509 W WASHINGTON BLVD 90015

Certificate Information: 509 W WASHINGTON BLVD 90015

Application / Permit
22010-20000-06171
Plan Check / Job No.
B22VN18299
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(8) Automobile Sales - new
Work Description
***EPLAN. SEVEN STORY TYPE I-B NEW FRANCHISE AUTOMOBILE SALES WITH VEHICLE REPAIRS, VEHICLE PARTS & TIRE STORAGE & ROOF PARKING DECK.
Permit Issued
Issued on 4/29/2024
Issuing Office
Metro
Current Status
Issued on 4/29/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/19/2022 APPLICANT
Assigned to Plan Check Engineer 1/11/2023 GARO TELMI
Corrections Issued 1/21/2023 GARO TELMI
Quality Review Completed 2/9/2023 CHARLES CHANG
Applicant returned to address corrections 3/2/2023 GARO TELMI
Applicant returned to address corrections 3/20/2023 GARO TELMI
Applicant returned to address corrections 4/2/2023 GARO TELMI
Applicant returned to address corrections 4/4/2023 GARO TELMI
Applicant returned to address corrections 4/10/2023 GARO TELMI
Applicant returned to address corrections 4/12/2023 GARO TELMI
Applicant returned to address corrections 4/16/2023 GARO TELMI
Applicant returned to address corrections 5/3/2023 GARO TELMI
Applicant returned to address corrections 5/24/2023 GARO TELMI
Applicant returned to address corrections 8/10/2023 GARO TELMI
Applicant returned to address corrections 9/27/2023 GARO TELMI
Applicant returned to address corrections 11/14/2023 GARO TELMI
Plan Check Approved 4/26/2024 GARO TELMI
Issued 4/29/2024 APPLICANT
TCO Issued (Expire Date: 09-27-2026) 3/31/2026 ERNESTO CORRAL

Permit Application Clearance Information

Community Plan Implem. Overlay Cleared 2/16/2023 RIDWAN HARDY
Construction near power lines Cleared 2/16/2023 RIDWAN HARDY
Address approval Cleared 2/27/2023 AMAAN MALIK
Bicycle Parking Cleared 3/14/2023 KATHERINE MENDOZA
Community Plan Implem. Overlay Cleared 3/22/2023 COLLINS ALLAN
Driveway location Cleared 3/22/2023 COLLINS ALLAN
Eng Process Fee Ord 176,300 Cleared 3/23/2023 AMAAN MALIK
Sewer availability Cleared 3/23/2023 AMAAN MALIK
Encroachment in public way Cleared 4/8/2023 ADRIAN SANCHEZ
Trees in Parkway Cleared 5/2/2023 ADALBERTO VERA
Community Plan Implem. Overlay Cleared 5/30/2023 ADALBERTO VERA
DAS Clearance Cleared 5/31/2023 Kevin Morales
Green Code Cleared 5/31/2023 MICHAEL AYERS
Abandoned oil well Cleared 6/8/2023 KURT CORRAL
Hydrant and Access approval Cleared 6/8/2023 KURT CORRAL
Highway dedication Cleared 6/30/2023 ADRIAN SANCHEZ
Internal circulation Cleared 7/13/2023 COLLINS ALLAN
Transportation Demand Ord. Cleared 7/13/2023 COLLINS ALLAN
Work Adjacent to Public Way Cleared 7/19/2023 LARRY LEE
Low Impact Development Cleared 7/24/2023 ORVAL HERNANDEZ-MARCI
Roof/Waste drainage to street Cleared 8/6/2023 AHMED AMARRAGY
Historic Resource Verification Cleared 8/17/2023 MAX LODER
Permit Cleared 8/30/2023 ADRIAN SANCHEZ
"D" conditions Cleared 9/1/2023 MAYELA VILLA
Automotive Use Cleared 9/1/2023 MAYELA VILLA
Automotive Use Cleared 9/1/2023 MAYELA VILLA
Community Plan Implem. Overlay Cleared 9/1/2023 MAYELA VILLA
Fire Marshal Fire Life Safety Cleared 9/1/2023 ANDREW KO
Frnt yard landscape/Water mgmt Cleared 9/1/2023 MAYELA VILLA
Miscellaneous Cleared 9/1/2023 MAYELA VILLA
Miscellaneous Cleared 9/1/2023 MAYELA VILLA
Site Plan review Cleared 9/1/2023 MAYELA VILLA
ZI Cleared 9/1/2023 MAYELA VILLA
Redevelopment Project Area Cleared 9/6/2023 YASMINE BASHIRI
Community Plan Implem. Overlay Cleared 9/8/2023 ADRIAN SANCHEZ
Metro Rail approval Cleared 9/25/2023 JENNIFER SU
Miscellaneous Cleared 3/19/2024 ANNA VIDAL
Miscellaneous Cleared 4/18/2024 RUBEN VASQUEZ
Building over 36-ft Cleared 4/19/2024 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/26/2024 CALOSHA APPROVED

