|
Deputy Reinf. Concrete
|
9/13/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
9/14/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
9/15/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
9/15/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
9/16/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
9/20/2022
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/21/2022
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
9/22/2022
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
9/23/2022
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
9/26/2022
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
9/27/2022
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
9/28/2022
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
9/29/2022
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
9/30/2022
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Shotcrete
|
10/12/2022
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
10/12/2022
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
10/13/2022
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Drilled-In Anchors
|
10/28/2022
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Drilled-In Anchors
|
10/31/2022
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Drilled-In Anchors
|
11/2/2022
|
Conditional Approval
|
DERRICK SPENCER
|
|
Deputy Drilled-In Anchors
|
11/2/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
11/3/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
11/4/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
11/8/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
11/9/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
11/10/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
11/10/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
11/14/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
11/15/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
11/17/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
11/21/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
11/22/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
11/23/2022
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Reinf. Concrete
|
11/28/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
11/29/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Final
|
11/29/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
11/29/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Green Building Final
|
11/29/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
SGSOV-Seismic Gas S/O Valve
|
11/29/2022
|
SGSOV Not Ready
|
SORIN CIRSTOIU
|
|
Smoke Detectors
|
11/29/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
11/30/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
12/1/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
12/2/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
12/5/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
12/5/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
12/6/2022
|
Conditional Approval
|
DAVID TSAU
|
|
Deputy Reinf. Concrete
|
12/6/2022
|
Conditional Approval
|
DAVID TSAU
|
|
Light Gage Steel Frame
|
12/7/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
12/15/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
12/20/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
12/20/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Pre-Stress Concrete
|
12/21/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Other (see comments)
|
12/22/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Other (see comments)
|
12/23/2022
|
Approved
|
GRANT WOODS
|
|
Masonry Wall/Backfill
|
12/27/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
12/29/2022
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
12/30/2022
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
1/4/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Shotcrete
|
1/4/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
1/5/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Shotcrete
|
1/5/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Pre-Inspection
|
1/5/2023
|
Partial Inspection
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
1/6/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Shotcrete
|
1/6/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
1/10/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
1/10/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
1/11/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
1/11/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
1/11/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
1/12/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
1/12/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Pre-Inspection
|
1/12/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
1/13/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
1/13/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
1/18/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
1/18/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Shotcrete
|
1/18/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
1/19/2023
|
Partial Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
1/19/2023
|
Partial Approval
|
MICHAEL PETRUSKO
|
|
Deputy Shotcrete
|
1/19/2023
|
Partial Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
1/20/2023
|
Corrections Issued
|
FARHAD DADBIN
|
|
Deputy Reinf. Masonry
|
1/20/2023
|
Corrections Issued
|
FARHAD DADBIN
|
|
Deputy Shotcrete
|
1/20/2023
|
Corrections Issued
|
FARHAD DADBIN
|
|
Deputy Drilled-In Anchors
|
1/23/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
1/23/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
1/24/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
1/24/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
1/25/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
1/25/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
1/26/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
1/26/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
1/27/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
1/27/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
1/30/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
1/30/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
1/30/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Reinforced Masonry Frame
|
1/30/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
1/31/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
1/31/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
1/31/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
2/1/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
2/1/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
2/1/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
2/2/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
2/2/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
2/2/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
2/3/2023
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
2/3/2023
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Masonry
|
2/3/2023
|
Approved
|
FARHAD DADBIN
|
|
Deputy Drilled-In Anchors
|
2/6/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
2/6/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
2/6/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
2/7/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
2/7/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
2/7/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
2/8/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
2/8/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
2/8/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Reinforced Masonry Frame
|
2/8/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
2/9/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
2/9/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
2/9/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
2/10/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
2/10/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
2/10/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
2/13/2023
|
Approved
|
AMANUEL BERHE
|
|
Deputy Reinf. Concrete
|
2/13/2023
|
Approved
|
AMANUEL BERHE
|
|
Deputy Reinf. Masonry
|
2/13/2023
|
Approved
|
AMANUEL BERHE
|
|
Footing/Foundation/Slab
|
2/13/2023
|
Approved
|
AMANUEL BERHE
|
|
Deputy Drilled-In Anchors
|
2/14/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
2/14/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
2/14/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
2/15/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
2/15/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
2/15/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
2/16/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
2/16/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
2/16/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
