11960 W SUNSET BLVD 90049

Certificate Information: 11960 W SUNSET BLVD 90049

Application / Permit
22014-10000-01683
Plan Check / Job No.
B22LA06480
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(6) Church
Work Description
TENANT IMPROVEMENT TO RENOVATE ASSOCIATED MEETING/EVENT HALL, ADMINISTRATION AND CLASSROOM SPACES, ADDITION OF STAIRCASES AT ENTRANCE; ENTRACE CANOPY UNDER SEAPARATE PERMIT
Permit Issued
Issued on 9/1/2022
Issuing Office
Metro
Current Status
Permit Finaled on 3/5/2024

Permit Application Status History

Submitted 4/11/2022 APPLICANT
Assigned to Plan Check Engineer 4/28/2022 SINA KHOSRAVI
Corrections Issued 5/4/2022 SINA KHOSRAVI
Quality Review Completed 5/12/2022 CHARLES CHANG
Green Plans Picked Up 5/25/2022 APPLICANT
Disabled Access Plans Picked Up 5/27/2022 APPLICANT
Applicant returned to address corrections 6/23/2022 SINA KHOSRAVI
Applicant returned to address corrections 7/26/2022 SINA KHOSRAVI
Applicant returned to address corrections 8/4/2022 SINA KHOSRAVI
Plan Check Approved 9/1/2022 SINA KHOSRAVI
Issued 9/1/2022 APPLICANT
Permit Finaled 3/5/2024 MICHAEL PETRUSKO

Permit Application Clearance Information

ZA Case Cleared 5/10/2022 DANIEL CORONADO
ZA Case Cleared 5/10/2022 DANIEL CORONADO
ZA Case Cleared 5/10/2022 DANIEL CORONADO
ZA Case Cleared 5/10/2022 DANIEL CORONADO
ZA Case Cleared 5/12/2022 DANIEL CORONADO
ZA Case Cleared 5/12/2022 DANIEL CORONADO
ZA Case Cleared 5/13/2022 DANIEL CORONADO
ZA Case Cleared 5/25/2022 DANIEL CORONADO
ZA Case Cleared 5/25/2022 DANIEL CORONADO
Eng Process Fee Ord 176,300 Cleared 6/22/2022 CATHERINE ADROVER
Green Code Cleared 7/14/2022 AARON COSTA
Fire Marshal Fire Life Safety Cleared 8/18/2022 RONILO MULAWIN
DAS Clearance Cleared 8/19/2022 EDDIE GARIN
GPI Written Notices Cleared 9/1/2022 SINA KHOSRAVI
Grading Pre-Inspection Cleared 9/1/2022 SINA KHOSRAVI

Contact Information

Contractor Jones & Jones Construction; Lic. No.: 917674-B 1301 MARICOPA HIGHWAY      OJAI, CA 93023
Engineer Tanouye,, Russell; Lic. No.: S2850 888 S FIGUEROA ST 18TH FLOOR      LOS ANGELES, CA 90017

