2006 S CRESCENT HEIGHTS BLVD 90034

Certificate Information: 2006 S CRESCENT HEIGHTS BLVD 90034

Application / Permit
22014-20000-00970
Plan Check / Job No.
B22VN03247
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
CONVERT 25'-11" X 14'-6" IRREG SHAPED ATTIC TO SECOND FLOOR BEDROOM AND BATHROOM PER ENGINEER. 4'-4" X 3'-10" ADDITION TO ENLARGE ENTRY. 4'-4" X 16'-11" COVERED PORCH ADDITION. 14' X 14'-4" ADDITION TO REAR OF SFD FOR NEW BATHROOM.
Permit Issued
Issued on 6/17/2022
Issuing Office
Current Status
Issued on 6/17/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 3/3/2022 APPLICANT
Assigned to Plan Check Engineer 3/11/2022 JEROME MAGAT PALMA
Corrections Issued 3/12/2022 JEROME MAGAT PALMA
Applicant returned to address corrections 4/11/2022 JEROME MAGAT PALMA
Plan Check Approved 5/30/2022 JEROME MAGAT PALMA
Building Plans Picked Up 6/9/2022 APPLICANT
Issued 6/17/2022 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 3/30/2022 CHRISTOPHER ROCHA
Sewer availability Cleared 3/30/2022 CHRISTOPHER ROCHA
Roof/Waste drainage to street Cleared 6/6/2022 ABEL CASILLAS

Contact Information

Contractor Owner-Builder       ,

Inspector Information

DAVID WILLIAMS, (213) 202-3126 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/5/2022 Approved JOSE AVILA
PLUMBING-Rough 7/12/2022 Approved JOSE AVILA
Wood Frame 7/12/2022 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 7/25/2022 Approved JOSE AVILA
HVAC-Rough 7/28/2022 Corrections Issued FREDDIE RIVERA
PLUMBING-Rough 7/28/2022 Approved FREDDIE RIVERA
Reinforced Concrete Frame 8/2/2022 Approved JOSE AVILA
BUILDING-Rough-Frame 8/4/2022 Corrections Issued JOSE AVILA
ELECTRICAL-Rough 8/4/2022 Corrections Issued JOSE AVILA
Green Building Rough 8/4/2022 Corrections Issued JOSE AVILA
HVAC-Rough 8/4/2022 Corrections Issued JOSE AVILA
BUILDING-Rough-Frame 8/10/2022 Approved JOSE AVILA
ELECTRICAL-Rough 8/10/2022 Approved JOSE AVILA
Green Building Rough 8/10/2022 Approved JOSE AVILA
HVAC-Rough 8/10/2022 Approved JOSE AVILA
Insulation 8/16/2022 Approved JOSE AVILA
Interior/Exterior Lathing 8/16/2022 Corrections Issued JOSE AVILA
Shower Pan 8/16/2022 Approved JOSE AVILA
Drywall Nailing 8/22/2022 Approved JOSE AVILA
Interior/Exterior Lathing 8/22/2022 Approved JOSE AVILA
Final 5/2/2023 Corrections Issued JOSE AVILA
Green Building Final 5/2/2023 Approved JOSE AVILA
SGSOV-Seismic Gas S/O Valve 5/2/2023 SGSOV Not Ready JOSE AVILA
Final 5/10/2023 Corrections Issued JOSE AVILA
SGSOV-Seismic Gas S/O Valve 5/10/2023 SGSOV Approved JOSE AVILA
Smoke Detectors 5/10/2023 Approved JOSE AVILA
Final 5/15/2023 Partial Approval JOSE AVILA