3940 N COLLIS AVE 90032

Certificate Information: 3940 N COLLIS AVE 90032

Application / Permit
22010-20000-02592
Plan Check / Job No.
B22VN07809
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
NEW 26'-0" X 26'-0" DETACHED TWO STORY ACCESSORY BUILDING ( TWO CAR GARAGE AT 1ST FLOOR & ACCESSORY DWELLING UNIT AT 2ND FLOOR) PER LAMC 12.22 A.33(c) and (d). The LID clearance has been deferred. Approval for LID requirements shall be obtained from LASAN prior to the finaling of the permit.
Permit Issued
Issued on 5/10/2023
Issuing Office
Current Status
CofO Issued on 5/30/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/20/2022 APPLICANT
Assigned to Plan Check Engineer 5/23/2022 ARTIN ZARUKIAN
Corrections Issued 5/24/2022 ARTIN ZARUKIAN
Building Plans Picked Up 5/31/2022 APPLICANT
Applicant returned to address corrections 3/24/2023 LUISANGEL VALENZUELA
Issued 5/10/2023 APPLICANT
CofO in Progress 5/23/2024 LILIANA PORTILLO
Permit Finaled 5/30/2024 DEROLD HAUFF
CofO Issued 5/30/2024 DEROLD HAUFF
Permit Finaled 5/30/2024 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 8/4/2022 CELINA MORENO
Hydrant and Access approval Cleared 9/15/2022 JOHN CONNEALLY
Eng Process Fee Ord 176,300 Cleared 10/13/2022 CELINA MORENO
Sewer availability Cleared 10/13/2022 CELINA MORENO
Disturb/Remove Protected Trees Cleared 12/5/2022 ADALBERTO VERA
Roof/Waste drainage to street Cleared 1/12/2023 CELINA MORENO
"D" conditions Cleared 3/17/2023 MAXFIELD VERMY
"Q" conditions Cleared 3/17/2023 MAXFIELD VERMY
Grading Pre-Inspection Cleared 3/24/2023 KIRK LINKLATER
ZI Cleared 5/5/2023 MAXFIELD VERMY
GPI Written Notices Cleared 5/10/2023 ARTIN ZARUKIAN

Contact Information

Contractor Owner-Builder       ,
Engineer Burnazyan,, Gegam; Lic. No.: C76761 5832 JAMIESON AVE      ENCINO, CA 91316

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 6/22/2023 Corrections Issued AMY COLIN
Footing/Foundation/Slab 6/22/2023 Not Ready for Inspection AMY COLIN
PLUMBING-Rough 6/22/2023 Partial Approval AMY COLIN
Floor/Roof Diaphrgm/Shear Wall 7/10/2023 Partial Approval AMY COLIN
Underground Mechanical 7/10/2023 Corrections Issued AMY COLIN
Excavation/Setback/Form/Re-Bar 7/13/2023 Approved AMY COLIN
Underground Mechanical 7/13/2023 Not Ready for Inspection AMY COLIN
Excavation/Setback/Form/Re-Bar 7/20/2023 Corrections Issued AMY COLIN
BUILDING-Rough-Frame 7/25/2023 Not Ready for Inspection AMY COLIN
Floor/Roof Diaphrgm/Shear Wall 7/25/2023 Not Ready for Inspection AMY COLIN
Green Building Rough 7/25/2023 Not Ready for Inspection AMY COLIN
Rough-Elec/Plmb/HVAC 7/25/2023 Not Ready for Inspection AMY COLIN
Underground Mechanical 7/25/2023 Approved AMY COLIN
Verify Sprinkler Sign Off 7/25/2023 Not Ready for Inspection AMY COLIN
BUILDING-Rough-Frame 8/2/2023 Approved AMY COLIN
Floor/Roof Diaphrgm/Shear Wall 8/2/2023 Approved AMY COLIN
Green Building Rough 8/2/2023 Not Ready for Inspection AMY COLIN
Rough-Elec/Plmb/HVAC 8/2/2023 Approved AMY COLIN
Verify Sprinkler Sign Off 8/2/2023 Approved AMY COLIN
Insulation 8/23/2023 Partial Approval JOSH MEISTER
Interior/Exterior Lathing 8/23/2023 Approved JOSH MEISTER
Shower Pan 8/23/2023 Approved JOSH MEISTER
Insulation 9/20/2023 Approved AMY COLIN
Drywall Nailing 9/26/2023 Approved AMY COLIN
Green Building Rough 9/26/2023 Approved AMY COLIN
ELECTRICAL-Final 12/7/2023 Not Ready for Inspection AMY COLIN
Service/Power Release 12/7/2023 Not Ready for Inspection AMY COLIN
Service/Power Release 12/11/2023 Not Ready for Inspection AMY COLIN
ELECTRICAL-Final 3/6/2024 Corrections Issued LILIANA PORTILLO
Final 3/6/2024 Corrections Issued LILIANA PORTILLO
Footing/Foundation/Slab 3/6/2024 Approved LILIANA PORTILLO
Green Building Final 3/6/2024 Not Ready for Inspection LILIANA PORTILLO
HVAC-Final 3/6/2024 Corrections Issued LILIANA PORTILLO
PLUMBING-Final 3/6/2024 Corrections Issued LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 3/6/2024 SGSOV Not Ready LILIANA PORTILLO
Service/Power Release 3/6/2024 Not Ready for Inspection LILIANA PORTILLO
Smoke Detectors 3/6/2024 Approved LILIANA PORTILLO
ELECTRICAL-Final 5/21/2024 Approved LILIANA PORTILLO
Final 5/21/2024 Not Ready for Inspection LILIANA PORTILLO
Green Building Final 5/21/2024 Approved LILIANA PORTILLO
HVAC-Final 5/21/2024 Approved LILIANA PORTILLO
PLUMBING-Final 5/21/2024 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 5/21/2024 SGSOV Approved LILIANA PORTILLO
Service/Power Release 5/21/2024 Approved LILIANA PORTILLO
Final 5/22/2024 OK to Issue CofO LILIANA PORTILLO