3827 N SHERVIEW DR 91403

Certificate Information: 3827 N SHERVIEW DR 91403

Application / Permit
22014-10000-04512
Plan Check / Job No.
B22LA18137
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
full house remodel with NO ADDITION 1- REPLACE ALL WINDOOS AND DOOR. ( NOT AFFECTE ANY SHEAR WALL) 2- WIDEN THE GARAGE DOOR FROM 16' TO 18' ( SW DECREASE BY 4% NO NEED TO RECALCS. THE NEW LATERAL CAPACITY IS SMALLER TAHN 10% THEN THE REDUCED SW SHALL BE PERMITTED PER LAEBC 503.4 EXEMPTION # 1) 3- DEMO. CURTAIN WALL (NON BEARING NON SHEAR) AT LINE D-D BETWEEN LINE 4, AND 3 4- MOVE THE KITCHEN , AND REMODEL 5- CONVERT AREA OF EXISTING KITCHEN TO AN OFFICE, AND GYM 7-CONVERT EPART OF EXISTING SPA TO LAUDRY AND POWDER 8- REMOVE POSTS IN LINE 3-3 AND CHANGE THE BEARING D=SYSTEM FOR THE RIDGE BOARD 9- CHANGE ALL THE INTERIOR DOOR TO SIZE 32" 10- CHANGE THE EXISTING ENTRANCE DOOR / SAME SIZE.
Permit Issued
Issued on 10/3/2022
Issuing Office
Current Status
Permit Finaled on 5/6/2024

Permit Application Status History

Submitted 9/12/2022 APPLICANT
Assigned to Plan Check Engineer 9/16/2022 ZAW HAN
Corrections Issued 9/18/2022 ZAW HAN
Plan Check Approved 10/3/2022 ZAW HAN
Issued 10/3/2022 APPLICANT
Permit Finaled 5/3/2024 THOMAS FINNILA

Permit Application Clearance Information

Grading Pre-Inspection Cleared 9/22/2022 KIRK LINKLATER

Contact Information

Contractor Owner-Builder       ,
Engineer Boules,, George Helmy; Lic. No.: NA64144       ,

Inspector Information

RAUL OLAGI, (818) 374-1166 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/15/2023 Corrections Issued THOMAS FINNILA
Footing/Foundation/Slab 2/24/2023 Partial Approval THOMAS FINNILA
ELECTRICAL-Rough 6/8/2023 Not Ready for Inspection THOMAS FINNILA
PLUMBING-Rough 6/8/2023 Not Ready for Inspection THOMAS FINNILA
ELECTRICAL-Rough 6/15/2023 Corrections Issued THOMAS FINNILA
PLUMBING-Rough 6/15/2023 Approved THOMAS FINNILA
ELECTRICAL-Rough 6/28/2023 Approved THOMAS FINNILA
HVAC-Rough 6/28/2023 Approved THOMAS FINNILA
BUILDING-Rough-Frame 6/30/2023 Corrections Issued THOMAS FINNILA
Wood Frame 6/30/2023 Not Ready for Inspection THOMAS FINNILA
Wood Frame 7/11/2023 Approved THOMAS FINNILA
BUILDING-Rough-Frame 7/14/2023 Not Ready for Inspection THOMAS FINNILA
Insulation 7/24/2023 Not Ready for Inspection THOMAS FINNILA
Interior/Exterior Lathing 7/24/2023 Partial Approval THOMAS FINNILA
Shower Pan 7/24/2023 Approved THOMAS FINNILA
Insulation 7/31/2023 Approved THOMAS FINNILA
Interior/Exterior Lathing 7/31/2023 Not Ready for Inspection THOMAS FINNILA
Drywall Nailing 8/7/2023 Approved THOMAS FINNILA
Interior/Exterior Lathing 8/7/2023 Not Ready for Inspection THOMAS FINNILA
Interior/Exterior Lathing 8/28/2023 Partial Approval THOMAS FINNILA
ELECTRICAL-Final 3/4/2024 Not Ready for Inspection THOMAS FINNILA
Final 3/4/2024 Not Ready for Inspection THOMAS FINNILA
HVAC-Final 3/4/2024 Corrections Issued THOMAS FINNILA
PLUMBING-Final 3/4/2024 Not Ready for Inspection THOMAS FINNILA
SGSOV-Seismic Gas S/O Valve 3/4/2024 SGSOV Not Ready THOMAS FINNILA
Smoke Detectors 3/4/2024 Approved THOMAS FINNILA
ELECTRICAL-Final 4/19/2024 Corrections Issued THOMAS FINNILA
Final 4/19/2024 Corrections Issued THOMAS FINNILA
HVAC-Final 4/19/2024 Corrections Issued THOMAS FINNILA
PLUMBING-Final 4/19/2024 Approved THOMAS FINNILA
SGSOV-Seismic Gas S/O Valve 4/19/2024 SGSOV Not Ready THOMAS FINNILA
ELECTRICAL-Final 5/3/2024 Approved THOMAS FINNILA
Final 5/3/2024 Permit Finaled THOMAS FINNILA
HVAC-Final 5/3/2024 Approved THOMAS FINNILA
SGSOV-Seismic Gas S/O Valve 5/3/2024 SGSOV Approved THOMAS FINNILA