2144 W RIDGEVIEW AVE 90041

Certificate Information: 2144 W RIDGEVIEW AVE 90041

Application / Permit
22014-10000-05545
Plan Check / Job No.
B22LA22770
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
ePLAN- Existing detached garage to be converted into ADU with 16'2" x 39'6" addition at the rear. The LID clearance has been deferred. Approval for LID requirements shall be obtained from LASAN prior to the finaling of the permit.
Permit Issued
Issued on 6/29/2023
Issuing Office
Current Status
CofO Issued on 7/9/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/13/2022 APPLICANT
Assigned to Plan Check Engineer 12/8/2022 NGHI SU
Corrections Issued 12/13/2022 NGHI SU
Quality Review Completed 12/15/2022 GARO TELMI
Applicant returned to address corrections 3/21/2023 NGHI SU
Plan Check Approved 5/18/2023 NGHI SU
Issued 6/29/2023 APPLICANT
CofO in Progress 7/8/2024 ALIZAH MAYAGOITIA
CofO Issued 7/9/2024 DEROLD HAUFF
Permit Finaled 7/9/2024 DEROLD HAUFF

Permit Application Clearance Information

GPI Written Notices Cleared 12/13/2022 NGHI SU
Address approval Cleared 1/25/2023 ABEL CASILLAS
Eng Process Fee Ord 176,300 Cleared 1/25/2023 ABEL CASILLAS
Roof/Waste drainage to street Cleared 1/25/2023 ABEL CASILLAS
Sewer availability Cleared 1/25/2023 ABEL CASILLAS
Construction near power lines Cleared 4/15/2023 RIDWAN HARDY
Tenant Habitability Plan Cleared 4/18/2023 ISMAEL HERNANDEZ
Grading Pre-Inspection Cleared 4/24/2023 NGHI SU

Contact Information

Contractor Lopez Nelson Gacula; Lic. No.: 913712-B       ,
Engineer Chiu,, Ivan Wai-Kuen; Lic. No.: L6762 2160 PARNELL WY      ALTADENA, CA 91001
Engineer Phillips,, Craig; Lic. No.: C69673 2123 VESTAL AVE      LOS ANGELES, CA 90026

Inspector Information

RONNIE MEDINA, (213) 469-5852 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 7/31/2023 Conditional Approval CRAIG VAUGHAN
Excavation/Setback/Form/Re-Bar 8/7/2023 Partial Approval CRAIG VAUGHAN
Pre-Inspection 8/7/2023 Approved CRAIG VAUGHAN
BUILDING-Rough-Frame 8/18/2023 Partial Approval CRAIG VAUGHAN
Footing/Foundation/Slab 8/18/2023 Approved CRAIG VAUGHAN
Green Building Rough 8/18/2023 Not Ready for Inspection CRAIG VAUGHAN
PLUMBING-Rough 8/18/2023 Partial Approval CRAIG VAUGHAN
Floor/Roof Diaphrgm/Shear Wall 10/30/2023 No Access for Inspection CRAIG VAUGHAN
Floor/Roof Diaphrgm/Shear Wall 11/1/2023 Approved ROY SPAULDING
BUILDING-Rough-Frame 11/28/2023 Not Ready for Inspection HAMIK HARTOUNIAN
ELECTRICAL-Rough 11/28/2023 Not Ready for Inspection HAMIK HARTOUNIAN
Green Building Rough 11/28/2023 Corrections Issued HAMIK HARTOUNIAN
HVAC-Rough 11/28/2023 Not Ready for Inspection HAMIK HARTOUNIAN
PLUMBING-Rough 11/28/2023 Approved HAMIK HARTOUNIAN
ELECTRICAL-Rough 12/1/2023 Approved CRAIG VAUGHAN
BUILDING-Rough-Frame 1/2/2024 Approved CRAIG VAUGHAN
Green Building Rough 1/2/2024 Approved CRAIG VAUGHAN
HVAC-Rough 1/2/2024 Approved CRAIG VAUGHAN
Interior/Exterior Lathing 1/9/2024 Partial Approval CRAIG VAUGHAN
Insulation 1/10/2024 Approved CRAIG VAUGHAN
Drywall Nailing 1/19/2024 Approved CHARLES BOGHOSKHAN
Sewer 2/9/2024 No Access for Inspection CRAIG VAUGHAN
Sewer 2/14/2024 Approved CRAIG VAUGHAN
Underground Mechanical 2/14/2024 Partial Approval CRAIG VAUGHAN
Final 6/25/2024 Corrections Issued BRIAN SULLIVAN
Green Building Final 6/25/2024 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 6/25/2024 SGSOV Not Ready BRIAN SULLIVAN
Smoke Detectors 6/25/2024 Approved BRIAN SULLIVAN
Final 7/5/2024 Conditional Approval ALIZAH MAYAGOITIA
SGSOV-Seismic Gas S/O Valve 7/5/2024 SGSOV Approved ALIZAH MAYAGOITIA
Final 7/8/2024 OK to Issue CofO ALIZAH MAYAGOITIA