Contact Information

Architect Wagner,, Walter E; Lic. No.: C14931 2124 S EL CAMINO REAL #200      OCEANSIDE, CA 92054
Contractor Standard Construction 2 Llc; Lic. No.: 1074416-B 2647 GATEWAY RD STE 105-136      CARLSBAD, CA 92009
Engineer Gali,, Naveen; Lic. No.: L9123 14349 FIRESTONE BLVD      LA MIRADA, CA 90638
Engineer Schade,, Paul Robert; Lic. No.: GE2371 5736 CORPORATE AVE      CYPRESS, CA 90630

Inspector Information

ALFREDO LOPEZ, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI
JAMES POWERS, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Green Building Rough 5/14/2024 Not Ready for Inspection JAMES POWERS
METHANE-Rough 5/14/2024 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 5/14/2024 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 5/14/2024 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 5/17/2024 Partial Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 5/20/2024 Partial Approval NICK DANERI
Footing/Foundation/Slab 5/24/2024 Partial Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 5/30/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/3/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 6/5/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/10/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/10/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/24/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 6/24/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/25/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/26/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/27/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/28/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/1/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/1/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/2/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/3/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/5/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/8/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/8/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/9/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/10/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/11/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/12/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 7/15/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/16/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/17/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/18/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 7/18/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/19/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 7/22/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 9/9/2024 Partial Approval JAMES POWERS
METHANE-Barrier 9/9/2024 Partial Approval JAMES POWERS
METHANE-Subgrade 9/9/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/13/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 9/13/2024 Partial Approval JAMES POWERS
METHANE-Barrier 9/13/2024 Partial Approval JAMES POWERS
METHANE-Rough 9/13/2024 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 9/13/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 9/26/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 9/26/2024 Partial Approval JAMES POWERS
METHANE-Barrier 9/26/2024 Partial Approval JAMES POWERS
METHANE-Subgrade 9/26/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/4/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 10/4/2024 Partial Approval JAMES POWERS
METHANE-Barrier 10/4/2024 Partial Approval JAMES POWERS
METHANE-Subgrade 10/4/2024 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/15/2024 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 10/15/2024 Conditional Approval JEFFREY FULTON
Green Building Rough 10/15/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 10/15/2024 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 10/15/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 10/15/2024 Not Ready for Inspection JEFFREY FULTON
Deputy Reinf. Concrete 10/23/2024 Partial Approval JAMES POWERS
Green Building Rough 10/23/2024 Not Ready for Inspection JAMES POWERS
Insulation 10/23/2024 Not Ready for Inspection JAMES POWERS
METHANE-Rough 10/23/2024 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 10/23/2024 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 10/23/2024 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 10/28/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 10/29/2024 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 10/31/2024 Partial Approval JAMES POWERS
Reinforced Concrete Frame 10/31/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/8/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 11/12/2024 Conditional Approval JEFFREY FULTON
Green Building Rough 11/12/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 11/12/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 11/12/2024 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 11/12/2024 Conditional Approval JEFFREY FULTON
Verify Sprinkler Sign Off 11/12/2024 Not Ready for Inspection JEFFREY FULTON
Deputy Pre-Stress Concrete 11/21/2024 Partial Approval JAMES POWERS
Green Building Rough 11/21/2024 Not Ready for Inspection JAMES POWERS
Insulation 11/21/2024 Not Ready for Inspection JAMES POWERS
METHANE-Rough 11/21/2024 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 11/21/2024 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 11/21/2024 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 12/4/2024 Conditional Approval LARRY ARNICK
Green Building Rough 12/4/2024 Not Ready for Inspection LARRY ARNICK
Insulation 12/4/2024 Not Ready for Inspection LARRY ARNICK
METHANE-Rough 12/4/2024 Not Ready for Inspection LARRY ARNICK
Reinforced Concrete Frame 12/4/2024 Partial Approval LARRY ARNICK
Verify Sprinkler Sign Off 12/4/2024 Not Ready for Inspection LARRY ARNICK