Inspector Information

CASIMIR BRITTON, (310) 914-3913 Office Hours: 7:00-8:00 AM MON-FRI
SHAVONNE ESPINOZA, (310) 914-3913 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Reinf. Concrete 9/13/2022 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 9/14/2022 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 9/15/2022 Approved SORIN CIRSTOIU
Reinforced Concrete Frame 9/15/2022 Partial Inspection SORIN CIRSTOIU
Deputy Reinf. Concrete 9/16/2022 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 9/20/2022 Approved DERRICK SPENCER
Deputy Reinf. Concrete 9/21/2022 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 9/22/2022 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 9/23/2022 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 9/26/2022 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 9/27/2022 Approved NICK LAROCCA
Deputy Reinf. Concrete 9/28/2022 Conditional Approval PAUL DAVIDSON
Deputy Reinf. Concrete 9/29/2022 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 9/30/2022 Conditional Approval GRANT WOODS
Deputy Shotcrete 10/12/2022 Approved DERRICK SPENCER
Reinforced Concrete Frame 10/12/2022 Partial Approval DERRICK SPENCER
Deputy Shotcrete 10/13/2022 Conditional Approval DERRICK SPENCER
Deputy Drilled-In Anchors 10/28/2022 Conditional Approval DERRICK SPENCER
Deputy Drilled-In Anchors 10/31/2022 Conditional Approval DERRICK SPENCER
Deputy Drilled-In Anchors 11/2/2022 Conditional Approval DERRICK SPENCER
Deputy Drilled-In Anchors 11/2/2022 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 11/3/2022 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 11/4/2022 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 11/8/2022 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 11/9/2022 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 11/10/2022 Approved SORIN CIRSTOIU
Footing/Foundation/Slab 11/10/2022 Partial Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 11/14/2022 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 11/15/2022 Conditional Approval SORIN CIRSTOIU
Footing/Foundation/Slab 11/17/2022 Partial Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 11/21/2022 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 11/22/2022 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 11/23/2022 Conditional Approval DAVID TSAU
Deputy Reinf. Concrete 11/28/2022 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 11/29/2022 Approved SORIN CIRSTOIU
Final 11/29/2022 Partial Inspection SORIN CIRSTOIU
Footing/Foundation/Slab 11/29/2022 Partial Approval SORIN CIRSTOIU
Green Building Final 11/29/2022 Partial Inspection SORIN CIRSTOIU
SGSOV-Seismic Gas S/O Valve 11/29/2022 SGSOV Not Ready SORIN CIRSTOIU
Smoke Detectors 11/29/2022 Partial Inspection SORIN CIRSTOIU
Deputy Reinf. Concrete 11/30/2022 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 12/1/2022 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 12/2/2022 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/5/2022 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 12/5/2022 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/6/2022 Conditional Approval DAVID TSAU
Deputy Reinf. Concrete 12/6/2022 Conditional Approval DAVID TSAU
Light Gage Steel Frame 12/7/2022 Partial Inspection SORIN CIRSTOIU
Footing/Foundation/Slab 12/15/2022 Partial Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 12/20/2022 Approved SORIN CIRSTOIU
Footing/Foundation/Slab 12/20/2022 Partial Approval SORIN CIRSTOIU
Deputy Pre-Stress Concrete 12/21/2022 Conditional Approval SORIN CIRSTOIU
Deputy Other (see comments) 12/22/2022 Conditional Approval SORIN CIRSTOIU
Deputy Other (see comments) 12/23/2022 Approved GRANT WOODS
Masonry Wall/Backfill 12/27/2022 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/29/2022 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 12/30/2022 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/4/2023 Approved SORIN CIRSTOIU
Deputy Shotcrete 1/4/2023 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/5/2023 Approved SORIN CIRSTOIU
Deputy Shotcrete 1/5/2023 Approved SORIN CIRSTOIU
Pre-Inspection 1/5/2023 Partial Inspection MICHAEL PETRUSKO
Deputy Drilled-In Anchors 1/6/2023 Approved SORIN CIRSTOIU
Deputy Shotcrete 1/6/2023 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/10/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 1/10/2023 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/11/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 1/11/2023 Approved SORIN CIRSTOIU
Reinforced Concrete Frame 1/11/2023 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/12/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 1/12/2023 Conditional Approval SORIN CIRSTOIU
Pre-Inspection 1/12/2023 Approved MICHAEL PETRUSKO
Deputy Drilled-In Anchors 1/13/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 1/13/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/18/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 1/18/2023 Conditional Approval SORIN CIRSTOIU
Deputy Shotcrete 1/18/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/19/2023 Partial Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 1/19/2023 Partial Approval MICHAEL PETRUSKO
Deputy Shotcrete 1/19/2023 Partial Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 1/20/2023 Corrections Issued FARHAD DADBIN
Deputy Reinf. Masonry 1/20/2023 Corrections Issued FARHAD DADBIN
Deputy Shotcrete 1/20/2023 Corrections Issued FARHAD DADBIN
Deputy Drilled-In Anchors 1/23/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 1/23/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/24/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 1/24/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/25/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 1/25/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/26/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 1/26/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/27/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 1/27/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/30/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 1/30/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 1/30/2023 Approved SORIN CIRSTOIU
