415 N CLIFFWOOD AVE 90049

Certificate Information: 415 N CLIFFWOOD AVE 90049

Application / Permit
22010-20000-04667
Plan Check / Job No.
B22VN14116
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(N) 77'4" X 72'2" TWO STORY RESIDENCE WITH HABITABLE BASEMENT AND ATTACHED THREE CAR GARAGE AND 27'0-1/2" X 13'6" OPEN REAR TRELLIS, NFPA-13D FIRE SPRINKLERS REQUIRED THROUGHOUT, ALL WORK PER ENGINEERING
Permit Issued
Issued on 3/17/2023
Issuing Office
West Los Angeles
Current Status
CofO Issued on 11/4/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/19/2022 APPLICANT
Assigned to Plan Check Engineer 9/22/2022 RARES BODEA
Corrections Issued 9/30/2022 RARES BODEA
Quality Review Completed 10/7/2022 STEVEN KIM
Building Plans Picked Up 10/11/2022 APPLICANT
Applicant returned to address corrections 11/10/2022 RARES BODEA
Plan Check Approved 2/13/2023 RARES BODEA
Issued 3/17/2023 APPLICANT
CofO in Progress 9/26/2025 KEVIN SARGSYAN
Permit Finaled 11/4/2025 RICHARD STEINBACH
CofO Issued 11/4/2025 RICHARD STEINBACH
Permit Finaled 11/4/2025 RICHARD STEINBACH

Permit Application Clearance Information

Permit Cleared 10/3/2022 CATHERINE ADROVER
Trees in Parkway Cleared 10/4/2022 ADALBERTO VERA
Eng Process Fee Ord 176,300 Cleared 10/5/2022 CATHERINE ADROVER
Sewer availability Cleared 10/5/2022 CATHERINE ADROVER
Hydrant and Access approval Cleared 10/29/2022 GILBERT URREA
Construction near power lines Cleared 11/10/2022 RIDWAN HARDY
GPI Written Notices Cleared 11/10/2022 RARES BODEA
Grading Pre-Inspection Cleared 11/10/2022 RARES BODEA
Low Impact Development Cleared 2/9/2023 ERNEST TSE
Roof/Waste drainage to street Cleared 2/9/2023 HISASHI KOBAYAKAWA

Contact Information

Contractor J M A General Contractor; Lic. No.: 893018-B 5817 MCDONIE AVENUE      WOODLAND HILLS, CA 91367
Engineer Tani,, Jason; Lic. No.: C58271 5296 VIA PATRICIA      THOUSAND OAKS, CA 91320