Deputy Pre-Stress Concrete 12/19/2024 Partial Approval JAMES POWERS
Green Building Rough 12/19/2024 Not Ready for Inspection JAMES POWERS
Insulation 12/19/2024 Not Ready for Inspection JAMES POWERS
METHANE-Rough 12/19/2024 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 12/19/2024 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 12/19/2024 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 12/30/2024 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/30/2024 Partial Approval JAMES POWERS
Green Building Rough 12/30/2024 Not Ready for Inspection JAMES POWERS
Insulation 12/30/2024 Not Ready for Inspection JAMES POWERS
METHANE-Rough 12/30/2024 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 12/30/2024 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 12/30/2024 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 12/31/2024 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/31/2024 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/9/2025 Partial Approval JAMES POWERS
Deputy Shotcrete 1/10/2025 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/10/2025 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/16/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/16/2025 Partial Approval JAMES POWERS
Green Building Rough 1/16/2025 Not Ready for Inspection JAMES POWERS
Insulation 1/16/2025 Not Ready for Inspection JAMES POWERS
METHANE-Rough 1/16/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 1/16/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 1/16/2025 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 1/17/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/17/2025 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/28/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/28/2025 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 1/29/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 1/29/2025 Partial Approval JAMES POWERS
Green Building Rough 1/29/2025 Not Ready for Inspection JAMES POWERS
Insulation 1/29/2025 Not Ready for Inspection JAMES POWERS
METHANE-Rough 1/29/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 1/29/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 1/29/2025 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 2/6/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/6/2025 Partial Approval JAMES POWERS
Green Building Rough 2/6/2025 Not Ready for Inspection JAMES POWERS
Insulation 2/6/2025 Not Ready for Inspection JAMES POWERS
METHANE-Rough 2/6/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 2/6/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/6/2025 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 2/7/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/7/2025 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/18/2025 Partial Approval JAMES POWERS
Deputy Other (see comments) 2/19/2025 Partial Approval JAMES POWERS
Green Building Rough 2/19/2025 Not Ready for Inspection JAMES POWERS
Insulation 2/19/2025 Not Ready for Inspection JAMES POWERS
METHANE-Rough 2/19/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 2/19/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/19/2025 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 2/27/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/27/2025 Partial Approval JAMES POWERS
Green Building Rough 2/27/2025 Not Ready for Inspection JAMES POWERS
Insulation 2/27/2025 Not Ready for Inspection JAMES POWERS
METHANE-Rough 2/27/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 2/27/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 2/27/2025 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 2/28/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 2/28/2025 Partial Approval JAMES POWERS
Insulation 3/3/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 3/3/2025 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/6/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/6/2025 Partial Approval JAMES POWERS
Green Building Rough 3/6/2025 Not Ready for Inspection JAMES POWERS
Insulation 3/6/2025 Not Ready for Inspection JAMES POWERS
METHANE-Rough 3/6/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 3/6/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 3/6/2025 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 3/7/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/7/2025 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/12/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/12/2025 Partial Approval JAMES POWERS
Deputy Pre-Stress Concrete 3/13/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/13/2025 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/14/2025 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 3/17/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/17/2025 Partial Approval JAMES POWERS
Green Building Rough 3/17/2025 Not Ready for Inspection JAMES POWERS
METHANE-Rough 3/17/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 3/17/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 3/17/2025 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 3/18/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 3/18/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 3/21/2025 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Masonry 4/1/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/2/2025 Partial Approval JAMES POWERS
Drywall Nailing 4/2/2025 Partial Approval JAMES POWERS
Green Building Rough 4/2/2025 Not Ready for Inspection JAMES POWERS
Insulation 4/2/2025 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 4/2/2025 Partial Approval JAMES POWERS
METHANE-Rough 4/2/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 4/2/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 4/2/2025 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 4/7/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/7/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 4/7/2025 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/7/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/8/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/8/2025 Partial Approval JAMES POWERS
