413 N CLIFFWOOD AVE 90049

Certificate Information: 413 N CLIFFWOOD AVE 90049

Application / Permit
22010-20000-04668
Plan Check / Job No.
B22VN14116
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
(N) 20' X 11'6" DETACHED ACCESSORY DWELLING UNIT AS PER GCS 65852.2(E)(1)(B) AND WITH 14' X 20' ATTACHED OPEN TRELLIS, NFPA-13D FIRE SPRINKLERS , ALL WORK PER ENGINEERING
Permit Issued
Issued on 3/17/2023
Issuing Office
West Los Angeles
Current Status
CofO Issued on 11/4/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/19/2022 APPLICANT
Assigned to Plan Check Engineer 9/22/2022 RARES BODEA
Corrections Issued 9/30/2022 RARES BODEA
Quality Review Completed 10/7/2022 STEVEN KIM
Building Plans Picked Up 10/11/2022 APPLICANT
Applicant returned to address corrections 11/10/2022 RARES BODEA
Plan Check Approved 2/13/2023 RARES BODEA
Issued 3/17/2023 APPLICANT
CofO in Progress 10/14/2025 KEVIN SARGSYAN
Permit Finaled 11/4/2025 RICHARD STEINBACH
CofO Issued 11/4/2025 RICHARD STEINBACH
Permit Finaled 11/4/2025 RICHARD STEINBACH

Permit Application Clearance Information

Hydrant and Access approval Cleared 10/29/2022 GILBERT URREA
Construction near power lines Cleared 11/10/2022 RIDWAN HARDY
Address approval Cleared 11/15/2022 CATHERINE ADROVER
Eng Process Fee Ord 176,300 Cleared 2/9/2023 HISASHI KOBAYAKAWA
Low Impact Development Cleared 2/9/2023 ERNEST TSE
Roof/Waste drainage to street Cleared 2/9/2023 HISASHI KOBAYAKAWA
Sewer availability Cleared 2/9/2023 HISASHI KOBAYAKAWA
GPI Written Notices Cleared 2/13/2023 RARES BODEA
Grading Pre-Inspection Cleared 2/13/2023 RARES BODEA

Contact Information

Contractor J M A General Contractor; Lic. No.: 893018-B 5817 MCDONIE AVENUE      WOODLAND HILLS, CA 91367
Engineer Tani,, Jason; Lic. No.: C58271 5296 VIA PATRICIA      THOUSAND OAKS, CA 91320

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 8/9/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 8/9/2023 Partial Approval KEVIN SARGSYAN
Deputy Steel/Welding 8/22/2023 Conditional Approval ARAM AVEDISIAN
Excavation/Setback/Form/Re-Bar 9/19/2023 Corrections Issued KEVIN SARGSYAN
Footing/Foundation/Slab 9/20/2023 Approved KEVIN SARGSYAN
Deputy Steel/Welding 10/26/2023 Conditional Approval ARAM AVEDISIAN
Floor/Roof Diaphrgm/Shear Wall 1/23/2024 Partial Approval ARAM AVEDISIAN
ELECTRICAL-Rough 1/25/2024 Corrections Issued STEPHANIE SWANSON
HVAC-Rough 1/25/2024 Corrections Issued STEPHANIE SWANSON
PLUMBING-Rough 1/25/2024 Corrections Issued STEPHANIE SWANSON
ELECTRICAL-Rough 1/29/2024 Not Ready for Inspection KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 1/29/2024 Approved KEVIN SARGSYAN
HVAC-Rough 1/29/2024 Approved KEVIN SARGSYAN
PLUMBING-Rough 1/29/2024 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 2/29/2024 Corrections Issued KEVIN SARGSYAN
Green Building Rough 2/29/2024 Partial Approval KEVIN SARGSYAN
Verify Sprinkler Sign Off 2/29/2024 Corrections Issued KEVIN SARGSYAN
Wood Frame 3/5/2024 Not Ready for Inspection KEVIN SARGSYAN
Insulation 3/29/2024 Corrections Issued KEVIN SARGSYAN
Insulation 4/4/2024 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Rough 4/9/2024 Corrections Issued KEVIN SARGSYAN
Insulation 4/9/2024 Not Ready for Inspection KEVIN SARGSYAN
BUILDING-Rough-Frame 4/11/2024 Partial Approval KEVIN SARGSYAN
ELECTRICAL-Rough 4/11/2024 Approved KEVIN SARGSYAN
Green Building Rough 4/11/2024 Approved KEVIN SARGSYAN
Verify Sprinkler Sign Off 4/11/2024 Approved KEVIN SARGSYAN
Insulation 4/16/2024 Approved KEVIN SARGSYAN
Gas Test 4/18/2024 Not Ready for Inspection KEVIN SARGSYAN
Shower Pan 4/18/2024 Not Ready for Inspection KEVIN SARGSYAN
Shower Pan 4/26/2024 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 5/10/2024 Approved KEVIN SARGSYAN
HVAC-Rough 8/20/2024 No Access for Inspection KEVIN SARGSYAN
PLUMBING-Rough 8/20/2024 No Access for Inspection KEVIN SARGSYAN
ELECTRICAL-Rough 8/27/2024 Approved KEVIN SARGSYAN
PLUMBING-Rough 8/27/2024 Approved KEVIN SARGSYAN
ELECTRICAL-Final 3/13/2025 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Final 3/13/2025 Not Ready for Inspection KEVIN SARGSYAN
ELECTRICAL-Final 3/18/2025 Corrections Issued KEVIN SARGSYAN
PLUMBING-Final 3/19/2025 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Final 3/20/2025 Approved KEVIN SARGSYAN
HVAC-Final 3/21/2025 Corrections Issued KEVIN SARGSYAN
PLUMBING-Final 3/21/2025 Not Ready for Inspection KEVIN SARGSYAN
HVAC-Final 3/26/2025 Corrections Issued KEVIN SARGSYAN
PLUMBING-Final 3/26/2025 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 7/30/2025 Approved KEVIN SARGSYAN
Drywall Nailing 7/30/2025 Approved KEVIN SARGSYAN
Final 7/30/2025 Corrections Issued KEVIN SARGSYAN
Green Building Final 7/30/2025 Approved KEVIN SARGSYAN
HVAC-Final 7/30/2025 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 7/30/2025 SGSOV Approved KEVIN SARGSYAN
Service/Power Release 7/30/2025 Not Required KEVIN SARGSYAN
Smoke Detectors 7/30/2025 Approved KEVIN SARGSYAN
Final 9/30/2025 Conditional Approval KEVIN SARGSYAN
Final 10/14/2025 OK to Issue CofO KEVIN SARGSYAN