3829 N LATROBE ST 90031

Certificate Information: 3829 N LATROBE ST 90031

Application / Permit
22014-10000-00364
Plan Check / Job No.
B22LA01427
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ADDITION AND ALTERATION TO AN EXISTING SINGLE FAMILY DWELLING. INSTALL AUTOMATIC FIRE SPRINKLERS UNDER SEPARATE PERMIT. 1 OF 3
Permit Issued
Issued on 10/26/2022
Issuing Office
Metro
Current Status
Issued on 10/26/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 1/27/2022 APPLICANT
Assigned to Plan Check Engineer 2/10/2022 ALBERT SERVIN
Corrections Issued 2/14/2022 ALBERT SERVIN
Building Plans Picked Up 2/15/2022 APPLICANT
Quality Review Completed 2/16/2022 KEN GILL
Applicant returned to address corrections 8/30/2022 ALBERT SERVIN
Applicant returned to address corrections 9/1/2022 ALBERT SERVIN
Applicant returned to address corrections 9/7/2022 ALBERT SERVIN
Applicant returned to address corrections 9/8/2022 ALBERT SERVIN
Plan Check Approved 10/20/2022 ALBERT SERVIN
Issued 10/26/2022 APPLICANT

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 2/22/2022 STEVE MELGAR
BHO/Hillside ordinance Cleared 2/22/2022 STEVE MELGAR
BHO/Hillside ordinance Cleared 2/22/2022 STEVE MELGAR
BHO/Hillside ordinance Cleared 2/22/2022 STEVE MELGAR
BHO/Hillside ordinance Cleared 2/22/2022 STEVE MELGAR
Eng Process Fee Ord 176,300 Cleared 3/30/2022 STEVE MELGAR
Sewer availability Cleared 3/30/2022 STEVE MELGAR
Hydrant and Access approval Cleared 4/11/2022 LAURINDA MEADE
"D" conditions Cleared 5/4/2022 LOUIS ORTEGA
"Q" conditions Cleared 5/4/2022 LOUIS ORTEGA
Miscellaneous Cleared 5/4/2022 LOUIS ORTEGA
Private street Cleared 5/4/2022 LOUIS ORTEGA
Low Impact Development Cleared 7/13/2022 TA ANH
Roof/Waste drainage to street Cleared 9/6/2022 JEANETTE VONG
Building over 36-ft Cleared 9/7/2022 CALOSHA APPROVED
GPI Written Notices Cleared 9/20/2022 ALBERT SERVIN

Contact Information

Contractor Owner-Builder       ,
Engineer Garza,, Omar Leonel; Lic. No.: S5593 600 WILSHIRE BLVD 760      LOS ANGELES, CA 90017
Engineer Rybak,, Richard; Lic. No.: GE2131 20312 TAU PLACE      CHATSWORTH, CA 91311

