11263 W DONA LISA DR 91604

Certificate Information: 11263 W DONA LISA DR 91604

Application / Permit
22014-10000-06295
Plan Check / Job No.
B22LA26272
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ePlan Addition to existing single-family dwelling. 1 of 3
Permit Issued
Issued on 3/5/2024
Issuing Office
Current Status
Issued on 3/5/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/26/2022 APPLICANT
Assigned to Plan Check Engineer 2/2/2023 ADRIANA LOPEZ
Corrections Issued 3/13/2023 ADRIANA LOPEZ
Quality Review Completed 3/29/2023 FARUK SEZER
Applicant returned to address corrections 8/21/2023 ADRIANA LOPEZ
Applicant returned to address corrections 11/15/2023 ADRIANA LOPEZ
Applicant returned to address corrections 12/18/2023 ADRIANA LOPEZ
Plan Check Approved 3/5/2024 ADRIANA LOPEZ
Issued 3/5/2024 APPLICANT

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 4/11/2023 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 4/17/2023 LEE GUILBEAUX
Grading Pre-Inspection Cleared 11/15/2023 ADRIANA LOPEZ
ZI Cleared 11/20/2023 JUDE HERNANDEZ
ZI Cleared 11/20/2023 JUDE HERNANDEZ
Excavation more than 5-ft deep Cleared 3/5/2024 CALOSHA APPROVED

Contact Information

Architect Heath,, Steven T; Lic. No.: C26474 12435 WASHINGTON PL.      LOS ANGELES, CA 90066
Contractor Owner-Builder       ,
Engineer Kazarians,, Ardashes; Lic. No.: C36687 1528 CANADA BLVD STE 206      GLENDALE, CA 91208
Engineer Tsai,, Steve Shi-Shen; Lic. No.: GE2268 1545 VICTORY BLVD      GLENDALE, CA 91201
Geologist Termeer,, Benjamin Ryan; Lic. No.: EG2687 1545 VICTORY BLVD 2ND FL      GLENDALE, CA 91201

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/24/2025 Conditional Approval RAUL OLAGI
Excavation/Setback/Form/Re-Bar 4/1/2025 Not Ready for Inspection CHRISTOPHE COCHRAN
Footing/Foundation/Slab 4/1/2025 Corrections Issued CHRISTOPHE COCHRAN
Excavation/Setback/Form/Re-Bar 4/9/2025 Corrections Issued KEVIN BERBERYAN
Footing/Foundation/Slab 4/9/2025 Not Ready for Inspection KEVIN BERBERYAN
BUILDING-Rough-Frame 4/17/2025 Partial Approval CHRISTOPHE COCHRAN
Floor/Roof Diaphrgm/Shear Wall 4/18/2025 Partial Approval CHRISTOPHE COCHRAN
Deputy Drilled-In Anchors 4/25/2025 Conditional Approval RAUL OLAGI
BUILDING-Rough-Frame 4/29/2025 Partial Approval CHRISTOPHE COCHRAN
Floor/Roof Diaphrgm/Shear Wall 4/29/2025 Approved CHRISTOPHE COCHRAN
Green Building Rough 4/29/2025 Not Ready for Inspection CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 5/29/2025 Approved CHRISTOPHE COCHRAN
ELECTRICAL-Rough 5/29/2025 Approved CHRISTOPHE COCHRAN
Green Building Rough 5/29/2025 Approved CHRISTOPHE COCHRAN
HVAC-Rough 5/29/2025 Approved CHRISTOPHE COCHRAN
Interior/Exterior Lathing 5/29/2025 Partial Approval CHRISTOPHE COCHRAN
PLUMBING-Rough 5/29/2025 Approved CHRISTOPHE COCHRAN
Insulation 6/10/2025 Approved CHRISTOPHE COCHRAN
Drywall Nailing 6/23/2025 Approved CHRISTOPHE COCHRAN
Interior/Exterior Lathing 6/23/2025 Not Ready for Inspection CHRISTOPHE COCHRAN
Shower Pan 6/23/2025 Not Ready for Inspection CHRISTOPHE COCHRAN
Pre-Inspection 7/20/2026 Corrections Issued CHRISTOPHE COCHRAN