961 N BLUEGRASS WAY 90049

Certificate Information: 961 N BLUEGRASS WAY 90049

Application / Permit
22014-10000-04244
Plan Check / Job No.
B22LA16877
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
RESIDENTIAL REMODEL AND ADDITION, REROOFING, NEW GLAZING, STRUCTURAL RETROFIT. NEW STORAGE ADDITION IN (E) CRAWLSPACE AREA.
Permit Issued
Issued on 5/8/2023
Issuing Office
Current Status
CofO Issued on 6/25/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/23/2022 APPLICANT
Assigned to Plan Check Engineer 9/8/2022 ADRIANA LOPEZ
Corrections Issued 10/31/2022 ADRIANA LOPEZ
Quality Review Completed 11/10/2022 KEN GILL
Building Plans Picked Up 11/16/2022 APPLICANT
Applicant returned to address corrections 2/17/2023 ADRIANA LOPEZ
Applicant returned to address corrections 3/23/2023 ADRIANA LOPEZ
Plan Check Approved 4/6/2023 ADRIANA LOPEZ
Issued 5/8/2023 APPLICANT
CofO in Progress 6/23/2026 KEVIN SARGSYAN
Permit Finaled 6/25/2026 RICHARD STEINBACH
CofO Issued 6/25/2026 RICHARD STEINBACH
Permit Finaled 6/25/2026 RICHARD STEINBACH

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 11/23/2022 CATHERINE ADROVER
Hydrant and Access approval Cleared 12/13/2022 MATTHEW CRAIG
Low Impact Development Cleared 1/18/2023 DEBORA LEITE
Roof/Waste drainage to street Cleared 2/13/2023 CATHERINE ADROVER
GPI Written Notices Cleared 2/17/2023 ADRIANA LOPEZ
Grading Pre-Inspection Cleared 2/17/2023 ADRIANA LOPEZ
Excavation more than 5-ft deep Cleared 4/6/2023 CALOSHA APPROVED

Contact Information

Architect Luescher,, Andri; Lic. No.: C39273 1120 ECHO PARK AVE   #3    LOS ANGELES, CA 90026
Contractor Bonomo Development; Lic. No.: 669677-B 1523 LINDA COURT      SIMI VALLEY, CA 93065
Engineer Garza,, Omar Leonel; Lic. No.: S5593 600 WILSHIRE BLVD 760      LOS ANGELES, CA 90017

