618 1/4-3/4 W 54TH ST 90037

Certificate Information: 618 1/4-3/4 W 54TH ST 90037

Application / Permit
22010-30000-00909
Plan Check / Job No.
B22WL00731
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
2 (N) DETACHED ADU PER GCS 65852.2(e)(1)(D) and LAMC 12.22 A.33(c), (d), and (g)
Permit Issued
Issued on 5/5/2023
Issuing Office
Current Status
Issued on 5/5/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 2/24/2022 APPLICANT
Assigned to Plan Check Engineer 3/1/2022 JASON JANGADA
Corrections Issued 3/1/2022 JASON JANGADA
Applicant returned to address corrections 3/23/2022 JASON JANGADA
Applicant returned to address corrections 5/17/2022 JASON JANGADA
Applicant returned to address corrections 5/20/2022 JASON JANGADA
Building Plans Picked Up 5/24/2022 APPLICANT
Applicant returned to address corrections 11/17/2022 EDWIN ESPIN
Applicant returned to address corrections 12/7/2022 DAVID CASTILLO
Plan Check Approved 12/14/2022 JOHNPAUL ISIP
Issued 5/5/2023 APPLICANT

Permit Application Clearance Information

Address approval Cleared 8/18/2022 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 8/19/2022 JEANIE LAM
Permit Cleared 8/19/2022 JEANIE LAM
Sewer availability Cleared 8/19/2022 JEANIE LAM
Tenant Habitability Plan Cleared 8/22/2022 MICHAEL SOTO
CPC Cleared 8/31/2022 SHASHA YU
Hydrant and Access approval Cleared 9/30/2022 GILBERT URREA
Construction near power lines Cleared 10/1/2022 RIDWAN HARDY
Low Impact Development Cleared 11/2/2022 DEBORA LEITE
Roof/Waste drainage to street Cleared 11/2/2022 JEANIE LAM
Trees in Parkway Cleared 11/9/2022 ADALBERTO VERA

Contact Information

Contractor Custom L & A Construction Inc; Lic. No.: 1068792-B 531 SUMNER ST A      BAKERSFIELD, CA 93305
Engineer Erdelyi,, Peter Tibor; Lic. No.: C26962 2999 OVERLAND AVE STE 103      LOS ANGELES, CA 90064

Inspector Information

BARRY HACHE, (213) 202-9851 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/16/2023 No Access for Inspection SABAS ALONSO
Underground Mechanical 5/16/2023 No Access for Inspection SABAS ALONSO
Excavation/Setback/Form/Re-Bar 6/6/2023 No Access for Inspection SABAS ALONSO
Excavation/Setback/Form/Re-Bar 6/14/2023 Partial Approval SABAS ALONSO
Footing/Foundation/Slab 6/14/2023 Corrections Issued SABAS ALONSO
Excavation/Setback/Form/Re-Bar 6/21/2023 Approved SABAS ALONSO
Footing/Foundation/Slab 6/21/2023 Approved SABAS ALONSO
ELECTRICAL-Rough 7/5/2023 Corrections Issued SABAS ALONSO
HVAC-Rough 7/5/2023 Not Ready for Inspection SABAS ALONSO
PLUMBING-Rough 7/5/2023 Approved SABAS ALONSO
ELECTRICAL-Rough 7/11/2023 Approved SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 7/11/2023 Partial Approval SABAS ALONSO
HVAC-Rough 7/11/2023 Approved SABAS ALONSO
PLUMBING-Rough 7/11/2023 Approved SABAS ALONSO
BUILDING-Rough-Frame 7/12/2023 Not Ready for Inspection SABAS ALONSO
BUILDING-Rough-Frame 7/21/2023 Conditional Approval MICHAEL LEWIS
Green Building Rough 7/21/2023 Not Ready for Inspection MICHAEL LEWIS
Deputy Wood Construction 7/24/2023 Conditional Approval ALEJANDRO DE ARTOLA
Green Building Rough 7/24/2023 Approved MICHAEL LEWIS
Insulation 7/24/2023 Conditional Approval MICHAEL LEWIS
Interior/Exterior Lathing 7/24/2023 Approved MICHAEL LEWIS
BUILDING-Rough-Frame 7/27/2023 Partial Inspection MICHAEL LEWIS
Drywall Nailing 7/27/2023 Approved MICHAEL LEWIS
Interior/Exterior Lathing 7/27/2023 Partial Inspection MICHAEL LEWIS
BUILDING-Rough-Frame 6/17/2026 Approved BARRY HACHE
HVAC-Final 6/17/2026 Corrections Issued BARRY HACHE
SGSOV-Seismic Gas S/O Valve 6/17/2026 SGSOV Not Ready BARRY HACHE
Smoke Detectors 6/17/2026 Not Ready for Inspection BARRY HACHE
Underground Mechanical 6/17/2026 Not Ready for Inspection BARRY HACHE
Verify Sprinkler Sign Off 6/17/2026 Approved BARRY HACHE