Reinforced Masonry Frame 1/30/2023 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 1/31/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 1/31/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 1/31/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/1/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 2/1/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 2/1/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 2/2/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 2/2/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 2/2/2023 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/3/2023 Partial Approval FARHAD DADBIN
Deputy Reinf. Concrete 2/3/2023 Approved FARHAD DADBIN
Deputy Reinf. Masonry 2/3/2023 Approved FARHAD DADBIN
Deputy Drilled-In Anchors 2/6/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 2/6/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 2/6/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/7/2023 Partial Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 2/7/2023 Partial Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 2/7/2023 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/8/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 2/8/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 2/8/2023 Approved SORIN CIRSTOIU
Reinforced Masonry Frame 2/8/2023 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/9/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 2/9/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 2/9/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/10/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 2/10/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 2/10/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/13/2023 Approved AMANUEL BERHE
Deputy Reinf. Concrete 2/13/2023 Approved AMANUEL BERHE
Deputy Reinf. Masonry 2/13/2023 Approved AMANUEL BERHE
Footing/Foundation/Slab 2/13/2023 Approved AMANUEL BERHE
Deputy Drilled-In Anchors 2/14/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 2/14/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 2/14/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/15/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 2/15/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 2/15/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/16/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 2/16/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 2/16/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 2/17/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 2/17/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 2/17/2023 Conditional Approval SORIN CIRSTOIU
Light Gage Steel Frame 2/21/2023 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/22/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 2/23/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 2/24/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 2/28/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 2/28/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/1/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 3/1/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 3/2/2023 Conditional Approval AMANUEL BERHE
Deputy Reinf. Concrete 3/2/2023 Conditional Approval AMANUEL BERHE
Deputy Drilled-In Anchors 3/3/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 3/3/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/6/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 3/6/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 3/6/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/7/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/7/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 3/7/2023 Approved SORIN CIRSTOIU
Light Gage Steel Frame 3/7/2023 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/8/2023 Approved FARHAD DADBIN
Deputy Reinf. Concrete 3/8/2023 Approved FARHAD DADBIN
Deputy Reinf. Masonry 3/8/2023 Approved FARHAD DADBIN
Deputy Steel/Welding 3/8/2023 Approved FARHAD DADBIN
Deputy Drilled-In Anchors 3/9/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 3/9/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 3/9/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/10/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/10/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 3/10/2023 Approved SORIN CIRSTOIU
Light Gage Steel Frame 3/10/2023 Corrections Issued SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/13/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 3/13/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/14/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/14/2023 Approved SORIN CIRSTOIU
Drywall Nailing 3/14/2023 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/15/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 3/15/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/16/2023 Conditional Approval SHAVONNE ESPINOZA
Deputy Reinf. Concrete 3/16/2023 Conditional Approval SHAVONNE ESPINOZA
Deputy Drilled-In Anchors 3/17/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 3/17/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/20/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 3/20/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/21/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 3/21/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/22/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 3/22/2023 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 3/22/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/23/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 3/23/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/24/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/24/2023 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/28/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 3/28/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 3/30/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 3/30/2023 Approved SORIN CIRSTOIU
Light Gage Steel Frame 3/30/2023 Partial Approval SORIN CIRSTOIU
Reinforced Concrete Frame 3/30/2023 Partial Approval SORIN CIRSTOIU
Deputy Steel/Welding 3/31/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/3/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 4/3/2023 Conditional Approval SORIN CIRSTOIU
Deputy Wood Construction 4/3/2023 Conditional Approval SORIN CIRSTOIU
