1934 N DEL PASO AVE 90032
Certificate Information: 1934 N DEL PASO AVE 90032
- Application / Permit
- 22014-10000-04359
- Plan Check / Job No.
- B22LA17390
- Group
- Building
- Type
- Bldg-Addition
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- *EPLAN*- basement and ground floor addition of (e) 1-story SFD ENCLOSE (E) DECK AT SECOND FLOOR FOR (N) MASTER BATHROOM ENCLOSE (E) ROOF OVERHANG AT ENTRY FOR (N) ENTRY (N) CLOSET ADDITION AT SECOND FLOOR BEDROOM AND (N) ATTIC OVER (N) POWDER ROOM INTERIOR REMODEL OF KITCHEN, DINING, LIVING ROOM, LAUNDRY, MASTER SUITE AND BEDROOM UPGRADE TO 200 AMP ELECTRICAL PANEL (N) TANKLESS WATER HEATER (N) FAU IN MECH. CLOSET (N) AC ON CONC. PAD REPLACE (E) ROOF W/ CLASS A COOL ROOF ASPHALT SHINGLE ROOF
- Permit Issued
- Issued on 4/8/2023
- Issuing Office
- Current Status
- Issued on 4/8/2023
- Certificate of Occupancy
- Pending More Information
Permit Application Status History
| Submitted | 8/30/2022 | APPLICANT |
| Assigned to Plan Check Engineer | 9/15/2022 | KELVIN CHUONG |
| Corrections Issued | 9/22/2022 | KELVIN CHUONG |
| Quality Review Completed | 9/30/2022 | RODOLFO ARIAS |
| Applicant returned to address corrections | 12/15/2022 | KELVIN CHUONG |
| Applicant returned to address corrections | 3/10/2023 | KELVIN CHUONG |
| Applicant returned to address corrections | 3/22/2023 | KELVIN CHUONG |
| Plan Check Approved | 3/24/2023 | KELVIN CHUONG |
| Issued | 4/8/2023 | APPLICANT |
Permit Application Clearance Information
| Miscellaneous | Cleared | 11/10/2022 | ANACANY HURTADO |
| Miscellaneous | Cleared | 11/10/2022 | ANACANY HURTADO |
| Miscellaneous | Cleared | 11/10/2022 | ANACANY HURTADO |
| ZI | Cleared | 11/10/2022 | ANACANY HURTADO |
| Private street | Cleared | 11/15/2022 | DANIEL CORONADO |
| Private street | Cleared | 11/15/2022 | DANIEL CORONADO |
| BHO/Hillside ordinance | Cleared | 12/5/2022 | STEVE MELGAR |
| BHO/Hillside ordinance | Cleared | 12/5/2022 | STEVE MELGAR |
| BHO/Hillside ordinance | Cleared | 12/5/2022 | STEVE MELGAR |
| BHO/Hillside ordinance | Cleared | 12/5/2022 | STEVE MELGAR |
| Sewer availability | Cleared | 12/5/2022 | STEVE MELGAR |
| Excavation more than 5-ft deep | Cleared | 12/6/2022 | CALOSHA APPROVED |
| Low Impact Development | Cleared | 12/6/2022 | SARAH YOUSSEF |
| "D" conditions | Cleared | 12/12/2022 | DANIEL CORONADO |
| "Q" conditions | Cleared | 12/12/2022 | DANIEL CORONADO |
| Hydrant and Access approval | Cleared | 12/12/2022 | MATTHEW CRAIG |
| ZI | Cleared | 12/12/2022 | DANIEL CORONADO |
| Grading Pre-Inspection | Cleared | 12/13/2022 | KELVIN CHUONG |
| BHO/Hillside ordinance | Cleared | 12/22/2022 | TREVOR QUAN |
| Roof/Waste drainage to street | Cleared | 12/22/2022 | TREVOR QUAN |
| Eng Process Fee Ord 176,300 | Cleared | 12/27/2022 | JEANETTE VONG |
| GPI Written Notices | Cleared | 1/18/2023 | KELVIN CHUONG |
| Construction near power lines | Cleared | 2/22/2023 | RIDWAN HARDY |
| Zoning Information File | Cleared | 3/22/2023 | KELVIN CHUONG |
Contact Information
| Contractor | Owner-Builder | , |
| Engineer | Almalla,, Dean; Lic. No.: C58024 | 15053 VENTURA BLVD STE 205 SHERMAN OAKS, CA 91403 |
