740 N ALTA VISTA BLVD 90046

Certificate Information: 740 N ALTA VISTA BLVD 90046

Application / Permit
22014-10000-01809
Plan Check / Job No.
B22LA06960
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ADDITION TO (E) SINGLE FAMILY DWELLING AT REAR OF BUILDING . AND WORK TO INCLUDE INTERIOR REMODELING. 1 OF 2
Permit Issued
Issued on 1/19/2023
Issuing Office
San Pedro
Current Status
CofO Issued on 5/30/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/19/2022 APPLICANT
Assigned to Plan Check Engineer 4/29/2022 GEORGE ALVAREZ
Corrections Issued 5/2/2022 GEORGE ALVAREZ
Building Plans Picked Up 5/6/2022 APPLICANT
Applicant returned to address corrections 6/17/2022 FERNANDO FLORES
Applicant returned to address corrections 8/12/2022 LUKE GONZALES
Plan Check Approved 8/19/2022 GEORGE ALVAREZ
Issued 1/19/2023 APPLICANT
CofO in Progress 5/23/2024 AMIR NAZARIAN
Permit Finaled 5/30/2024 DEROLD HAUFF
CofO Issued 5/30/2024 DEROLD HAUFF
Permit Finaled 5/30/2024 DEROLD HAUFF

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 5/26/2022 JEANIE LAM
Sewer availability Cleared 5/26/2022 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 5/27/2022 JEANIE LAM

Contact Information

Contractor Chung Nong Contractors; Lic. No.: 964739-B 933 LINDENCLIFF ST      TORRANCE, CA 90502
Engineer Yu,, Kunyoung; Lic. No.: C66880 22812 ERIEL AVE      TORRANCE, CA 90505

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 2/6/2023 Conditional Approval MICHAEL LEWIS
Footing/Foundation/Slab 3/7/2023 Corrections Issued JOSEPH MCGARRY
METHANE-Barrier 3/7/2023 Approved JOSEPH MCGARRY
METHANE-Subgrade 3/7/2023 Approved JOSEPH MCGARRY
Excavation/Setback/Form/Re-Bar 3/9/2023 Approved MICHAEL LEWIS
Footing/Foundation/Slab 3/9/2023 Approved MICHAEL LEWIS
Deputy Drilled-In Anchors 4/11/2023 Approved MICHAEL LEWIS
Floor/Roof Diaphrgm/Shear Wall 4/26/2023 Partial Approval MICHAEL LEWIS
ELECTRICAL-Rough 8/4/2023 Corrections Issued LILIANA PORTILLO
ELECTRICAL-Rough 8/16/2023 Approved LILIANA PORTILLO
HVAC-Rough 8/16/2023 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 8/16/2023 Approved LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 8/24/2023 Approved LILIANA PORTILLO
HVAC-Rough 8/24/2023 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 8/30/2023 Conditional Approval LILIANA PORTILLO
Green Building Rough 8/30/2023 Not Ready for Inspection LILIANA PORTILLO
METHANE-Rough 8/30/2023 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 9/19/2023 Approved LILIANA PORTILLO
Green Building Rough 9/19/2023 Approved LILIANA PORTILLO
Insulation 9/19/2023 Approved LILIANA PORTILLO
Interior/Exterior Lathing 9/19/2023 Partial Approval LILIANA PORTILLO
Drywall Nailing 10/6/2023 Approved LILIANA PORTILLO
Interior/Exterior Lathing 10/20/2023 Approved LILIANA PORTILLO
Shower Pan 10/20/2023 Approved LILIANA PORTILLO
ELECTRICAL-Rough 3/19/2024 Corrections Issued AMIR NAZARIAN
ELECTRICAL-Final 4/3/2024 Conditional Approval AMIR NAZARIAN
Service/Power Release 4/4/2024 Approved AMIR NAZARIAN
Final 5/16/2024 Corrections Issued AMIR NAZARIAN
Green Building Final 5/16/2024 Approved AMIR NAZARIAN
SGSOV-Seismic Gas S/O Valve 5/16/2024 SGSOV Not Ready AMIR NAZARIAN
Smoke Detectors 5/16/2024 Approved AMIR NAZARIAN
Final 5/21/2024 OK to Issue CofO AMIR NAZARIAN
SGSOV-Seismic Gas S/O Valve 5/21/2024 SGSOV Approved AMIR NAZARIAN