3490 N LA SOMBRA DR 90068

Certificate Information: 3490 N LA SOMBRA DR 90068

Application / Permit
22014-10000-00947
Plan Check / Job No.
B22LA03666
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
1-STORY ADDITION AT REAR OF BUILDING AND INTERIOR REMODEL TO (E) SFD. RECONFIGURE INTERIOR PARTITION LAYOUT AT REAR OF BUILDING.
Permit Issued
Issued on 2/3/2023
Issuing Office
West Los Angeles
Current Status
CofO Issued on 4/2/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/2/2022 APPLICANT
Assigned to Plan Check Engineer 3/4/2022 MINA HABILI
Corrections Issued 3/4/2022 MINA HABILI
Plan Check Approved 4/6/2022 GEORGE ALVAREZ
Building Plans Picked Up 4/21/2022 APPLICANT
Issued 2/3/2023 APPLICANT
CofO in Progress 1/29/2024 BRIAN SULLIVAN
CofO Issued 4/2/2024 RONALD MYRICK
Permit Finaled 4/2/2024 RONALD MYRICK

Permit Application Clearance Information

Grading Pre-Inspection Cleared 3/24/2022 ROBERT HUGHES
Roof/Waste drainage to street Cleared 3/29/2022 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 3/30/2022 WALLIE JONG
ZI Cleared 4/6/2022 LIKYELESH ABERA

Contact Information

Architect Magid,, David; Lic. No.: C33393 144 N. HAYWORTH AVE      LOS ANGELES, CA 90048
Contractor Woldman Construction Company Inc; Lic. No.: 1091490-B 1431 CRATER STREET      SIMI VALLEY, CA 93063
Engineer Lam,, Chsung Say; Lic. No.: C78287 6919 THELMA AVE      BUENA PARK, CA 90620

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 2/15/2023 Approved BRIAN SULLIVAN
Footing/Foundation/Slab 2/15/2023 Approved BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 2/22/2023 Partial Approval BRIAN SULLIVAN
BUILDING-Rough-Frame 4/26/2023 Approved BRIAN SULLIVAN
ELECTRICAL-Rough 4/26/2023 Approved BRIAN SULLIVAN
Green Building Rough 4/26/2023 Approved BRIAN SULLIVAN
PLUMBING-Rough 4/26/2023 Approved BRIAN SULLIVAN
HVAC-Rough 5/1/2023 Not Ready for Inspection BRIAN SULLIVAN
Shower Pan 5/1/2023 Approved BRIAN SULLIVAN
HVAC-Rough 5/3/2023 Approved BRIAN SULLIVAN
Interior/Exterior Lathing 5/3/2023 Partial Approval BRIAN SULLIVAN
Insulation 5/5/2023 Approved BRIAN SULLIVAN
Insulation 5/8/2023 Approved BRIAN SULLIVAN
Drywall Nailing 5/17/2023 Approved BRIAN SULLIVAN
Interior/Exterior Lathing 5/17/2023 Approved BRIAN SULLIVAN
ELECTRICAL-Final 9/21/2023 Approved BRIAN SULLIVAN
Final 9/21/2023 Corrections Issued BRIAN SULLIVAN
Green Building Final 9/21/2023 Approved BRIAN SULLIVAN
HVAC-Final 9/21/2023 Approved BRIAN SULLIVAN
PLUMBING-Final 9/21/2023 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 9/21/2023 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 9/21/2023 Approved BRIAN SULLIVAN
Final 1/26/2024 OK to Issue CofO BRIAN SULLIVAN