10838 W LAWLER ST 90034

Certificate Information: 10838 W LAWLER ST 90034

Application / Permit
22014-10000-02575
Plan Check / Job No.
B22LA10035
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
Convert Existing 367 SF Garage into a new ADU with an 161 SF addition per LAMC 12.22A.33(c)-(d). The new 528 SF ADU will be a one bedroom one bathroom. Fully Sprinkled per NFPA 13D
Permit Issued
Issued on 8/3/2022
Issuing Office
Current Status
CofO Issued on 2/20/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/27/2022 APPLICANT
Assigned to Plan Check Engineer 5/31/2022 HANS SANTIAGO
Corrections Issued 6/1/2022 HANS SANTIAGO
Plan Check Approved 7/7/2022 ANDREW SANTIAGO
Issued 8/3/2022 APPLICANT
CofO in Progress 2/20/2024 STEPHANIE SWANSON
CofO Issued 2/20/2024 DANIEL ORRANTE
Permit Finaled 2/20/2024 DANIEL ORRANTE

Permit Application Clearance Information

Grading Pre-Inspection Cleared 6/14/2022 KIRK LINKLATER
Address approval Cleared 6/27/2022 JENSON LEE
Eng Process Fee Ord 176,300 Cleared 6/27/2022 JENSON LEE
Sewer availability Cleared 6/27/2022 JENSON LEE
Roof/Waste drainage to street Cleared 6/30/2022 JENSON LEE

Contact Information

Contractor 8a General Construction; Lic. No.: 1020625-B 11660 EL GRANADA AVE      LYNWOOD, CA 90262
Engineer Rhee,, Kyle; Lic. No.: C78215 2753 WAVERLY DR 403      LOS ANGELES, CA 90039

Inspector Information

KIRK SANDERS, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI
ARAM AVEDISIAN, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/18/2023 Approved TEMISTOCLES CAAL
Footing/Foundation/Slab 9/26/2023 Approved JESUS PINEDA
PLUMBING-Rough 9/26/2023 Partial Approval JESUS PINEDA
ELECTRICAL-Rough 10/13/2023 Approved JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 10/13/2023 Corrections Issued JESUS PINEDA
Rough-Elec/Plmb/HVAC 10/13/2023 Not Ready for Inspection JESUS PINEDA
PLUMBING-Rough 10/18/2023 Corrections Issued CLAYTON GRAHAM
HVAC-Rough 11/6/2023 Corrections Issued BEN MOLSTAD
Interior/Exterior Lathing 11/6/2023 Not Ready for Inspection BEN MOLSTAD
PLUMBING-Rough 11/6/2023 Approved BEN MOLSTAD
Interior/Exterior Lathing 11/22/2023 Approved BEN MOLSTAD
BUILDING-Rough-Frame 12/4/2023 Approved JESUS PINEDA
ELECTRICAL-Rough 12/4/2023 Approved JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 12/4/2023 Approved JESUS PINEDA
HVAC-Rough 12/4/2023 Approved JESUS PINEDA
PLUMBING-Rough 12/4/2023 Approved JESUS PINEDA
Verify Sprinkler Sign Off 12/4/2023 Approved JESUS PINEDA
Insulation 12/8/2023 Approved STEPHANIE SWANSON
Drywall Nailing 12/11/2023 Approved JESUS PINEDA
Interior/Exterior Lathing 12/15/2023 Approved JESUS PINEDA
Final 1/26/2024 Corrections Issued JESUS PINEDA
SGSOV-Seismic Gas S/O Valve 1/26/2024 SGSOV Approved JESUS PINEDA
Smoke Detectors 1/26/2024 Approved JESUS PINEDA
Final 2/14/2024 Not Ready for Inspection JESUS PINEDA
Gas Test 2/14/2024 Approved JESUS PINEDA
Final 2/16/2024 OK to Issue CofO STEPHANIE SWANSON