12745 W HANOVER ST 90049

Certificate Information: 12745 W HANOVER ST 90049

Application / Permit
22010-20000-03410
Plan Check / Job No.
B22VN10689
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(23) Recreation Room
Work Description
NEW 7'-8" x 21'-8" POOL ACCESSORY STRUCTURE WITH A HALF BATHROOM AND AN ATTACHED 17'-8" x 9'-11" OPEN TRELLIS PATIO AND ATTACHED BLOCK WALL. WORK PER ENGINEER.
Permit Issued
Issued on 2/6/2023
Issuing Office
Current Status
CofO Issued on 10/7/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/12/2022 APPLICANT
Assigned to Plan Check Engineer 7/13/2022 SARKIS HARABEDIAN
Corrections Issued 7/16/2022 SARKIS HARABEDIAN
Building Plans Picked Up 8/2/2022 APPLICANT
Applicant returned to address corrections 9/19/2022 ROSENDO MEDINA
Plan Check Approved 1/26/2023 SARKIS HARABEDIAN
Issued 2/6/2023 APPLICANT
CofO in Progress 9/23/2025 HERBERT GIRON
Permit Finaled 10/7/2025 RICHARD STEINBACH
Permit Finaled 10/7/2025 RICHARD STEINBACH
CofO Issued 10/7/2025 RICHARD STEINBACH

Permit Application Clearance Information

ZA Case Cleared 8/10/2022 ASHLEY RODARTE
Roof/Waste drainage to street Cleared 8/29/2022 JENSON LEE
Eng Process Fee Ord 176,300 Cleared 8/30/2022 JENSON LEE
Specific Plan Cleared 9/6/2022 PEDRO AYALA
Grading Pre-Inspection Cleared 9/19/2022 ROSENDO MEDINA

Contact Information

Architect Yotnegparian,, Alain Levon; Lic. No.: C26374 11541 DONA PEPITA PLACE      STUDIO CITY, CA 91604
Contractor Rattigan Construction; Lic. No.: 760004-B 11549 DILLING ST      STUDIO CITY, CA 91604
Engineer Koh,, William Kim; Lic. No.: S3473 5695 STARWOOD CT      WESTLAKE VILLAGE, CA 91362

Inspector Information

HERBERT GIRON, (310) 914-3891 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 5/17/2023 Corrections Issued KEVIN SARGSYAN
Underground Mechanical 5/17/2023 Partial Approval KEVIN SARGSYAN
ELECTRICAL-Rough 5/23/2023 Partial Approval JESUS RODRIGUEZ
Excavation/Setback/Form/Re-Bar 5/23/2023 Conditional Approval JESUS RODRIGUEZ
Footing/Foundation/Slab 5/23/2023 Conditional Approval JESUS RODRIGUEZ
Gas Test 5/23/2023 Partial Approval JESUS RODRIGUEZ
PLUMBING-Rough 5/23/2023 Partial Approval JESUS RODRIGUEZ
Deputy Reinf. Concrete 6/21/2023 Conditional Approval RICHARD STEINBACH
Floor/Roof Diaphrgm/Shear Wall 6/29/2023 Approved OGANES TARAKHCHYAN
Deputy Reinf. Masonry 7/7/2023 Partial Approval OGANES TARAKHCHYAN
Masonry Wall/Backfill 7/12/2023 Partial Approval OGANES TARAKHCHYAN
Masonry Wall/Backfill 7/31/2023 Approved CARLOS MATAMOROS
ELECTRICAL-Rough 11/7/2023 Partial Approval ARAM AVEDISIAN
HVAC-Rough 11/7/2023 Approved ARAM AVEDISIAN
PLUMBING-Rough 11/7/2023 Approved ARAM AVEDISIAN
BUILDING-Rough-Frame 11/16/2023 Partial Approval ARAM AVEDISIAN
Interior/Exterior Lathing 12/4/2023 Partial Approval ARAM AVEDISIAN
Insulation 3/26/2024 Approved ARAM AVEDISIAN
Drywall Nailing 4/8/2024 Approved ARAM AVEDISIAN
ELECTRICAL-Final 5/23/2025 Corrections Issued ARAM AVEDISIAN
HVAC-Final 5/23/2025 Corrections Issued ARAM AVEDISIAN
PLUMBING-Final 5/23/2025 Corrections Issued ARAM AVEDISIAN
HVAC-Final 7/25/2025 Not Ready for Inspection HERBERT GIRON
HVAC-Final 7/31/2025 Partial Approval HERBERT GIRON
BUILDING-Rough-Frame 9/2/2025 Conditional Approval MICHAEL ALLEN
Final 9/2/2025 Corrections Issued MICHAEL ALLEN
Footing/Foundation/Slab 9/2/2025 Approved MICHAEL ALLEN
Green Building Final 9/2/2025 Approved MICHAEL ALLEN
Green Building Rough 9/2/2025 Approved MICHAEL ALLEN
SGSOV-Seismic Gas S/O Valve 9/2/2025 SGSOV Approved MICHAEL ALLEN
Verify Sprinkler Sign Off 9/2/2025 Corrections Issued MICHAEL ALLEN
ELECTRICAL-Final 9/16/2025 Approved HERBERT GIRON
Final 9/16/2025 Corrections Issued HERBERT GIRON
HVAC-Final 9/16/2025 Approved HERBERT GIRON
PLUMBING-Final 9/16/2025 Approved HERBERT GIRON
BUILDING-Rough-Frame 9/23/2025 Approved HERBERT GIRON
Final 9/23/2025 OK to Issue CofO HERBERT GIRON
Verify Sprinkler Sign Off 9/23/2025 Approved HERBERT GIRON