading Pre-Inspection Cleared 3/31/2022 KIRK LINKLATER
Roof/Waste drainage to street Cleared 3/31/2022 CINDY QI
Eng Process Fee Ord 176,300 Cleared 4/5/2022 CINDY QI

Contact Information

Contractor Owner-Builder       ,
Engineer Keshishian,, Vahram; Lic. No.: S6482 1102 SAN RAFAEL AVE      GLENDALE, CA 91202

Inspector Information

HAMIK HARTOUNIAN, (213) 202-3275 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/4/2022 Approved STUART CHAPMAN
Deputy Drilled-In Anchors 8/15/2022 Conditional Approval THOMAS LOGRASSO
Footing/Foundation/Slab 8/19/2022 Corrections Issued THOMAS LOGRASSO
Excavation/Setback/Form/Re-Bar 8/24/2022 Partial Approval THOMAS LOGRASSO
Special/Order Compliance 8/24/2022 Corrections Issued THOMAS LOGRASSO
Service/Power Release 10/18/2022 Not Ready for Inspection THOMAS LOGRASSO
ELECTRICAL-Final 12/6/2022 Corrections Issued THOMAS LOGRASSO
Floor/Roof Diaphrgm/Shear Wall 12/6/2022 Approved THOMAS LOGRASSO
ELECTRICAL-Rough 12/22/2022 Approved THOMAS LOGRASSO
HVAC-Rough 12/22/2022 Not Ready for Inspection THOMAS LOGRASSO
PLUMBING-Rough 12/22/2022 Approved THOMAS LOGRASSO
BUILDING-Rough-Frame 12/27/2022 Partial Approval THOMAS LOGRASSO
Green Building Rough 12/27/2022 Not Ready for Inspection THOMAS LOGRASSO
HVAC-Rough 12/27/2022 Approved THOMAS LOGRASSO
ELECTRICAL-Final 12/29/2022 No Access for Inspection JOSE AVILA
HVAC-Final 12/29/2022 No Access for Inspection JOSE AVILA
BUILDING-Rough-Frame 2/8/2023 Approved THOMAS LOGRASSO
Green Building Rough 2/8/2023 Approved THOMAS LOGRASSO
Insulation 2/8/2023 Approved THOMAS LOGRASSO
Interior/Exterior Lathing 2/8/2023 Partial Approval THOMAS LOGRASSO
Drywall Nailing 3/7/2023 Conditional Approval HAMIK HARTOUNIAN
Shower Pan 3/20/2023 Approved THOMAS LOGRASSO
Interior/Exterior Lathing 3/23/2023 Partial Approval THOMAS LOGRASSO
Wood Frame 4/1/2024 Partial Inspection THOMAS LOGRASSO
Wood Frame 4/5/2024 Not Ready for Inspection THOMAS LOGRASSO
Masonry Wall/Backfill 4/19/2024 Partial Inspection SCOTT FINNILA
Wood Frame 4/19/2024 Conditional Approval SCOTT FINNILA
Pre-Inspection 5/1/2024 Partial Inspection FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 5/7/2024 SGSOV Approved BRENDAN MORELLI
Final 8/8/2024 Corrections Issued HAMIK HARTOUNIAN
Footing/Foundation/Slab 8/8/2024 Approved HAMIK HARTOUNIAN
Green Building Final 8/8/2024 Corrections Issued HAMIK HARTOUNIAN
Smoke Detectors 8/8/2024 Approved HAMIK HARTOUNIAN
Final 8/14/2024 OK to Issue CofO HAMIK HARTOUNIAN
Green Building Final 8/14/2024 Approved HAMIK HARTOUNIAN
HVAC-Final 8/14/2024 Approved HAMIK HARTOUNIAN