3827 N SHERVIEW DR 91403
Certificate Information: 3827 N SHERVIEW DR 91403
- Application / Permit
- 22014-10000-04512
- Plan Check / Job No.
- B22LA18137
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- full house remodel with NO ADDITION 1- REPLACE ALL WINDOOS AND DOOR. ( NOT AFFECTE ANY SHEAR WALL) 2- WIDEN THE GARAGE DOOR FROM 16' TO 18' ( SW DECREASE BY 4% NO NEED TO RECALCS. THE NEW LATERAL CAPACITY IS SMALLER TAHN 10% THEN THE REDUCED SW SHALL BE PERMITTED PER LAEBC 503.4 EXEMPTION # 1) 3- DEMO. CURTAIN WALL (NON BEARING NON SHEAR) AT LINE D-D BETWEEN LINE 4, AND 3 4- MOVE THE KITCHEN , AND REMODEL 5- CONVERT AREA OF EXISTING KITCHEN TO AN OFFICE, AND GYM 7-CONVERT EPART OF EXISTING SPA TO LAUDRY AND POWDER 8- REMOVE POSTS IN LINE 3-3 AND CHANGE THE BEARING D=SYSTEM FOR THE RIDGE BOARD 9- CHANGE ALL THE INTERIOR DOOR TO SIZE 32" 10- CHANGE THE EXISTING ENTRANCE DOOR / SAME SIZE.
- Permit Issued
- Issued on 10/3/2022
- Issuing Office
- Current Status
- Permit Finaled on 5/6/2024
Permit Application Status History
| Submitted | 9/12/2022 | APPLICANT |
| Assigned to Plan Check Engineer | 9/16/2022 | ZAW HAN |
| Corrections Issued | 9/18/2022 | ZAW HAN |
| Plan Check Approved | 10/3/2022 | ZAW HAN |
| Issued | 10/3/2022 | APPLICANT |
| Permit Finaled | 5/3/2024 | THOMAS FINNILA |
Permit Application Clearance Information
| Grading Pre-Inspection | Cleared | 9/22/2022 | KIRK LINKLATER |
Contact Information
| Contractor | Owner-Builder | , |
| Engineer | Boules,, George Helmy; Lic. No.: NA64144 | , |
Inspector Information
| RAUL OLAGI, (818) 374-1166 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Footing/Foundation/Slab | 2/15/2023 | Corrections Issued | THOMAS FINNILA |
| Footing/Foundation/Slab | 2/24/2023 | Partial Approval | THOMAS FINNILA |
| ELECTRICAL-Rough | 6/8/2023 | Not Ready for Inspection | THOMAS FINNILA |
| PLUMBING-Rough | 6/8/2023 | Not Ready for Inspection | THOMAS FINNILA |
| ELECTRICAL-Rough | 6/15/2023 | Corrections Issued | THOMAS FINNILA |
| PLUMBING-Rough | 6/15/2023 | Approved | THOMAS FINNILA |
| ELECTRICAL-Rough | 6/28/2023 | Approved | THOMAS FINNILA |
| HVAC-Rough | 6/28/2023 | Approved | THOMAS FINNILA |
| BUILDING-Rough-Frame | 6/30/2023 | Corrections Issued | THOMAS FINNILA |
| Wood Frame | 6/30/2023 | Not Ready for Inspection | THOMAS FINNILA |
| Wood Frame | 7/11/2023 | Approved | THOMAS FINNILA |
| BUILDING-Rough-Frame | 7/14/2023 | Not Ready for Inspection | THOMAS FINNILA |
| Insulation | 7/24/2023 | Not Ready for Inspection | THOMAS FINNILA |
| Interior/Exterior Lathing | 7/24/2023 | Partial Approval | THOMAS FINNILA |
| Shower Pan | 7/24/2023 | Approved | THOMAS FINNILA |
| Insulation | 7/31/2023 | Approved | THOMAS FINNILA |
| Interior/Exterior Lathing | 7/31/2023 | Not Ready for Inspection | THOMAS FINNILA |
| Drywall Nailing | 8/7/2023 | Approved | THOMAS FINNILA |
| Interior/Exterior Lathing | 8/7/2023 | Not Ready for Inspection | THOMAS FINNILA |
| Interior/Exterior Lathing | 8/28/2023 | Partial Approval | THOMAS FINNILA |
| ELECTRICAL-Final | 3/4/2024 | Not Ready for Inspection | THOMAS FINNILA |
| Final | 3/4/2024 | Not Ready for Inspection | THOMAS FINNILA |
| HVAC-Final | 3/4/2024 | Corrections Issued | THOMAS FINNILA |
| PLUMBING-Final | 3/4/2024 | Not Ready for Inspection | THOMAS FINNILA |
| SGSOV-Seismic Gas S/O Valve | 3/4/2024 | SGSOV Not Ready | THOMAS FINNILA |
| Smoke Detectors | 3/4/2024 | Approved | THOMAS FINNILA |
| ELECTRICAL-Final | 4/19/2024 | Corrections Issued | THOMAS FINNILA |
| Final | 4/19/2024 | Corrections Issued | THOMAS FINNILA |
| HVAC-Final | 4/19/2024 | Corrections Issued | THOMAS FINNILA |
| PLUMBING-Final | 4/19/2024 | Approved | THOMAS FINNILA |
| SGSOV-Seismic Gas S/O Valve | 4/19/2024 | SGSOV Not Ready | THOMAS FINNILA |
| ELECTRICAL-Final | 5/3/2024 | Approved | THOMAS FINNILA |
| Final | 5/3/2024 | Permit Finaled | THOMAS FINNILA |
| HVAC-Final | 5/3/2024 | Approved | THOMAS FINNILA |
| SGSOV-Seismic Gas S/O Valve | 5/3/2024 | SGSOV Approved | THOMAS FINNILA |