2/17/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
2/17/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
2/17/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Light Gage Steel Frame
|
2/21/2023
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
2/22/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
2/23/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
2/24/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
2/28/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
2/28/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/1/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
3/1/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
3/2/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Reinf. Concrete
|
3/2/2023
|
Conditional Approval
|
AMANUEL BERHE
|
|
Deputy Drilled-In Anchors
|
3/3/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/3/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/6/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/6/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
3/6/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/7/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/7/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
3/7/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Light Gage Steel Frame
|
3/7/2023
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/8/2023
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
3/8/2023
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Masonry
|
3/8/2023
|
Approved
|
FARHAD DADBIN
|
|
Deputy Steel/Welding
|
3/8/2023
|
Approved
|
FARHAD DADBIN
|
|
Deputy Drilled-In Anchors
|
3/9/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/9/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
3/9/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/10/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/10/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
3/10/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Light Gage Steel Frame
|
3/10/2023
|
Corrections Issued
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/13/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/13/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/14/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/14/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Drywall Nailing
|
3/14/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/15/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/15/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/16/2023
|
Conditional Approval
|
SHAVONNE ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/16/2023
|
Conditional Approval
|
SHAVONNE ESPINOZA
|
|
Deputy Drilled-In Anchors
|
3/17/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/17/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/20/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/20/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/21/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/21/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/22/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/22/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Steel/Welding
|
3/22/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/23/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/23/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/24/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/24/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/28/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/28/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
3/30/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
3/30/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Light Gage Steel Frame
|
3/30/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Reinforced Concrete Frame
|
3/30/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Steel/Welding
|
3/31/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/3/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/3/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Wood Construction
|
4/3/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
4/4/2023
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/5/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/5/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
4/5/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Steel/Welding
|
4/5/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
4/5/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/6/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/6/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
4/6/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Steel/Welding
|
4/6/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/7/2023
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
4/7/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
4/7/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Steel/Welding
|
4/10/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/12/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
4/12/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Steel/Welding
|
4/12/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
4/13/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/13/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/14/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/14/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
4/17/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/18/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/18/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/19/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/19/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
4/19/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/20/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/21/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/21/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/24/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/24/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/25/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/25/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Footing/Foundation/Slab
|
4/25/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/26/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/26/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Excavation/Setback/Form/Re-Bar
|
4/26/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/27/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/27/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
4/28/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
4/28/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
5/1/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
5/1/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Steel/Welding
|
5/1/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
5/2/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
5/2/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Interior/Exterior Lathing
|
5/2/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
5/3/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
5/3/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
5/4/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
5/4/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
5/5/2023
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
5/5/2023
|
Approved
|
FARHAD DADBIN
|
|
Deputy Steel/Welding
|
5/5/2023
|
Approved
|
FARHAD DADBIN
|
|
Deputy Drilled-In Anchors
|
5/8/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
5/8/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
5/8/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Light Gage Steel Frame
|
5/8/2023
|
Partial Approval
|
GRANT WOODS
|
|
Deputy Drilled-In Anchors
|
5/9/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
5/9/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
5/9/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
5/10/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
5/10/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
5/10/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
5/11/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
5/11/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Masonry
|
5/11/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Footing/Foundation/Slab
|
5/11/2023
|
Not Ready for Inspection
|
GRANT WOODS
|
|
Deputy Drilled-In Anchors
|
5/12/2023
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Reinf. Concrete
|
5/12/2023
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Reinf. Masonry
|
5/12/2023
|
Conditional Approval
|
ALAN NOVAK
|
|
Deputy Drilled-In Anchors
|
5/16/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
5/16/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Masonry
|
5/16/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Green Building Rough
|
5/16/2023
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Drilled-In Anchors
