1510 N ORIOLE LANE 90069

Certificate Information: 1510 N ORIOLE LANE 90069

Application / Permit
22010-20000-01586
Plan Check / Job No.
B22VN04731
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
NEW DETACHED BASEMENT 3-CAR GARAGE (508 SQFT) ON PILES WITH ADU (507 SQFT) ON SECOND STORY, (19'-6"X30'- 3/4") W/NFPA 13D SPRINKLERS THROUGHOUT, INCLUDING PERMANENT SHORING PER GCS 65852.2(e)(1)(B) AND LAMC 12.22 A.33(c),(d) AND (g)
Permit Issued
Issued on 10/26/2023
Issuing Office
West Los Angeles
Current Status
CofO Issued on 5/5/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/30/2022 APPLICANT
Assigned to Plan Check Engineer 4/14/2022 PETER MOSESIAN
Corrections Issued 4/22/2022 PETER MOSESIAN
Quality Review Completed 4/22/2022 OMID HEDAYAT
Building Plans Picked Up 4/27/2022 APPLICANT
Plan Check Approved 9/27/2022 PETER MOSESIAN
Issued 10/26/2023 APPLICANT
CofO in Progress 4/28/2026 CRAIG VAUGHAN
No Progress 5/1/2026 DEROLD HAUFF
CofO in Progress 5/1/2026 DEROLD HAUFF
CofO Issued 5/5/2026 DEROLD HAUFF
Permit Finaled 5/5/2026 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 5/6/2022 CELINA MORENO
BHO/Hillside ordinance Cleared 5/6/2022 CELINA MORENO
BHO/Hillside ordinance Cleared 5/6/2022 CELINA MORENO
BHO/Hillside ordinance Cleared 5/6/2022 CELINA MORENO
BHO/Hillside ordinance Cleared 5/6/2022 CELINA MORENO
BHO/Hillside ordinance Cleared 5/6/2022 CELINA MORENO
Sewer availability Cleared 5/6/2022 CELINA MORENO
Street Frontage Cleared 5/6/2022 CELINA MORENO
Trees in Parkway Cleared 5/6/2022 ADALBERTO VERA
Low Impact Development Cleared 5/24/2022 LONDY ALVARADO
Permit Cleared 5/25/2022 CELINA MORENO
Eng Process Fee Ord 176,300 Cleared 5/27/2022 CELINA MORENO
Roof/Waste drainage to street Cleared 5/27/2022 CELINA MORENO
Hydrant and Access approval Cleared 5/28/2022 GILBERT URREA
Disturb/Remove Protected Trees Cleared 5/30/2022 ADALBERTO VERA

Contact Information

Contractor Colega Build Inc; Lic. No.: 1055953-B 4334 SEPULVEDA BLVD      CULVER CITY, CA 90230
Engineer Barr,, Joseph Daniel; Lic. No.: C70708 1185 HERITAGE FARM RD      HICKORY, NC 28601
Engineer De, Leon, Cynthia Aguilar; Lic. No.: C31604 8061 SAN MATEO CIR      BUENA PARK, CA 90620
Engineer Markov,, George P; Lic. No.: C55855 1623 THOMPSON AVE      GLENDALE, CA 91201
Engineer Ostowari,, Sohrab; Lic. No.: C41014 7012 HELMSDALE RD      WEST HILLS, CA 91307
Geologist Miller,, Jonathan Steven; Lic. No.: EG2391 24736 CALVERT STREET      WOODLAND HILLS, CA 91367

