215 S CONCORD ST 90063

Certificate Information: 215 S CONCORD ST 90063

Application / Permit
22014-10000-04053
Plan Check / Job No.
B22LA16023
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW ADDITION AND REMODEL TO EXISTING SFD TO ADD BEDROOM AND WALK IN CLOSET , AND PATIO COVER (TOTAL 199 SQFT). WORK PER WFPP "COMPLY WITH DEPARTMENT ORDER effective date 06/10/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"
Permit Issued
Issued on 4/21/2023
Issuing Office
Metro
Current Status
Issued on 4/21/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/11/2022 APPLICANT
Assigned to Plan Check Engineer 8/11/2022 ADAM HEGAZI
Corrections Issued 8/11/2022 ADAM HEGAZI
Applicant returned to address corrections 10/4/2022 DANIEL SANJUAN
Plan Check Approved 10/18/2022 SHANGQIN XIE
Issued 4/21/2023 APPLICANT

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 8/19/2022 JEANIE LAM
Grading Pre-Inspection Cleared 9/14/2022 KIRK LINKLATER
Eng Process Fee Ord 176,300 Cleared 9/19/2022 JEANIE LAM

Contact Information

Contractor Baron Construction & Design; Lic. No.: 917339-B 1171 N KENMORE AVE APT #8      LOS ANGELES, CA 90029

Inspector Information

DANIEL DELACRUZ, (323) 526-9348 Office Hours: 7:00-8:00 AM MON-FRI
PEDRO SIERRA, (323) 526-9348 Office Hours: 7:00-8:00 AM MON-FRI
ROBERT MINASSIANS, (323) 526-9348 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 5/5/2023 Not Ready for Inspection RAUL VASQUEZ
Footing/Foundation/Slab 5/5/2023 Not Ready for Inspection RAUL VASQUEZ
METHANE-Barrier 5/5/2023 Not Ready for Inspection RAUL VASQUEZ
METHANE-Subgrade 5/5/2023 Not Ready for Inspection RAUL VASQUEZ
Deputy Drilled-In Anchors 5/9/2023 Approved MARK VAN SLOOTEN
Excavation/Setback/Form/Re-Bar 5/9/2023 Approved MARK VAN SLOOTEN
Footing/Foundation/Slab 5/9/2023 Approved MARK VAN SLOOTEN
METHANE-Barrier 5/9/2023 Approved MARK VAN SLOOTEN
METHANE-Subgrade 5/9/2023 Approved MARK VAN SLOOTEN
BUILDING-Rough-Frame 6/5/2023 Corrections Issued MARK VAN SLOOTEN
ELECTRICAL-Rough 6/5/2023 Not Ready for Inspection MARK VAN SLOOTEN
Green Building Rough 6/5/2023 Corrections Issued MARK VAN SLOOTEN
METHANE-Rough 6/5/2023 Corrections Issued MARK VAN SLOOTEN
BUILDING-Rough-Frame 6/22/2023 Approved RAUL VASQUEZ
ELECTRICAL-Rough 6/22/2023 Not Ready for Inspection RAUL VASQUEZ
Green Building Rough 6/22/2023 Approved RAUL VASQUEZ
METHANE-Rough 6/22/2023 Approved RAUL VASQUEZ
ELECTRICAL-Rough 6/30/2023 Corrections Issued MARK VAN SLOOTEN
Floor/Roof Diaphrgm/Shear Wall 6/30/2023 Approved MARK VAN SLOOTEN
Insulation 6/30/2023 Not Ready for Inspection MARK VAN SLOOTEN
Interior/Exterior Lathing 6/30/2023 Corrections Issued MARK VAN SLOOTEN
Insulation 7/7/2023 Approved PEDRO SIERRA
Drywall Nailing 7/14/2023 Approved PEDRO SIERRA
Interior/Exterior Lathing 7/14/2023 Approved PEDRO SIERRA
Final 10/11/2023 Corrections Issued PEDRO SIERRA
Green Building Final 10/11/2023 Not Ready for Inspection PEDRO SIERRA
SGSOV-Seismic Gas S/O Valve 10/11/2023 SGSOV Not Ready PEDRO SIERRA
Smoke Detectors 10/11/2023 Corrections Issued PEDRO SIERRA
Special/Order Compliance 10/16/2023 Conditional Approval PEDRO SIERRA