12121 W FOOTHILL BLVD 91342

Certificate Information: 12121 W FOOTHILL BLVD 91342

Application / Permit
22010-20000-04930
Plan Check / Job No.
B22VN14981
Group
Building
Type
Bldg-New
Sub-Type
Commercial
Primary Use
(22) Warehouse
Work Description
(N) 3-STORY TYPE II-B WAREHOUSE/OFFICE/STORAGE RENTAL BLDG PER CPC-2021-9000-VZC-ZV-CU-SPR (NFPA-13 FIRE SPRINKLERS THROUGHOUT)
Permit Issued
Issued on 11/20/2023
Issuing Office
Valley
Current Status
Issued on 11/20/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 10/10/2022 APPLICANT
Assigned to Plan Check Engineer 10/13/2022 NILOOFAR MEHRAIN
Corrections Issued 10/16/2022 NILOOFAR MEHRAIN
Quality Review Completed 11/2/2022 STEVEN KIM
Applicant returned to address corrections 3/22/2023 NILOOFAR MEHRAIN
Applicant returned to address corrections 3/23/2023 NILOOFAR MEHRAIN
Applicant returned to address corrections 5/15/2023 NILOOFAR MEHRAIN
Applicant returned to address corrections 7/19/2023 NILOOFAR MEHRAIN
Applicant returned to address corrections 8/30/2023 NILOOFAR MEHRAIN
Applicant returned to address corrections 9/20/2023 NILOOFAR MEHRAIN
Plan Check Approved 11/13/2023 NILOOFAR MEHRAIN
Issued 11/20/2023 APPLICANT
TCO Issued (Expire Date: 09-20-2026) 3/24/2026 JEFFREY DURAN

Permit Application Clearance Information

Address approval Cleared 11/2/2022 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 11/3/2022 LEE GUILBEAUX
Green Code Cleared 2/28/2023 MICHAEL AYERS
Trees in Parkway Cleared 5/8/2023 ADALBERTO VERA
Grading Pre-Inspection Cleared 5/24/2023 NILOOFAR MEHRAIN
GPI Written Notices Cleared 6/15/2023 NILOOFAR MEHRAIN
Highway dedication Cleared 6/15/2023 LEE GUILBEAUX
Permit Cleared 7/10/2023 LEE GUILBEAUX
Sewer availability Cleared 7/11/2023 LEE GUILBEAUX
Building over 36-ft Cleared 7/14/2023 CALOSHA APPROVED
Building over 36-ft Cleared 7/14/2023 CALOSHA APPROVED
Miscellaneous Cleared 7/21/2023 NATHAN ROMINE
Miscellaneous Cleared 7/21/2023 NATHAN ROMINE
Clean Up Green Up Cleared 8/9/2023 DANIEL CORONADO
Disturb/Remove Protected Trees Cleared 9/5/2023 NILOOFAR MEHRAIN
Low Impact Development Cleared 10/20/2023 JORGE MEJIA LEMUS
DAS Clearance Cleared 11/1/2023 Luke Gonzales
Hydrant and Access approval Cleared 11/1/2023 KURT CORRAL
"Q" conditions Cleared 11/6/2023 NELSON RODRIGUEZ
"T" removal Cleared 11/6/2023 NELSON RODRIGUEZ
CPC Cleared 11/6/2023 NELSON RODRIGUEZ
CPC Cleared 11/6/2023 NELSON RODRIGUEZ
Roof/Waste drainage to street Cleared 11/9/2023 ALEXANDER SBARDELLATI

Contact Information

Architect Michalek,, Christopher; Lic. No.: NA38780       ,
Contractor Arco / Murray National Construction Company Inc; Lic. No.: 934740-B       ,