Inspector Information

BRENDAN MORELLI, (213) 202-3412 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/29/2024 Partial Inspection RAUL BARAJAS
Piling/Pier/Caisson 10/9/2024 Corrections Issued RAUL BARAJAS
Footing/Foundation/Slab 1/10/2025 Partial Approval ROY SPAULDING
Floor/Roof Diaphrgm/Shear Wall 2/25/2025 Partial Approval ROY SPAULDING
PLUMBING-Rough 3/18/2025 Not Ready for Inspection BRENDAN MORELLI
HVAC-Rough 4/7/2025 Approved ROY SPAULDING
PLUMBING-Rough 4/7/2025 Approved ROY SPAULDING
ELECTRICAL-Rough 4/23/2025 Corrections Issued SCOTT FINNILA
ELECTRICAL-Rough 4/28/2025 Approved ROY SPAULDING
Floor/Roof Diaphrgm/Shear Wall 4/28/2025 Partial Approval ROY SPAULDING
Insulation 6/9/2025 Not Ready for Inspection BRENDAN MORELLI
Structural Steel Frame 6/13/2025 Corrections Issued RAUL BARAJAS
Wood Frame 6/13/2025 Approved RAUL BARAJAS
Insulation 6/18/2025 Approved ROY SPAULDING
Insulation 6/20/2025 Approved RAUL BARAJAS
Interior/Exterior Lathing 6/20/2025 Approved RAUL BARAJAS
Drywall Nailing 7/3/2025 Conditional Approval JOSH MEISTER
Green Building Rough 7/3/2025 Not Ready for Inspection JOSH MEISTER
Interior/Exterior Lathing 8/14/2025 Approved JOSH MEISTER
Sewer 8/14/2025 Approved JOSH MEISTER
Shower Pan 8/14/2025 Corrections Issued JOSH MEISTER
Shower Pan 8/21/2025 Approved ROY SPAULDING
PLUMBING-Final 12/24/2025 Not Ready for Inspection RAUL BARAJAS
PLUMBING-Final 12/29/2025 Not Ready for Inspection CRAIG VAUGHAN
Gas Test 12/30/2025 Approved CRAIG VAUGHAN
PLUMBING-Final 12/30/2025 Approved CRAIG VAUGHAN
ELECTRICAL-Final 1/14/2026 Not Ready for Inspection CRAIG VAUGHAN
HVAC-Final 1/14/2026 Not Ready for Inspection CRAIG VAUGHAN
HVAC-Final 1/15/2026 Corrections Issued CRAIG VAUGHAN
ELECTRICAL-Final 2/9/2026 Corrections Issued CRAIG VAUGHAN
HVAC-Final 2/9/2026 Approved CRAIG VAUGHAN
Service/Power Release 2/9/2026 Approved CRAIG VAUGHAN
ELECTRICAL-Final 3/18/2026 Approved CRAIG VAUGHAN
BUILDING-Rough-Frame 4/16/2026 Not Ready for Inspection BRIAN SULLIVAN
Drywall Nailing 4/16/2026 Not Ready for Inspection BRIAN SULLIVAN
Final 4/16/2026 Corrections Issued BRIAN SULLIVAN
Footing/Foundation/Slab 4/16/2026 Approved BRIAN SULLIVAN
Green Building Final 4/16/2026 Not Ready for Inspection BRIAN SULLIVAN
Green Building Rough 4/16/2026 Not Ready for Inspection BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 4/16/2026 SGSOV Not Ready BRIAN SULLIVAN
Smoke Detectors 4/16/2026 Not Ready for Inspection BRIAN SULLIVAN
Verify Sprinkler Sign Off 4/16/2026 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 4/27/2026 Approved CRAIG VAUGHAN
Drywall Nailing 4/27/2026 Approved CRAIG VAUGHAN
Final 4/27/2026 OK to Issue CofO CRAIG VAUGHAN
Green Building Final 4/27/2026 Approved CRAIG VAUGHAN
Green Building Rough 4/27/2026 Approved CRAIG VAUGHAN
SGSOV-Seismic Gas S/O Valve 4/27/2026 SGSOV Approved CRAIG VAUGHAN
Smoke Detectors 4/27/2026 Approved CRAIG VAUGHAN
Verify Sprinkler Sign Off 4/27/2026 Approved CRAIG VAUGHAN