10732 W WELLWORTH AVE 90024

Certificate Information: 10732 W WELLWORTH AVE 90024

Application / Permit
22014-20000-00371
Plan Check / Job No.
B22VN01301
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMOVE THE (E) ATTACHED REAR FAMILY ROOM AND REBUILD A (N) CLOSET ADDITION OF 10'-9" x 16'-6" WITH ALL NEW FOOTING AND FRAMING. INTERIOR REMODEL TO THE (E) SFD. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 3/22/2022
Issuing Office
Current Status
CofO Issued on 4/10/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/28/2022 APPLICANT
Assigned to Plan Check Engineer 2/10/2022 LUISANGEL VALENZUELA
Corrections Issued 2/12/2022 LUISANGEL VALENZUELA
Applicant returned to address corrections 3/7/2022 LUISANGEL VALENZUELA
Issued 3/22/2022 APPLICANT
Building Plans Picked Up 3/24/2022 APPLICANT
CofO in Progress 4/5/2023 CLAYTON GRAHAM
Permit Finaled 4/10/2023 DANIEL ORRANTE
CofO Issued 4/10/2023 DANIEL ORRANTE
Permit Finaled 4/10/2023 DANIEL ORRANTE

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 2/22/2022 JENSON LEE
Roof/Waste drainage to street Cleared 3/11/2022 JENSON LEE
Grading Pre-Inspection Cleared 3/21/2022 LUISANGEL VALENZUELA

Contact Information

Contractor Molinar Design Inc; Lic. No.: 1024641-B 1132 SPENCE STREET      LOS ANGELES, CA 90023
Engineer Sarrami,, Gholamali F; Lic. No.: C43720 4942 HIGHLAND VIEW AVENUE      LOS ANGELES, CA 90041

Inspector Information

ANTHONY EGSON, (310) 914-3893 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 3/25/2022 Corrections Issued OGANES TARAKHCHYAN
METHANE-Barrier 3/25/2022 Approved OGANES TARAKHCHYAN
METHANE-Subgrade 3/25/2022 Approved OGANES TARAKHCHYAN
Footing/Foundation/Slab 4/5/2022 Corrections Issued OGANES TARAKHCHYAN
BUILDING-Rough-Frame 4/15/2022 Partial Approval OGANES TARAKHCHYAN
Footing/Foundation/Slab 4/15/2022 Approved OGANES TARAKHCHYAN
Green Building Rough 4/15/2022 Not Ready for Inspection OGANES TARAKHCHYAN
METHANE-Rough 4/15/2022 Not Ready for Inspection OGANES TARAKHCHYAN
Floor/Roof Diaphrgm/Shear Wall 4/27/2022 Partial Approval EVAN COOPER
Interior/Exterior Lathing 5/3/2022 Partial Approval OGANES TARAKHCHYAN
BUILDING-Rough-Frame 5/9/2022 Partial Approval OGANES TARAKHCHYAN
ELECTRICAL-Rough 5/9/2022 Corrections Issued OGANES TARAKHCHYAN
Green Building Rough 5/9/2022 Approved OGANES TARAKHCHYAN
HVAC-Rough 5/9/2022 Approved OGANES TARAKHCHYAN
METHANE-Rough 5/9/2022 Approved OGANES TARAKHCHYAN
PLUMBING-Rough 5/9/2022 Approved OGANES TARAKHCHYAN
ELECTRICAL-Rough 5/11/2022 Approved OGANES TARAKHCHYAN
BUILDING-Rough-Frame 5/13/2022 Approved OGANES TARAKHCHYAN
Insulation 5/13/2022 Approved OGANES TARAKHCHYAN
Drywall Nailing 5/17/2022 Approved OGANES TARAKHCHYAN
Shower Pan 6/1/2022 Approved OGANES TARAKHCHYAN
Interior/Exterior Lathing 6/9/2022 Approved MICHAEL PELHAM
Final 12/28/2022 Corrections Issued ASHLEY THOMPSON
Green Building Final 12/28/2022 Corrections Issued ASHLEY THOMPSON
SGSOV-Seismic Gas S/O Valve 12/28/2022 SGSOV Not Ready ASHLEY THOMPSON
Smoke Detectors 12/28/2022 Corrections Issued ASHLEY THOMPSON
ELECTRICAL-Final 4/4/2023 Approved CLAYTON GRAHAM
Final 4/4/2023 OK to Issue CofO CLAYTON GRAHAM
Green Building Final 4/4/2023 Approved CLAYTON GRAHAM
HVAC-Final 4/4/2023 Approved CLAYTON GRAHAM
PLUMBING-Final 4/4/2023 Approved CLAYTON GRAHAM
SGSOV-Seismic Gas S/O Valve 4/4/2023 SGSOV Approved CLAYTON GRAHAM
Smoke Detectors 4/4/2023 Approved CLAYTON GRAHAM