Inspector Information

JOHN KITCKO, (818) 374-1109 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 12/4/2023 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 2/8/2024 Not Ready for Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 3/11/2024 Not Ready for Inspection DANNY RODRIGUEZ
Pre-Inspection 4/11/2024 Partial Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 4/17/2024 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Shotcrete 4/19/2024 Approved DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 4/19/2024 Partial Inspection DANNY RODRIGUEZ
Footing/Foundation/Slab 4/19/2024 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Shotcrete 4/25/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Grading 5/2/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/2/2024 Approved DANNY RODRIGUEZ
Footing/Foundation/Slab 5/2/2024 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Grading 5/15/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Grading 5/16/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Grading 5/17/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 5/28/2024 Conditional Approval KENNETH ROBERTS
Deputy Reinf. Concrete 5/30/2024 Partial Approval GREGORY POMISH
Footing/Foundation/Slab 5/30/2024 Partial Inspection GREGORY POMISH
Deputy Reinf. Concrete 6/3/2024 Conditional Approval JEFFREY DURAN
Footing/Foundation/Slab 6/4/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Concrete 6/7/2024 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 6/12/2024 Partial Approval RAFAEL CORTES
Pre-Inspection 6/12/2024 Approved RAFAEL CORTES
Deputy Reinf. Masonry 6/14/2024 Conditional Approval JEFFREY DURAN
Deputy Reinf. Masonry 6/17/2024 Conditional Approval GREGORY POMISH
Masonry Wall/Backfill 6/17/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 6/18/2024 Conditional Approval KENNETH ROBERTS
Excavation/Setback/Form/Re-Bar 6/18/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 6/21/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 6/25/2024 Approved DANNY RODRIGUEZ
Masonry Wall/Backfill 6/25/2024 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Masonry 6/26/2024 Conditional Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 6/26/2024 Corrections Issued DANNY RODRIGUEZ
Masonry Wall/Backfill 6/27/2024 Corrections Issued DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/1/2024 Approved DANNY RODRIGUEZ
Masonry Wall/Backfill 7/1/2024 Partial Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 7/3/2024 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/5/2024 Conditional Approval JOHN KITCKO
Deputy Steel/Welding 7/10/2024 Conditional Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 7/10/2024 Partial Approval DANNY RODRIGUEZ
Piling/Pier/Caisson 7/10/2024 Partial Inspection DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/11/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 7/12/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 7/15/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/16/2024 Conditional Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 7/17/2024 Partial Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 7/22/2024 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/23/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/24/2024 Conditional Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 7/24/2024 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/25/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 7/25/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 7/26/2024 Conditional Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 7/29/2024 Partial Approval DANNY RODRIGUEZ
Deputy Steel/Welding 8/6/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 8/8/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 8/9/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Grading 8/15/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 8/15/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Grading 8/16/2024 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 8/16/2024 Conditional Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 8/19/2024 Partial Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 8/21/2024 Partial Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 9/3/2024 Not Ready for Inspection DANNY RODRIGUEZ
Masonry Wall/Backfill 9/4/2024 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 9/5/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Grading 9/13/2024 Approved DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/17/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/18/2024 Conditional Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 9/19/2024 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 9/20/2024 Conditional Approval JEFFREY DURAN
Deputy Drilled-In Anchors 9/27/2024 Conditional Approval DANNY RODRIGUEZ
Light Gage Steel Frame 10/4/2024 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/7/2024 Conditional Approval DANNY RODRIGUEZ
Light Gage Steel Frame 10/11/2024 Partial Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 10/16/2024 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 10/16/2024 Conditional Approval CAMERON CHABAN
Deputy Reinf. Concrete 10/17/2024 Conditional Approval RAFAEL CORTES
Deputy Reinf. Masonry 10/17/2024 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 10/17/2024 Not Ready for Inspection RAFAEL CORTES
Masonry Wall/Backfill 10/17/2024 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 10/18/2024 Conditional Approval CAMERON CHABAN
Deputy Reinf. Masonry 10/18/2024 Conditional Approval CAMERON CHABAN
Excavation/Setback/Form/Re-Bar 10/18/2024 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/21/2024 Approved JOHN KITCKO
Deputy Reinf. Masonry 10/21/2024 Approved JOHN KITCKO