Footing/Foundation/Slab 4/4/2023 Partial Inspection SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/5/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 4/5/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 4/5/2023 Approved SORIN CIRSTOIU
Deputy Steel/Welding 4/5/2023 Approved SORIN CIRSTOIU
Footing/Foundation/Slab 4/5/2023 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/6/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 4/6/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 4/6/2023 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 4/6/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/7/2023 Approved FARHAD DADBIN
Deputy Reinf. Concrete 4/7/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Masonry 4/7/2023 Approved SORIN CIRSTOIU
Deputy Steel/Welding 4/10/2023 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/12/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 4/12/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Steel/Welding 4/12/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 4/13/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 4/13/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/14/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 4/14/2023 Conditional Approval SORIN CIRSTOIU
Footing/Foundation/Slab 4/17/2023 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/18/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 4/18/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/19/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 4/19/2023 Approved SORIN CIRSTOIU
Footing/Foundation/Slab 4/19/2023 Partial Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 4/20/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/21/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 4/21/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/24/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 4/24/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/25/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 4/25/2023 Approved SORIN CIRSTOIU
Footing/Foundation/Slab 4/25/2023 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/26/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 4/26/2023 Approved SORIN CIRSTOIU
Excavation/Setback/Form/Re-Bar 4/26/2023 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/27/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 4/27/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/28/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 4/28/2023 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/1/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 5/1/2023 Conditional Approval SORIN CIRSTOIU
Deputy Steel/Welding 5/1/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/2/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 5/2/2023 Approved SORIN CIRSTOIU
Interior/Exterior Lathing 5/2/2023 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/3/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 5/3/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/4/2023 Approved SORIN CIRSTOIU
Deputy Reinf. Concrete 5/4/2023 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/5/2023 Approved FARHAD DADBIN
Deputy Reinf. Concrete 5/5/2023 Approved FARHAD DADBIN
Deputy Steel/Welding 5/5/2023 Approved FARHAD DADBIN
Deputy Drilled-In Anchors 5/8/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 5/8/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 5/8/2023 Conditional Approval SORIN CIRSTOIU
Light Gage Steel Frame 5/8/2023 Partial Approval GRANT WOODS
Deputy Drilled-In Anchors 5/9/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 5/9/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 5/9/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/10/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 5/10/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 5/10/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/11/2023 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 5/11/2023 Conditional Approval GRANT WOODS
Deputy Reinf. Masonry 5/11/2023 Conditional Approval GRANT WOODS
Footing/Foundation/Slab 5/11/2023 Not Ready for Inspection GRANT WOODS
Deputy Drilled-In Anchors 5/12/2023 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 5/12/2023 Conditional Approval ALAN NOVAK
Deputy Reinf. Masonry 5/12/2023 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 5/16/2023 Conditional Approval FARHAD DADBIN
Deputy Reinf. Concrete 5/16/2023 Conditional Approval FARHAD DADBIN
Deputy Reinf. Masonry 5/16/2023 Conditional Approval FARHAD DADBIN
Green Building Rough 5/16/2023 Partial Approval FARHAD DADBIN
Deputy Drilled-In Anchors 5/17/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 5/17/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 5/17/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 5/18/2023 Approved FARHAD DADBIN
Deputy Reinf. Concrete 5/18/2023 Approved FARHAD DADBIN
Deputy Reinf. Masonry 5/18/2023 Approved FARHAD DADBIN
T-Bar Ceiling 5/18/2023 Partial Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 5/19/2023 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 5/19/2023 Conditional Approval GRANT WOODS
Deputy Reinf. Masonry 5/19/2023 Conditional Approval GRANT WOODS
Deputy Drilled-In Anchors 5/22/2023 Conditional Approval FARHAD DADBIN
Deputy Drilled-In Anchors 5/22/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 5/22/2023 Conditional Approval FARHAD DADBIN
Deputy Reinf. Concrete 5/22/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 5/22/2023 Conditional Approval FARHAD DADBIN
Deputy Reinf. Masonry 5/22/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/23/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 5/23/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 5/23/2023 Conditional Approval MICHAEL PETRUSKO
Masonry Wall/Backfill 5/23/2023 Partial Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 5/24/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 5/24/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 5/24/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 5/25/2023 Conditional Approval FARHAD DADBIN
Deputy Reinf. Concrete 5/25/2023 Conditional Approval FARHAD DADBIN
Deputy Reinf. Masonry 5/25/2023 Conditional Approval FARHAD DADBIN
Masonry Wall/Backfill 5/25/2023 Conditional Approval FARHAD DADBIN