|
5/17/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
5/17/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
5/17/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
5/18/2023
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
5/18/2023
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Masonry
|
5/18/2023
|
Approved
|
FARHAD DADBIN
|
|
T-Bar Ceiling
|
5/18/2023
|
Partial Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
5/19/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
5/19/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Masonry
|
5/19/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Drilled-In Anchors
|
5/22/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Drilled-In Anchors
|
5/22/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
5/22/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
5/22/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
5/22/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Masonry
|
5/22/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
5/23/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
5/23/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
5/23/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Masonry Wall/Backfill
|
5/23/2023
|
Partial Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
5/24/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
5/24/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
5/24/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
5/25/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
5/25/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Masonry
|
5/25/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Masonry Wall/Backfill
|
5/25/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Drilled-In Anchors
|
5/26/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
5/26/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
5/26/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
5/30/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Concrete
|
5/30/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Reinf. Masonry
|
5/30/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
5/31/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
5/31/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
5/31/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
6/1/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/1/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Masonry
|
6/1/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Piling/Pier/Caisson
|
6/1/2023
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Drilled-In Anchors
|
6/2/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
6/2/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
6/2/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
6/6/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
6/6/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
6/6/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Light Gage Steel Frame
|
6/6/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
6/7/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/7/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Masonry
|
6/7/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Drilled-In Anchors
|
6/8/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
6/8/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
6/8/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
6/9/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/9/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Masonry
|
6/9/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Footing/Foundation/Slab
|
6/9/2023
|
Partial Approval
|
FARHAD DADBIN
|
|
Light Gage Steel Frame
|
6/9/2023
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Drilled-In Anchors
|
6/13/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
6/13/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
6/13/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
6/14/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
6/14/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
6/14/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Light Gage Steel Frame
|
6/14/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
6/15/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
6/15/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Reinf. Masonry
|
6/15/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Deputy Drilled-In Anchors
|
6/16/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
6/16/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
6/16/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Drywall Nailing
|
6/16/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Light Gage Steel Frame
|
6/16/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
6/21/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/21/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Masonry
|
6/21/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Drilled-In Anchors
|
6/22/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/22/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Masonry
|
6/22/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Footing/Foundation/Slab
|
6/22/2023
|
Partial Approval
|
FARHAD DADBIN
|
|
Deputy Drilled-In Anchors
|
6/23/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
6/23/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
6/23/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
6/27/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
6/27/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
6/27/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Footing/Foundation/Slab
|
6/27/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
6/28/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
6/28/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
6/28/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
6/29/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Concrete
|
6/29/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Deputy Reinf. Masonry
|
6/29/2023
|
Conditional Approval
|
GRANT WOODS
|
|
Footing/Foundation/Slab
|
6/29/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
6/30/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
6/30/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
6/30/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Masonry
|
7/3/2023
|
Approved
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
7/5/2023
|
Conditional Approval
|
SORIN CIRSTOIU
|
|
Deputy Drilled-In Anchors
|
7/13/2023
|
Conditional Approval
|
FARHAD DADBIN
|
|
Special/Order Compliance
|
7/19/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Light Gage Steel Frame
|
7/20/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Light Gage Steel Frame
|
7/24/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Light Gage Steel Frame
|
8/17/2023
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Light Gage Steel Frame
|
8/21/2023
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Deputy Steel/Welding
|
8/29/2023
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
9/13/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Deputy Reinf. Concrete
|
10/4/2023
|
Conditional Approval
|
MICHAEL PETRUSKO
|
|
Footing/Foundation/Slab
|
10/4/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Excavation/Setback/Form/Re-Bar
|
10/13/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
T-Bar Ceiling
|
10/17/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Interior/Exterior Lathing
|
10/24/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Interior/Exterior Lathing
|
10/31/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Deputy Drilled-In Anchors
|
11/2/2023
|
Conditional Approval
|
SHAVONNE ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
11/8/2023
|
Approved
|
MICHAEL PETRUSKO
|
|
Special/Order Compliance
|
11/16/2023
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
11/22/2023
|
Conditional Approval
|
CASIMIR BRITTON
|
|
Light Gage Steel Frame
|
12/15/2023
|
Approved
|
CASIMIR BRITTON
|
|
Pre-Inspection
|
1/8/2024
|
Partial Inspection
|
CASIMIR BRITTON
|
|
Final
|
2/20/2024
|
Not Ready for Inspection
|
CASIMIR BRITTON
|
|
Green Building Final
|
2/20/2024
|
Not Ready for Inspection
|
CASIMIR BRITTON
|
|
SGSOV-Seismic Gas S/O Valve
|
2/20/2024
|
SGSOV Not Ready
|
CASIMIR BRITTON
|
|
Smoke Detectors
|
2/20/2024
|
Not Ready for Inspection
|
CASIMIR BRITTON
|
|
Green Building Rough
|
2/22/2024
|
Not Ready for Inspection
|
CASIMIR BRITTON
|
|
Special/Order Compliance
|
2/22/2024
|
Not Ready for Inspection
|
CASIMIR BRITTON
|
|
Green Building Final
|
2/26/2024
|
Approved
|
CASIMIR BRITTON
|
|
Final
|
3/5/2024
|
Permit Finaled
|
MICHAEL PETRUSKO
|
|
SGSOV-Seismic Gas S/O Valve
|
3/5/2024
|
SGSOV Approved
|
MICHAEL PETRUSKO
|
|
Smoke Detectors
|
3/5/2024
|
Approved
|
MICHAEL PETRUSKO
|