Application / Permit
22014-10000-02262
Plan Check / Job No.
B22LA08755
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ePlan ADDITION AND REMODEL TO EXISTING SFD
Permit Issued
Issued on 12/31/2022
Issuing Office
Current Status
CofO Corrected on 3/19/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/9/2022 APPLICANT
Assigned to Plan Check Engineer 6/9/2022 CRYSTEL MAALOUF
Corrections Issued 6/21/2022 CRYSTEL MAALOUF
Quality Review Completed 7/1/2022 FARUK SEZER
Plan Check Approved 10/14/2022 CRYSTEL MAALOUF
Issued 12/31/2022 APPLICANT
CofO in Progress 11/20/2025 JOSH MEISTER
Permit Finaled-Status Void 11/22/2025 DEROLD HAUFF
CofO Issued-Status Void 11/22/2025 DEROLD HAUFF
Re-Activate Permit 3/19/2026 DEROLD HAUFF
Permit Finaled 3/19/2026 DEROLD HAUFF
CofO Corrected 3/19/2026 DEROLD HAUFF
Permit Finaled 3/19/2026 DEROLD HAUFF

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 9/16/2022 ABEL CASILLAS
Eng Process Fee Ord 176,300 Cleared 10/7/2022 ABEL CASILLAS
Sewer availability Cleared 10/7/2022 ABEL CASILLAS

Contact Information

Contractor Maipo Build; Lic. No.: 1077541-B       ,
Engineer Espino,, Manuel A; Lic. No.: C55526 12109 WOODRUFF AVE      DOWNEY, CA 90241

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 2/1/2023 Conditional Approval MICHAEL LEWIS
Excavation/Setback/Form/Re-Bar 2/6/2023 Approved MICHAEL LEWIS
Footing/Foundation/Slab 2/6/2023 Partial Approval MICHAEL LEWIS
Deputy Drilled-In Anchors 2/21/2023 Conditional Approval MICHAEL LEWIS
Floor/Roof Diaphrgm/Shear Wall 2/28/2023 Partial Approval MICHAEL LEWIS
Deputy Drilled-In Anchors 3/28/2023 Conditional Approval MICHAEL LEWIS
Floor/Roof Diaphrgm/Shear Wall 7/7/2023 Corrections Issued LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 7/11/2023 Approved LILIANA PORTILLO
ELECTRICAL-Rough 9/11/2023 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 9/11/2023 Corrections Issued LILIANA PORTILLO
ELECTRICAL-Rough 9/15/2023 Approved LILIANA PORTILLO
HVAC-Rough 9/15/2023 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 9/15/2023 Approved LILIANA PORTILLO
HVAC-Rough 11/15/2023 Partial Approval LILIANA PORTILLO
METHANE-Rough 11/15/2023 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 11/16/2023 Approved LILIANA PORTILLO
Interior/Exterior Lathing 11/16/2023 Not Ready for Inspection LILIANA PORTILLO
Green Building Rough 11/27/2023 Approved LILIANA PORTILLO
Insulation 11/27/2023 Approved LILIANA PORTILLO
Drywall Nailing 12/11/2023 Approved LILIANA PORTILLO
Interior/Exterior Lathing 12/11/2023 Partial Approval LILIANA PORTILLO
Interior/Exterior Lathing 5/20/2024 Approved AMIR NAZARIAN
Shower Pan 5/20/2024 Partial Approval AMIR NAZARIAN
Interior/Exterior Lathing 6/10/2024 Approved AMY COLIN
Shower Pan 6/10/2024 Approved AMY COLIN
Sewer 6/30/2025 Approved JOSE MACIAS
Underground Mechanical 6/30/2025 Conditional Approval JOSE MACIAS
Sewer 9/12/2025 Approved JOSE MACIAS
Underground Mechanical 9/12/2025 Approved JOSE MACIAS
ELECTRICAL-Final 10/17/2025 Approved JOSH MEISTER
Gas Test 10/17/2025 Approved JOSH MEISTER
HVAC-Final 10/17/2025 Approved JOSH MEISTER
PLUMBING-Final 10/17/2025 Approved JOSH MEISTER
Final 10/30/2025 Corrections Issued ENRIQUE MIRELES
Footing/Foundation/Slab 10/30/2025 Approved ENRIQUE MIRELES
METHANE-Barrier 10/30/2025 Approved ENRIQUE MIRELES
METHANE-Subgrade 10/30/2025 Approved ENRIQUE MIRELES
SGSOV-Seismic Gas S/O Valve 10/30/2025 SGSOV Approved ENRIQUE MIRELES
Smoke Detectors 10/30/2025 Approved ENRIQUE MIRELES
Final 11/5/2025 OK to Issue CofO JOSH MEISTER