| Engineer | Liu,, Haiyan Harry; Lic. No.: C81463 | 10855 BECKFORD AVE NORTHRIDGE, CA 91326 |
| Geologist | Swiatek,, Mark A; Lic. No.: EG1781 | 24203 VALLEY ST NEWHALL, CA 91321 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Footing/Foundation/Slab | 9/11/2023 | Corrections Issued | AMY COLIN |
| Piling/Pier/Caisson | 9/11/2023 | Not Ready for Inspection | AMY COLIN |
| PLUMBING-Rough | 9/22/2023 | Partial Approval | ROY SPAULDING |
| Excavation/Setback/Form/Re-Bar | 9/26/2023 | Not Ready for Inspection | AMY COLIN |
| Footing/Foundation/Slab | 9/26/2023 | Not Ready for Inspection | AMY COLIN |
| Excavation/Setback/Form/Re-Bar | 9/28/2023 | Approved | AMY COLIN |
| Footing/Foundation/Slab | 10/6/2023 | Conditional Approval | SCOTT FINNILA |
| Floor/Roof Diaphrgm/Shear Wall | 12/14/2023 | Partial Approval | AMY COLIN |
| Footing/Foundation/Slab | 12/14/2023 | Approved | AMY COLIN |
| BUILDING-Rough-Frame | 2/28/2024 | Corrections Issued | CRAIG VAUGHAN |
| ELECTRICAL-Rough | 2/28/2024 | Corrections Issued | CRAIG VAUGHAN |
| Gas Test | 2/28/2024 | Approved | CRAIG VAUGHAN |
| HVAC-Rough | 2/28/2024 | Corrections Issued | CRAIG VAUGHAN |
| Interior/Exterior Lathing | 2/28/2024 | Partial Approval | CRAIG VAUGHAN |
| PLUMBING-Rough | 2/28/2024 | Corrections Issued | CRAIG VAUGHAN |
| Rough-Elec/Plmb/HVAC | 2/28/2024 | Not Ready for Inspection | CRAIG VAUGHAN |
| Shower Pan | 2/28/2024 | Approved | CRAIG VAUGHAN |
| BUILDING-Rough-Frame | 3/7/2024 | Corrections Issued | LILIANA PORTILLO |
| ELECTRICAL-Rough | 3/7/2024 | Approved | LILIANA PORTILLO |
| Gas Test | 3/7/2024 | Approved | LILIANA PORTILLO |
| HVAC-Rough | 3/7/2024 | Approved | LILIANA PORTILLO |
| PLUMBING-Rough | 3/7/2024 | Approved | LILIANA PORTILLO |
| Insulation | 3/12/2024 | Approved | LILIANA PORTILLO |
| Drywall Nailing | 3/22/2024 | Conditional Approval | LILIANA PORTILLO |
| Green Building Rough | 3/22/2024 | Approved | LILIANA PORTILLO |
| Gas Test | 4/4/2024 | Approved | ALIZAH MAYAGOITIA |
| Interior/Exterior Lathing | 4/4/2024 | Approved | ALIZAH MAYAGOITIA |
| Interior/Exterior Lathing | 4/5/2024 | No Access for Inspection | JOSEPH MCGARRY |
| ELECTRICAL-Final | 6/24/2024 | Corrections Issued | LILIANA PORTILLO |
| BUILDING-Rough-Frame | 11/1/2024 | Approved | LILIANA PORTILLO |
| Drywall Nailing | 11/1/2024 | Approved | LILIANA PORTILLO |
| Final | 11/1/2024 | Corrections Issued | LILIANA PORTILLO |
| Green Building Final | 11/1/2024 | Approved | LILIANA PORTILLO |
| SGSOV-Seismic Gas S/O Valve | 11/1/2024 | SGSOV Not Ready | LILIANA PORTILLO |
| Smoke Detectors | 11/1/2024 | Approved | LILIANA PORTILLO |
| Final | 11/26/2024 | Not Ready for Inspection | JOHN QUINTANILLA |
| SGSOV-Seismic Gas S/O Valve | 11/26/2024 | SGSOV Not Ready | JOHN QUINTANILLA |
| Final | 12/3/2024 | Not Ready for Inspection | LILIANA PORTILLO |
| SGSOV-Seismic Gas S/O Valve | 12/3/2024 | SGSOV Not Ready | LILIANA PORTILLO |
| Final | 12/12/2024 | Corrections Issued | LILIANA PORTILLO |
| SGSOV-Seismic Gas S/O Valve | 12/12/2024 | SGSOV Approved | LILIANA PORTILLO |