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 5/11/2023 Partial Approval KEVIN SARGSYAN
Deputy Reinf. Concrete 5/30/2023 Conditional Approval KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 5/30/2023 Corrections Issued KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 5/30/2023 Partial Approval MICHAEL PELHAM
Footing/Foundation/Slab 5/30/2023 Partial Approval MICHAEL PELHAM
Deputy Reinf. Concrete 5/31/2023 Conditional Approval KEVIN SARGSYAN
Footing/Foundation/Slab 6/15/2023 Partial Approval EVAN COOPER
Deputy Reinf. Concrete 6/16/2023 No Access for Inspection KENNETH NAGLE
Deputy Reinf. Concrete 6/23/2023 No Access for Inspection KENNETH NAGLE
Excavation/Setback/Form/Re-Bar 6/23/2023 Partial Approval EVAN COOPER
Footing/Foundation/Slab 6/23/2023 Partial Approval EVAN COOPER
Deputy Reinf. Concrete 6/26/2023 Partial Approval EVAN COOPER
Excavation/Setback/Form/Re-Bar 6/27/2023 Corrections Issued EVAN COOPER
Underground Mechanical 8/7/2023 Not Ready for Inspection KEVIN SARGSYAN
Footing/Foundation/Slab 8/9/2023 Partial Approval KEVIN SARGSYAN
Deputy Steel/Welding 8/22/2023 Conditional Approval ARAM AVEDISIAN
Excavation/Setback/Form/Re-Bar 9/19/2023 Corrections Issued KEVIN SARGSYAN
Footing/Foundation/Slab 9/20/2023 Approved KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 10/19/2023 Corrections Issued ARAM AVEDISIAN
Deputy Wood Construction 10/23/2023 No Access for Inspection KENNETH NAGLE
Floor/Roof Diaphrgm/Shear Wall 10/23/2023 Partial Inspection KENNETH NAGLE
Deputy Steel/Welding 10/26/2023 Conditional Approval ARAM AVEDISIAN
Floor/Roof Diaphrgm/Shear Wall 11/8/2023 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 11/27/2023 Corrections Issued KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 11/29/2023 Partial Approval KEVIN SARGSYAN
Deputy Drilled-In Anchors 1/24/2024 Approved STEPHANIE SWANSON
ELECTRICAL-Rough 1/24/2024 Corrections Issued STEPHANIE SWANSON
HVAC-Rough 1/24/2024 Corrections Issued STEPHANIE SWANSON
PLUMBING-Rough 1/24/2024 Corrections Issued STEPHANIE SWANSON
ELECTRICAL-Rough 1/25/2024 Partial Approval STEPHANIE SWANSON
HVAC-Rough 1/25/2024 Corrections Issued STEPHANIE SWANSON
PLUMBING-Rough 1/25/2024 Corrections Issued STEPHANIE SWANSON
ELECTRICAL-Rough 1/29/2024 Not Ready for Inspection KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 1/29/2024 Not Ready for Inspection KEVIN SARGSYAN
HVAC-Rough 1/29/2024 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Rough 1/29/2024 Not Ready for Inspection KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 1/30/2024 Partial Approval KEVIN SARGSYAN
ELECTRICAL-Rough 2/1/2024 Approved ARAM AVEDISIAN
HVAC-Rough 2/20/2024 Approved KEVIN SARGSYAN
PLUMBING-Rough 2/20/2024 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 2/29/2024 Corrections Issued KEVIN SARGSYAN
Green Building Rough 2/29/2024 Partial Approval KEVIN SARGSYAN
Verify Sprinkler Sign Off 2/29/2024 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 3/5/2024 Partial Approval KEVIN SARGSYAN
Green Building Rough 3/5/2024 Partial Approval KEVIN SARGSYAN
Insulation 3/18/2024 Partial Approval KEVIN SARGSYAN
Drywall Nailing 3/29/2024 Partial Approval KEVIN SARGSYAN
Shower Pan 4/17/2024 Not Ready for Inspection KEVIN SARGSYAN
Gas Test 4/18/2024 Not Ready for Inspection KEVIN SARGSYAN
BUILDING-Rough-Frame 4/25/2024 Conditional Approval KEVIN SARGSYAN
Green Building Rough 4/25/2024 Approved KEVIN SARGSYAN
Shower Pan 4/25/2024 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 5/10/2024 Approved KEVIN SARGSYAN
ELECTRICAL-Rough 8/26/2024 Approved KEVIN SARGSYAN
Sewer 8/26/2024 Corrections Issued KEVIN SARGSYAN
Underground Mechanical 8/26/2024 Approved KEVIN SARGSYAN
Sewer 8/27/2024 Approved KEVIN SARGSYAN
ELECTRICAL-Final 3/13/2025 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Final 3/13/2025 Not Ready for Inspection KEVIN SARGSYAN
ELECTRICAL-Final 3/18/2025 Corrections Issued KEVIN SARGSYAN
PLUMBING-Final 3/19/2025 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Final 3/20/2025 Approved KEVIN SARGSYAN
HVAC-Final 3/21/2025 Corrections Issued KEVIN SARGSYAN
PLUMBING-Final 3/21/2025 Not Ready for Inspection KEVIN SARGSYAN
HVAC-Final 3/26/2025 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Final 3/26/2025 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 7/30/2025 Approved KEVIN SARGSYAN
Drywall Nailing 7/30/2025 Approved KEVIN SARGSYAN
Final 7/30/2025 Corrections Issued KEVIN SARGSYAN
Green Building Final 7/30/2025 Approved KEVIN SARGSYAN
HVAC-Final 7/30/2025 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 7/30/2025 SGSOV Approved KEVIN SARGSYAN
Service/Power Release 7/30/2025 Not Ready for Inspection KEVIN SARGSYAN
Smoke Detectors 7/30/2025 Approved KEVIN SARGSYAN
Final 9/26/2025 OK to Issue CofO KEVIN SARGSYAN
Service/Power Release 9/26/2025 Approved KEVIN SARGSYAN