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/2/2023 Partial Inspection KEVIN SARGSYAN
Footing/Foundation/Slab 7/6/2023 Partial Approval KEVIN SARGSYAN
Deputy Reinf. Concrete 7/7/2023 Conditional Approval KEVIN SARGSYAN
Deputy Reinf. Concrete 7/10/2023 Conditional Approval KEVIN SARGSYAN
Footing/Foundation/Slab 7/14/2023 Partial Approval KEVIN SARGSYAN
Footing/Foundation/Slab 7/27/2023 Partial Approval KEVIN SARGSYAN
Deputy Reinf. Concrete 7/31/2023 Conditional Approval KEVIN SARGSYAN
Footing/Foundation/Slab 8/10/2023 Partial Approval KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 8/14/2023 Partial Approval ARAM AVEDISIAN
Deputy Reinf. Concrete 8/16/2023 Conditional Approval ARAM AVEDISIAN
Footing/Foundation/Slab 8/22/2023 Partial Approval KEVIN SARGSYAN
Footing/Foundation/Slab 8/28/2023 Partial Approval ARAM AVEDISIAN
Footing/Foundation/Slab 8/31/2023 Corrections Issued ARAM AVEDISIAN
PLUMBING-Rough 9/20/2023 Partial Approval KENNETH NAGLE
Deputy Drilled-In Anchors 10/6/2023 Conditional Approval ARAM AVEDISIAN
Floor/Roof Diaphrgm/Shear Wall 10/10/2023 Corrections Issued KEVIN SARGSYAN
Deputy Drilled-In Anchors 10/16/2023 Conditional Approval MICHAEL PELHAM
Deputy Steel/Welding 10/16/2023 Conditional Approval MICHAEL PELHAM
Footing/Foundation/Slab 10/18/2023 Partial Approval ARAM AVEDISIAN
Deputy Steel/Welding 10/31/2023 Conditional Approval ARAM AVEDISIAN
Floor/Roof Diaphrgm/Shear Wall 12/27/2023 Partial Inspection KEVIN SARGSYAN
Deputy Reinf. Concrete 1/26/2024 Approved ARAM AVEDISIAN
Deputy Wood Construction 1/26/2024 Approved ARAM AVEDISIAN
Floor/Roof Diaphrgm/Shear Wall 1/26/2024 Conditional Approval ARAM AVEDISIAN
Floor/Roof Diaphrgm/Shear Wall 2/16/2024 Corrections Issued KEVIN SARGSYAN
Deputy Steel/Welding 3/1/2024 Conditional Approval KEVIN SARGSYAN
Deputy Steel/Welding 3/4/2024 Conditional Approval KEVIN SARGSYAN
Deputy Steel/Welding 3/15/2024 Conditional Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 3/19/2024 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 3/21/2024 Partial Approval ARAM AVEDISIAN
Special/Order Compliance 3/26/2024 Partial Approval ARAM AVEDISIAN
Sewer 4/18/2024 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 5/23/2024 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Rough 5/24/2024 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Rough 6/11/2024 Not Ready for Inspection KEVIN SARGSYAN
Shower Pan 7/3/2024 Approved ARAM AVEDISIAN
ELECTRICAL-Rough 7/10/2024 Approved CARLOS MATAMOROS
HVAC-Rough 7/16/2024 Corrections Issued KEVIN SARGSYAN
Interior/Exterior Lathing 7/16/2024 Partial Approval KEVIN SARGSYAN
Interior/Exterior Lathing 7/26/2024 Approved KEVIN SARGSYAN
Footing/Foundation/Slab 9/18/2024 Partial Approval KEVIN SARGSYAN
HVAC-Rough 9/20/2024 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 9/24/2024 Not Ready for Inspection KEVIN SARGSYAN
Deputy Drilled-In Anchors 9/24/2024 Conditional Approval KEVIN SARGSYAN
Green Building Rough 9/24/2024 Not Ready for Inspection KEVIN SARGSYAN
Verify Sprinkler Sign Off 9/24/2024 Approved KEVIN SARGSYAN
Footing/Foundation/Slab 9/25/2024 Partial Approval KEVIN SARGSYAN
Reinforced Concrete Frame 9/27/2024 Partial Approval ARAM AVEDISIAN
PLUMBING-Rough 10/3/2024 Corrections Issued KEVIN SARGSYAN
PLUMBING-Rough 10/9/2024 Corrections Issued KEVIN SARGSYAN
PLUMBING-Rough 10/16/2024 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 11/19/2024 Approved JESUS RODRIGUEZ
BUILDING-Rough-Frame 11/26/2024 Approved KEVIN SARGSYAN
Green Building Rough 11/26/2024 Approved KEVIN SARGSYAN
Insulation 11/26/2024 Approved KEVIN SARGSYAN
Drywall Nailing 12/19/2024 Approved EVAN COOPER
Gas Test 7/28/2025 Approved KEVIN SARGSYAN
Footing/Foundation/Slab 11/14/2025 Approved HERBERT GIRON
PLUMBING-Final 4/1/2026 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Final 4/2/2026 Corrections Issued KEVIN SARGSYAN
HVAC-Final 4/3/2026 Approved KEVIN SARGSYAN
ELECTRICAL-Final 4/10/2026 Approved KEVIN SARGSYAN
PLUMBING-Final 4/13/2026 Approved KEVIN SARGSYAN
Final 6/11/2026 Corrections Issued KEVIN SARGSYAN
Green Building Final 6/11/2026 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 6/11/2026 SGSOV Approved KEVIN SARGSYAN
Smoke Detectors 6/11/2026 Approved KEVIN SARGSYAN
Structural Steel Frame 6/11/2026 Approved KEVIN SARGSYAN
Final 6/23/2026 OK to Issue CofO KEVIN SARGSYAN