726 S HIGHLAND AVE 90036

Certificate Information: 726 S HIGHLAND AVE 90036

Application / Permit
22014-10000-05405
Plan Check / Job No.
B22LA22161
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(7) Garage - Private
Work Description
2'-7" X 18' & 3' X 18' ADDITION TO (E) DETACHED GARAGE TO ENLARGE GARAGE & 8'-7" X 14'-5"ADDITION TO (E) DETACHED GARAGE CREATING (N) STORAGE ROOM. (N) 8'-4" X 9'-2" TRELLIS
Permit Issued
Issued on 2/17/2023
Issuing Office
Current Status
CofO Issued on 3/8/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/28/2022 APPLICANT
Assigned to Plan Check Engineer 12/1/2022 ALEC MOUSAKHANIAN
Corrections Issued 12/2/2022 ALEC MOUSAKHANIAN
Applicant returned to address corrections 2/3/2023 ALEC MOUSAKHANIAN
Plan Check Approved 2/15/2023 OMAR GARNICA
Issued 2/17/2023 APPLICANT
CofO in Progress 3/4/2024 RICHARD DOCKUS
Permit Finaled 3/8/2024 DEROLD HAUFF
CofO Issued 3/8/2024 DEROLD HAUFF
Permit Finaled 3/8/2024 DEROLD HAUFF

Permit Application Clearance Information

Specific Plan Cleared 1/12/2023 MAIRA SANCHEZ
Low Impact Development Cleared 1/31/2023 DEBORA LEITE
Eng Process Fee Ord 176,300 Cleared 2/1/2023 ADRIAN SANCHEZ
Roof/Waste drainage to street Cleared 2/1/2023 ADRIAN SANCHEZ

Contact Information

Architect Ryder,, Derek Thomas; Lic. No.: C32847 4111 GLENALBYN DRIVE      LOS ANGELES, CA 90065
Contractor Home Front Build Inc; Lic. No.: 962293-B 715 CYPRESS AVE      LOS ANGELES, CA 90065
Engineer Phillips,, Craig; Lic. No.: C69673 2123 VESTAL AVE      LOS ANGELES, CA 90026

Inspector Information

RONNIE MINDANAO, (213) 202-3252 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 4/25/2023 Partial Approval RICHARD DOCKUS
Footing/Foundation/Slab 5/22/2023 Corrections Issued RICHARD DOCKUS
METHANE-Barrier 5/22/2023 Approved RICHARD DOCKUS
METHANE-Subgrade 5/22/2023 Approved RICHARD DOCKUS
Footing/Foundation/Slab 5/26/2023 Corrections Issued RICHARD DOCKUS
Footing/Foundation/Slab 6/5/2023 Not Ready for Inspection RICHARD DOCKUS
Footing/Foundation/Slab 6/14/2023 Not Ready for Inspection RICHARD DOCKUS
Footing/Foundation/Slab 6/23/2023 Partial Approval RICHARD DOCKUS
Structural Steel Frame 7/28/2023 Corrections Issued SCOTT FINNILA
Wood Frame 7/28/2023 Partial Approval SCOTT FINNILA
Floor/Roof Diaphrgm/Shear Wall 9/14/2023 Partial Approval RICHARD DOCKUS
ELECTRICAL-Rough 9/29/2023 Approved RICHARD DOCKUS
Structural Steel Frame 9/29/2023 Approved RICHARD DOCKUS
Wood Frame 9/29/2023 Approved RICHARD DOCKUS
Interior/Exterior Lathing 10/17/2023 Partial Approval RICHARD DOCKUS
BUILDING-Rough-Frame 12/6/2023 Approved RICHARD DOCKUS
Final 12/6/2023 Not Ready for Inspection RICHARD DOCKUS
Footing/Foundation/Slab 12/6/2023 Approved RICHARD DOCKUS
Green Building Final 12/6/2023 Approved RICHARD DOCKUS
Green Building Rough 12/6/2023 Approved RICHARD DOCKUS
METHANE-Final 12/6/2023 Approved RICHARD DOCKUS
METHANE-Rough 12/6/2023 Approved RICHARD DOCKUS
SGSOV-Seismic Gas S/O Valve 12/6/2023 SGSOV Approved RICHARD DOCKUS
Smoke Detectors 12/6/2023 No Access for Inspection RICHARD DOCKUS
Drywall Nailing 12/18/2023 Approved LILIANA PORTILLO
Insulation 12/18/2023 Approved LILIANA PORTILLO
Final 1/24/2024 Corrections Issued RICHARD DOCKUS
Final 2/7/2024 Partial Inspection AMIR NAZARIAN
Smoke Detectors 2/7/2024 Approved AMIR NAZARIAN
Final 2/21/2024 Conditional Approval RICHARD DOCKUS
Final 2/28/2024 OK to Issue CofO RICHARD DOCKUS