1515 N UMEO ROAD 90272

Certificate Information: 1515 N UMEO ROAD 90272

Application / Permit
22014-10000-03805
Plan Check / Job No.
B22LA14782
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
eplan- 196 SQUARE-FOOT GROUND FLOOR DEN ADDITION AND A 72 SQUARE-FOOT ENTRY ADDITION UNDER THE EXISTING ROOF TO AN EXISTING TWO-STORY SINGLE-FAMILY RESIDENCE. REPLACE ASPHALT SHINGLE ROOFING WITH NEW STANDING SEAM METAL ROOFING. (NO GRADING OR LANDSCAPING PROPOSED)
Permit Issued
Issued on 2/10/2023
Issuing Office
Current Status
CofO Issued on 7/19/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/29/2022 APPLICANT
Assigned to Plan Check Engineer 8/5/2022 HANS SANTIAGO
Corrections Issued 8/7/2022 HANS SANTIAGO
Applicant returned to address corrections 9/7/2022 HANS SANTIAGO
Plan Check Approved 2/6/2023 ANDREW SANTIAGO
Issued 2/10/2023 APPLICANT
CofO in Progress 7/19/2025 MICHAEL PELHAM
Permit Finaled 7/19/2025 RICHARD STEINBACH
CofO Issued 7/19/2025 RICHARD STEINBACH
Permit Finaled 7/19/2025 RICHARD STEINBACH

Permit Application Clearance Information

Grading Pre-Inspection Cleared 8/15/2022 KIRK LINKLATER
BHO/Hillside ordinance Cleared 8/18/2022 CATHERINE ADROVER
BHO/Hillside ordinance Cleared 8/18/2022 CATHERINE ADROVER
BHO/Hillside ordinance Cleared 8/18/2022 CATHERINE ADROVER
Eng Process Fee Ord 176,300 Cleared 8/18/2022 CATHERINE ADROVER
Roof/Waste drainage to street Cleared 8/18/2022 CATHERINE ADROVER
Hydrant and Access approval Cleared 9/23/2022 MATTHEW CRAIG
BHO/Hillside ordinance Cleared 11/18/2022 RAYMOND MUGAMBWA
Private sewage disp. approval Cleared 1/31/2023 KIRK LINKLATER

Contact Information

Architect Jackowski,, Holli Lynn; Lic. No.: NA38533       ,
Contractor Farnsworth W Builders; Lic. No.: 947797-B       ,
Engineer Wu,, Allen Chun-Ying; Lic. No.: NA69385       ,

Inspector Information

KEVIN SARGSYAN, (310) 914-3889 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 6/20/2023 Corrections Issued HERBERT GIRON
Excavation/Setback/Form/Re-Bar 6/23/2023 Approved EVAN COOPER
Deputy Drilled-In Anchors 6/26/2023 No Access for Inspection KENNETH NAGLE
Floor/Roof Diaphrgm/Shear Wall 7/7/2023 Partial Approval KENNETH NAGLE
Floor/Roof Diaphrgm/Shear Wall 7/10/2023 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 7/11/2023 Approved KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 7/12/2023 No Access for Inspection KEVIN SARGSYAN
Drywall Nailing 7/17/2023 Partial Approval KEVIN SARGSYAN
Interior/Exterior Lathing 7/19/2023 Approved KEVIN SARGSYAN
Deputy Drilled-In Anchors 7/31/2023 Conditional Approval KEVIN SARGSYAN
BUILDING-Rough-Frame 8/1/2023 Conditional Approval STEPHANIE SWANSON
ELECTRICAL-Rough 8/1/2023 Approved STEPHANIE SWANSON
HVAC-Rough 8/1/2023 Corrections Issued STEPHANIE SWANSON
BUILDING-Rough-Frame 8/4/2023 Approved KEVIN SARGSYAN
HVAC-Rough 8/4/2023 Approved KEVIN SARGSYAN
Insulation 8/4/2023 Approved KEVIN SARGSYAN
Drywall Nailing 8/8/2023 Approved KEVIN SARGSYAN
ELECTRICAL-Final 9/21/2023 Approved KEVIN SARGSYAN
Final 9/21/2023 Corrections Issued KEVIN SARGSYAN
Footing/Foundation/Slab 9/21/2023 Approved KEVIN SARGSYAN
HVAC-Final 9/21/2023 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 9/21/2023 SGSOV Not Ready KEVIN SARGSYAN
Smoke Detectors 9/21/2023 Approved KEVIN SARGSYAN
Final 10/5/2023 Not Ready for Inspection KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 10/5/2023 SGSOV Approved KEVIN SARGSYAN
Final 7/19/2025 OK to Issue CofO MICHAEL PELHAM