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/4/2023 Partial Inspection AMY COLIN
Footing/Foundation/Slab 5/23/2023 Partial Approval AMY COLIN
Piling/Pier/Caisson 5/23/2023 Approved AMY COLIN
Deputy Reinf. Concrete 7/21/2023 Conditional Approval AMY COLIN
Footing/Foundation/Slab 7/24/2023 Partial Approval AMY COLIN
Deputy Reinf. Concrete 7/26/2023 Conditional Approval AMY COLIN
Excavation/Setback/Form/Re-Bar 7/27/2023 Not Ready for Inspection AMY COLIN
Deputy Reinf. Concrete 8/11/2023 Conditional Approval AMY COLIN
Reinforced Concrete Frame 8/14/2023 Partial Approval AMY COLIN
Footing/Foundation/Slab 9/12/2023 Partial Approval AMY COLIN
Deputy Drilled-In Anchors 9/22/2023 Partial Approval SCOTT FINNILA
Footing/Foundation/Slab 9/22/2023 Partial Approval SCOTT FINNILA
Deputy Reinf. Concrete 9/25/2023 Conditional Approval AMY COLIN
Deputy Drilled-In Anchors 10/2/2023 Conditional Approval AMY COLIN
Deputy Reinf. Concrete 10/2/2023 Conditional Approval AMY COLIN
Reinforced Concrete Frame 10/3/2023 Partial Approval AMY COLIN
Deputy Reinf. Concrete 10/6/2023 Conditional Approval CRAIG VAUGHAN
Deputy Reinf. Concrete 10/12/2023 Approved AMY COLIN
Footing/Foundation/Slab 10/12/2023 Partial Approval AMY COLIN
PLUMBING-Rough 10/12/2023 Partial Approval AMY COLIN
Wood Frame 10/12/2023 Not Ready for Inspection AMY COLIN
Deputy Reinf. Concrete 10/13/2023 Conditional Approval AMY COLIN
Deputy Reinf. Concrete 11/1/2023 Conditional Approval AMY COLIN
Excavation/Setback/Form/Re-Bar 11/1/2023 Partial Approval AMY COLIN
BUILDING-Rough-Frame 12/26/2023 Partial Approval AMY COLIN
Floor/Roof Diaphrgm/Shear Wall 12/26/2023 Partial Approval AMY COLIN
Green Building Rough 12/26/2023 Not Ready for Inspection AMY COLIN
Verify Sprinkler Sign Off 12/26/2023 Not Ready for Inspection AMY COLIN
Deputy Reinf. Concrete 1/18/2024 Approved AMY COLIN
Excavation/Setback/Form/Re-Bar 1/18/2024 Approved AMY COLIN
Footing/Foundation/Slab 1/18/2024 Approved AMY COLIN
Pre-Inspection 6/11/2024 Partial Inspection LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 8/13/2024 Partial Approval ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 9/25/2024 Not Ready for Inspection ROY SPAULDING
ELECTRICAL-Rough 9/25/2024 Not Ready for Inspection ROY SPAULDING
Green Building Rough 9/25/2024 Approved ROY SPAULDING
PLUMBING-Rough 9/25/2024 Approved ROY SPAULDING
Verify Sprinkler Sign Off 9/25/2024 Approved ROY SPAULDING
Interior/Exterior Lathing 10/2/2024 Not Ready for Inspection LILIANA PORTILLO
ELECTRICAL-Rough 10/8/2024 Corrections Issued LILIANA PORTILLO
Special/Order Compliance 10/8/2024 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 10/29/2024 Corrections Issued LILIANA PORTILLO
ELECTRICAL-Rough 10/29/2024 Approved LILIANA PORTILLO
HVAC-Rough 10/29/2024 Approved LILIANA PORTILLO
Interior/Exterior Lathing 10/29/2024 Partial Approval LILIANA PORTILLO
Verify Sprinkler Sign Off 10/29/2024 Approved LILIANA PORTILLO
Insulation 11/7/2024 Approved WILLIAM SIERRA
Interior/Exterior Lathing 11/7/2024 Approved WILLIAM SIERRA
BUILDING-Rough-Frame 11/19/2024 Approved LILIANA PORTILLO
Drywall Nailing 1/3/2025 Approved ALEX COLIN
ELECTRICAL-Final 5/19/2026 Corrections Issued NICHOLAS LOPEZ
Final 5/19/2026 Corrections Issued NICHOLAS LOPEZ
Green Building Final 5/19/2026 Corrections Issued NICHOLAS LOPEZ
HVAC-Final 5/19/2026 Conditional Approval NICHOLAS LOPEZ
PLUMBING-Final 5/19/2026 Approved NICHOLAS LOPEZ
SGSOV-Seismic Gas S/O Valve 5/19/2026 SGSOV Approved NICHOLAS LOPEZ
Smoke Detectors 5/19/2026 Approved NICHOLAS LOPEZ
ELECTRICAL-Final 6/3/2026 Approved OSVALDO PARAMO
Final 6/3/2026 Corrections Issued OSVALDO PARAMO
Green Building Final 6/3/2026 Approved OSVALDO PARAMO