Deputy Drilled-In Anchors 5/26/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 5/26/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 5/26/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 5/30/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Concrete 5/30/2023 Conditional Approval SORIN CIRSTOIU
Deputy Reinf. Masonry 5/30/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 5/31/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 5/31/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 5/31/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 6/1/2023 Conditional Approval FARHAD DADBIN
Deputy Reinf. Concrete 6/1/2023 Conditional Approval FARHAD DADBIN
Deputy Reinf. Masonry 6/1/2023 Conditional Approval FARHAD DADBIN
Piling/Pier/Caisson 6/1/2023 Partial Approval FARHAD DADBIN
Deputy Drilled-In Anchors 6/2/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 6/2/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 6/2/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 6/6/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 6/6/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 6/6/2023 Conditional Approval MICHAEL PETRUSKO
Light Gage Steel Frame 6/6/2023 Approved MICHAEL PETRUSKO
Deputy Drilled-In Anchors 6/7/2023 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 6/7/2023 Conditional Approval GRANT WOODS
Deputy Reinf. Masonry 6/7/2023 Conditional Approval GRANT WOODS
Deputy Drilled-In Anchors 6/8/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 6/8/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 6/8/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 6/9/2023 Conditional Approval FARHAD DADBIN
Deputy Reinf. Concrete 6/9/2023 Conditional Approval FARHAD DADBIN
Deputy Reinf. Masonry 6/9/2023 Conditional Approval FARHAD DADBIN
Footing/Foundation/Slab 6/9/2023 Partial Approval FARHAD DADBIN
Light Gage Steel Frame 6/9/2023 Partial Approval FARHAD DADBIN
Deputy Drilled-In Anchors 6/13/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 6/13/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 6/13/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 6/14/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 6/14/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 6/14/2023 Conditional Approval MICHAEL PETRUSKO
Light Gage Steel Frame 6/14/2023 Approved MICHAEL PETRUSKO
Deputy Drilled-In Anchors 6/15/2023 Conditional Approval FARHAD DADBIN
Deputy Reinf. Concrete 6/15/2023 Conditional Approval FARHAD DADBIN
Deputy Reinf. Masonry 6/15/2023 Conditional Approval FARHAD DADBIN
Deputy Drilled-In Anchors 6/16/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 6/16/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 6/16/2023 Conditional Approval MICHAEL PETRUSKO
Drywall Nailing 6/16/2023 Approved MICHAEL PETRUSKO
Light Gage Steel Frame 6/16/2023 Approved MICHAEL PETRUSKO
Deputy Drilled-In Anchors 6/21/2023 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 6/21/2023 Conditional Approval GRANT WOODS
Deputy Reinf. Masonry 6/21/2023 Conditional Approval GRANT WOODS
Deputy Drilled-In Anchors 6/22/2023 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 6/22/2023 Conditional Approval GRANT WOODS
Deputy Reinf. Masonry 6/22/2023 Conditional Approval GRANT WOODS
Footing/Foundation/Slab 6/22/2023 Partial Approval FARHAD DADBIN
Deputy Drilled-In Anchors 6/23/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 6/23/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 6/23/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 6/27/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 6/27/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 6/27/2023 Conditional Approval MICHAEL PETRUSKO
Footing/Foundation/Slab 6/27/2023 Approved MICHAEL PETRUSKO
Deputy Drilled-In Anchors 6/28/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 6/28/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 6/28/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Drilled-In Anchors 6/29/2023 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 6/29/2023 Conditional Approval GRANT WOODS
Deputy Reinf. Masonry 6/29/2023 Conditional Approval GRANT WOODS
Footing/Foundation/Slab 6/29/2023 Approved MICHAEL PETRUSKO
Deputy Drilled-In Anchors 6/30/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Concrete 6/30/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 6/30/2023 Conditional Approval MICHAEL PETRUSKO
Deputy Reinf. Masonry 7/3/2023 Approved SORIN CIRSTOIU
Deputy Drilled-In Anchors 7/5/2023 Conditional Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 7/13/2023 Conditional Approval FARHAD DADBIN
Special/Order Compliance 7/19/2023 Approved MICHAEL PETRUSKO
Light Gage Steel Frame 7/20/2023 Approved MICHAEL PETRUSKO
Light Gage Steel Frame 7/24/2023 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/17/2023 Partial Approval SORIN CIRSTOIU
Light Gage Steel Frame 8/21/2023 Partial Inspection SORIN CIRSTOIU
Deputy Steel/Welding 8/29/2023 Conditional Approval PAUL DAVIDSON
Reinforced Concrete Frame 9/13/2023 Approved MICHAEL PETRUSKO
Deputy Reinf. Concrete 10/4/2023 Conditional Approval MICHAEL PETRUSKO
Footing/Foundation/Slab 10/4/2023 Approved MICHAEL PETRUSKO
Excavation/Setback/Form/Re-Bar 10/13/2023 Approved MICHAEL PETRUSKO
T-Bar Ceiling 10/17/2023 Approved MICHAEL PETRUSKO
Interior/Exterior Lathing 10/24/2023 Approved MICHAEL PETRUSKO
Interior/Exterior Lathing 10/31/2023 Approved MICHAEL PETRUSKO
Deputy Drilled-In Anchors 11/2/2023 Conditional Approval SHAVONNE ESPINOZA
Excavation/Setback/Form/Re-Bar 11/8/2023 Approved MICHAEL PETRUSKO
Special/Order Compliance 11/16/2023 Partial Inspection PAUL DAVIDSON
Deputy Reinf. Concrete 11/22/2023 Conditional Approval CASIMIR BRITTON
Light Gage Steel Frame 12/15/2023 Approved CASIMIR BRITTON
Pre-Inspection 1/8/2024 Partial Inspection CASIMIR BRITTON
Final 2/20/2024 Not Ready for Inspection CASIMIR BRITTON
Green Building Final 2/20/2024 Not Ready for Inspection CASIMIR BRITTON
SGSOV-Seismic Gas S/O Valve 2/20/2024 SGSOV Not Ready CASIMIR BRITTON
Smoke Detectors 2/20/2024 Not Ready for Inspection CASIMIR BRITTON
Green Building Rough 2/22/2024 Not Ready for Inspection CASIMIR BRITTON
Special/Order Compliance 2/22/2024 Not Ready for Inspection CASIMIR BRITTON
Green Building Final 2/26/2024 Approved CASIMIR BRITTON
Final 3/5/2024 Permit Finaled MICHAEL PETRUSKO
SGSOV-Seismic Gas S/O Valve 3/5/2024 SGSOV Approved MICHAEL PETRUSKO
Smoke Detectors 3/5/2024 Approved MICHAEL PETRUSKO