Drywall Nailing 4/14/2025 Partial Approval JAMES POWERS
Green Building Rough 4/14/2025 Not Ready for Inspection JAMES POWERS
METHANE-Rough 4/14/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 4/14/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 4/14/2025 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 4/22/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 4/22/2025 Partial Approval JAMES POWERS
Deputy Steel/Welding 4/22/2025 Partial Approval JAMES POWERS
Green Building Rough 4/22/2025 Not Ready for Inspection JAMES POWERS
Insulation 4/22/2025 Partial Approval JAMES POWERS
METHANE-Rough 4/22/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 4/22/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 4/22/2025 Not Ready for Inspection JAMES POWERS
Deputy Pre-Stress Concrete 4/23/2025 Conditional Approval LARRY ARNICK
Deputy Reinf. Masonry 4/23/2025 Conditional Approval LARRY ARNICK
Deputy Steel/Welding 4/23/2025 Conditional Approval LARRY ARNICK
Insulation 4/23/2025 Partial Approval LARRY ARNICK
Footing/Foundation/Slab 4/29/2025 Partial Approval EDWIN GREGORYONA
Green Building Rough 4/29/2025 Partial Inspection EDWIN GREGORYONA
Insulation 4/29/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 4/29/2025 Partial Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 4/29/2025 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 5/5/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/5/2025 Partial Approval JAMES POWERS
Drywall Nailing 5/5/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/5/2025 Partial Approval JAMES POWERS
Insulation 5/19/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 5/19/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/3/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/3/2025 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/3/2025 Partial Approval JAMES POWERS
Green Building Rough 6/3/2025 Not Ready for Inspection JAMES POWERS
Insulation 6/3/2025 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 6/3/2025 Partial Approval JAMES POWERS
METHANE-Rough 6/3/2025 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 6/4/2025 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 6/4/2025 Partial Approval JAMES POWERS
Green Building Rough 6/5/2025 Not Ready for Inspection JAMES POWERS
METHANE-Rough 6/5/2025 Not Ready for Inspection JAMES POWERS
Reinforced Concrete Frame 6/5/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 6/5/2025 Not Ready for Inspection JAMES POWERS
Green Building Rough 6/10/2025 Not Ready for Inspection JAMES POWERS
METHANE-Rough 6/10/2025 Partial Approval ALFREDO LOPEZ
Reinforced Concrete Frame 6/10/2025 Partial Approval JAMES POWERS
Verify Sprinkler Sign Off 6/10/2025 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 6/18/2025 Partial Approval JAMES POWERS
Insulation 6/23/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 6/23/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/17/2025 Partial Approval JAMES POWERS
Drywall Nailing 7/31/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 7/31/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 8/26/2025 Partial Approval JAMES POWERS
Drywall Nailing 9/4/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/4/2025 Partial Approval JAMES POWERS
T-Bar Ceiling 9/4/2025 Approved JAMES POWERS
Drywall Nailing 9/17/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/10/2025 Partial Approval JAMES POWERS
Insulation 10/23/2025 Partial Approval LARRY ARNICK
Special/Order Compliance 10/23/2025 Partial Approval LARRY ARNICK
Light Gage Steel Frame 10/28/2025 Partial Approval JAMES POWERS
Wood Frame 10/28/2025 Partial Approval JAMES POWERS
Interior/Exterior Lathing 11/13/2025 Approved LARRY ARNICK
Light Gage Steel Frame 11/20/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 12/4/2025 Partial Approval JAMES POWERS
T-Bar Ceiling 12/4/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 12/9/2025 Partial Approval JAMES POWERS
Interior/Exterior Lathing 12/15/2025 Partial Approval JAMES POWERS
T-Bar Ceiling 1/16/2026 Partial Approval JAMES POWERS
Final 1/21/2026 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 1/21/2026 Partial Approval JAMES POWERS
Special/Order Compliance 1/22/2026 Not Ready for Inspection JAMES POWERS
Special/Order Compliance 1/23/2026 Partial Approval JAMES POWERS
Final 1/26/2026 OK for TCO JAMES POWERS
Footing/Foundation/Slab 1/26/2026 Approved JAMES POWERS
Green Building Final 1/26/2026 Approved JAMES POWERS
Green Building Rough 1/26/2026 Approved JAMES POWERS
METHANE-Barrier 1/26/2026 Approved JAMES POWERS
METHANE-Final 1/26/2026 Approved JAMES POWERS
METHANE-Rough 1/26/2026 Approved JAMES POWERS
METHANE-Subgrade 1/26/2026 Approved JAMES POWERS
Reinforced Concrete Frame 1/26/2026 Approved JAMES POWERS
SGSOV-Seismic Gas S/O Valve 1/26/2026 SGSOV No Gas JAMES POWERS
Smoke Detectors 1/26/2026 Approved JAMES POWERS
Verify Sprinkler Sign Off 1/26/2026 Approved JAMES POWERS
Light Gage Steel Frame 2/2/2026 Partial Approval JAMES POWERS
Special/Order Compliance 2/2/2026 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 2/4/2026 Partial Approval RAFAEL ESPINOZA
Special/Order Compliance 2/24/2026 Partial Approval ALFREDO LOPEZ
Special/Order Compliance 2/25/2026 Approved ALFREDO LOPEZ
Deputy Other (see comments) 2/26/2026 Partial Approval JAMES POWERS
Special/Order Compliance 2/26/2026 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/3/2026 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/5/2026 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/11/2026 Partial Approval JAMES POWERS
Deputy Other (see comments) 3/12/2026 Approved JAMES POWERS
Deputy Other (see comments) 3/13/2026 Partial Approval JAMES POWERS