Deputy Reinf. Concrete 10/22/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 10/22/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 10/25/2024 Approved DANNY RODRIGUEZ
Masonry Wall/Backfill 10/25/2024 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 10/29/2024 Conditional Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 10/30/2024 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 11/4/2024 Conditional Approval JOHN KITCKO
Deputy Reinf. Masonry 11/5/2024 Approved DANNY RODRIGUEZ
Masonry Wall/Backfill 11/5/2024 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 11/6/2024 Approved DANNY RODRIGUEZ
Light Gage Steel Frame 11/6/2024 Partial Approval DANNY RODRIGUEZ
Deputy Shotcrete 11/7/2024 Conditional Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 11/7/2024 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 11/8/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Shotcrete 11/8/2024 Conditional Approval DANNY RODRIGUEZ
Insulation 11/8/2024 Partial Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 11/8/2024 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 11/12/2024 Approved DANNY RODRIGUEZ
Reinforced Concrete Frame 11/12/2024 Partial Approval DANNY RODRIGUEZ
Insulation 11/13/2024 Partial Approval DANNY RODRIGUEZ
Reinforced Masonry Frame 11/13/2024 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 11/14/2024 Not Ready for Inspection DANNY RODRIGUEZ
Deputy Reinf. Concrete 11/15/2024 Approved DANNY RODRIGUEZ
Deputy Shotcrete 11/15/2024 Approved DANNY RODRIGUEZ
Reinforced Masonry Frame 11/15/2024 Partial Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 11/18/2024 Partial Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 11/20/2024 Partial Approval GREGORY POMISH
Masonry Wall/Backfill 11/21/2024 Partial Inspection ANDREW DORSO
Deputy Reinf. Masonry 11/25/2024 Conditional Approval GREGORY POMISH
Deputy Reinf. Masonry 11/26/2024 Conditional Approval GREGORY POMISH
Masonry Wall/Backfill 11/26/2024 Partial Approval GREGORY POMISH
Deputy Reinf. Masonry 12/4/2024 Approved DANNY RODRIGUEZ
Deputy Reinf. Masonry 12/4/2024 Conditional Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 12/4/2024 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 12/5/2024 Conditional Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 12/6/2024 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 12/10/2024 Conditional Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 12/11/2024 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 12/16/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 12/16/2024 Conditional Approval DANNY RODRIGUEZ
Masonry Wall/Backfill 12/16/2024 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 12/17/2024 Approved DANNY RODRIGUEZ
Deputy Steel/Welding 12/30/2024 Conditional Approval DANNY RODRIGUEZ
Deputy Steel/Welding 1/3/2025 Conditional Approval DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 1/3/2025 Partial Inspection DANNY RODRIGUEZ
Excavation/Setback/Form/Re-Bar 1/6/2025 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 1/9/2025 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 1/22/2025 Approved DANNY RODRIGUEZ
Drywall Nailing 1/22/2025 Partial Approval DANNY RODRIGUEZ
Light Gage Steel Frame 1/22/2025 Partial Approval DANNY RODRIGUEZ
Light Gage Steel Frame 1/29/2025 Not Ready for Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 1/31/2025 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Concrete 2/11/2025 Conditional Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 2/19/2025 Approved DANNY RODRIGUEZ
Special/Order Compliance 2/24/2025 Partial Inspection DANNY RODRIGUEZ
Light Gage Steel Frame 2/28/2025 Partial Approval DANNY RODRIGUEZ
Insulation 3/4/2025 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 3/5/2025 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/6/2025 Not Ready for Inspection DANNY RODRIGUEZ
Drywall Nailing 3/7/2025 Partial Approval DANNY RODRIGUEZ
Insulation 3/10/2025 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 3/18/2025 Partial Approval DANNY RODRIGUEZ
Insulation 3/18/2025 Partial Approval DANNY RODRIGUEZ
Drywall Nailing 3/21/2025 Partial Approval DANNY RODRIGUEZ
Footing/Foundation/Slab 4/7/2025 Partial Approval DANNY RODRIGUEZ
Deputy Drilled-In Anchors 4/18/2025 Approved DANNY RODRIGUEZ
Reinforced Concrete Frame 4/21/2025 Partial Approval GREGORY POMISH
Light Gage Steel Frame 5/2/2025 Partial Approval DANNY RODRIGUEZ
Deputy Reinf. Masonry 5/12/2025 Conditional Approval DANNY RODRIGUEZ
Special/Order Compliance 5/15/2025 Partial Inspection DANNY RODRIGUEZ
Drywall Nailing 5/16/2025 Partial Approval DANNY RODRIGUEZ
Special/Order Compliance 5/16/2025 Partial Inspection DANNY RODRIGUEZ
Drywall Nailing 5/22/2025 Partial Approval JOHN KITCKO
Special/Order Compliance 5/22/2025 Not Ready for Inspection JOHN KITCKO
T-Bar Ceiling 6/20/2025 Not Ready for Inspection JOHN KITCKO
T-Bar Ceiling 6/26/2025 Partial Approval ROBERT DAVIS
Special/Order Compliance 8/28/2025 Partial Inspection ROBERT DAVIS
Special/Order Compliance 1/21/2026 Partial Inspection JOHN KITCKO
Special/Order Compliance 2/19/2026 No Access for Inspection JOHN KITCKO
Special/Order Compliance 3/16/2026 Partial Inspection JOHN KITCKO
Final 3/17/2026 Not Ready for Inspection JOHN KITCKO
Footing/Foundation/Slab 3/17/2026 Approved JOHN KITCKO
Green Building Final 3/17/2026 Not Ready for Inspection JOHN KITCKO
Green Building Rough 3/17/2026 Approved JOHN KITCKO
Reinforced Masonry Frame 3/17/2026 Approved JOHN KITCKO
SGSOV-Seismic Gas S/O Valve 3/17/2026 SGSOV Not Ready JOHN KITCKO
Smoke Detectors 3/17/2026 Approved JOHN KITCKO
Verify Sprinkler Sign Off 3/17/2026 Approved JOHN KITCKO
Special/Order Compliance 3/18/2026 Partial Inspection JOHN KITCKO
Special/Order Compliance 3/19/2026 Partial Inspection JOHN KITCKO
Pre-Inspection 3/20/2026 Partial Inspection BRIAN KELLY
Special/Order Compliance 3/20/2026 Partial Inspection JOHN KITCKO