4748 E TWINING ST 90032

Certificate Information: 4748 E TWINING ST 90032

Application / Permit
22010-20000-01080
Plan Check / Job No.
B22VN03376
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 69'3-1/2" X 24'3/4" 2-STORY SINGLE FAMILY DWELLING WITH ATTACHED 2-CAR GARAGE. NFPA-13D FIRE SPRINKLERS TO BE PROVIDED THROUGHOUT
Permit Issued
Issued on 6/18/2024
Issuing Office
Valley
Current Status
Issued on 6/18/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 3/7/2022 APPLICANT
Assigned to Plan Check Engineer 3/31/2022 TROY DEGUZMAN
Corrections Issued 4/4/2022 TROY DEGUZMAN
Quality Review Completed 4/8/2022 OMID HEDAYAT
Building Plans Picked Up 4/8/2022 APPLICANT
Applicant returned to address corrections 5/18/2023 MARVEL DELACRUZ
Applicant returned to address corrections 9/1/2023 MARVEL DELACRUZ
Applicant returned to address corrections 9/25/2023 MARVEL DELACRUZ
Applicant returned to address corrections 11/8/2023 MARVEL DELACRUZ
Applicant returned to address corrections 1/2/2024 MARVEL DELACRUZ
Plan Check Approved 1/2/2024 MARVEL DELACRUZ
Issued 6/18/2024 APPLICANT

Permit Application Clearance Information

Address approval Cleared 4/26/2022 AMAAN MALIK
BHO/Hillside ordinance Cleared 4/26/2022 AMAAN MALIK
BHO/Hillside ordinance Cleared 4/26/2022 AMAAN MALIK
BHO/Hillside ordinance Cleared 4/26/2022 AMAAN MALIK
BHO/Hillside ordinance Cleared 4/26/2022 AMAAN MALIK
BHO/Hillside ordinance Cleared 4/26/2022 AMAAN MALIK
Eng Process Fee Ord 176,300 Cleared 4/26/2022 AMAAN MALIK
Sewer availability Cleared 4/26/2022 AMAAN MALIK
Hydrant and Access approval Cleared 5/31/2022 KURT CORRAL
Trees in Parkway Cleared 6/2/2022 ADALBERTO VERA
Low Impact Development Cleared 6/24/2022 ANTHONY VARGAS
Roof/Waste drainage to street Cleared 6/30/2022 AMAAN MALIK
Landscape for retaining wall Cleared 10/6/2022 DANIEL CORONADO
"D" conditions Cleared 4/27/2023 MAXFIELD VERMY
"Q" conditions Cleared 4/27/2023 MAXFIELD VERMY
ZI Cleared 4/27/2023 MAXFIELD VERMY
Permit Cleared 5/30/2023 STEVE MELGAR
Excavation more than 5-ft deep Cleared 1/2/2024 CALOSHA APPROVED
GPI Written Notices Cleared 1/2/2024 TROY DEGUZMAN
Grading Pre-Inspection Cleared 1/2/2024 TROY DEGUZMAN

Contact Information

Contractor Krous Leon Drilling Inc; Lic. No.: 532112-B 9300 BORDEN AVE      SUN VALLEY, CA 91352
Engineer Azarmy,, Cyrus; Lic. No.: L9404 4402 CHARLEMONT AVE      WOODLAND HILLS, CA 91364
Engineer Basma,, Ali J; Lic. No.: C53080 21757 DEVONSHIRE ST.   SUITE 3    CANOGA PARK, CA 91311
Engineer Song,, Jiansheng; Lic. No.: C71849 18728 BLOOMFIELD AVENUE      CERRITOS, CA 90703
Engineer Yadegari,, Shahriar; Lic. No.: C64591 10301 KESWICK AVE      LOS ANGELES, CA 90064

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 10/22/2024 Corrections Issued LILIANA PORTILLO
Footing/Foundation/Slab 10/24/2024 Partial Approval LILIANA PORTILLO
Deputy Reinf. Concrete 10/28/2024 Conditional Approval BRENDAN MORELLI
Footing/Foundation/Slab 11/22/2024 Corrections Issued LILIANA PORTILLO
Footing/Foundation/Slab 12/3/2024 Partial Approval LILIANA PORTILLO
Reinforced Concrete Frame 12/11/2024 Partial Approval LILIANA PORTILLO
Masonry Wall/Backfill 12/31/2024 Partial Approval BRENDAN MORELLI
Footing/Foundation/Slab 1/24/2025 Approved LILIANA PORTILLO
PLUMBING-Rough 2/26/2025 Corrections Issued LILIANA PORTILLO
Sewer 2/26/2025 Approved LILIANA PORTILLO
Underground Mechanical 2/26/2025 Approved LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 3/3/2025 Partial Approval ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 3/17/2025 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 4/8/2025 Not Ready for Inspection ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 4/8/2025 Corrections Issued ALIZAH MAYAGOITIA
Green Building Rough 4/8/2025 Not Ready for Inspection ALIZAH MAYAGOITIA
Verify Sprinkler Sign Off 4/8/2025 Not Ready for Inspection ALIZAH MAYAGOITIA
ELECTRICAL-Rough 5/2/2025 Corrections Issued LILIANA PORTILLO
HVAC-Rough 5/2/2025 Not Ready for Inspection LILIANA PORTILLO
PLUMBING-Rough 5/2/2025 Not Ready for Inspection LILIANA PORTILLO
Special/Order Compliance 5/2/2025 Corrections Issued LILIANA PORTILLO
ELECTRICAL-Rough 5/14/2025 Approved LILIANA PORTILLO
HVAC-Rough 5/14/2025 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 5/14/2025 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 5/21/2025 Conditional Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 5/21/2025 Approved LILIANA PORTILLO
HVAC-Rough 5/21/2025 Approved LILIANA PORTILLO
Insulation 5/29/2025 Partial Approval REGINA MENDEZ
Interior/Exterior Lathing 5/29/2025 Not Ready for Inspection REGINA MENDEZ
Shower Pan 5/29/2025 Approved REGINA MENDEZ
Drywall Nailing 6/4/2025 Not Ready for Inspection LILIANA PORTILLO
Green Building Rough 6/4/2025 Approved LILIANA PORTILLO
Interior/Exterior Lathing 6/4/2025 Partial Approval LILIANA PORTILLO
Drywall Nailing 6/16/2025 Approved BRENDAN MORELLI
Interior/Exterior Lathing 7/8/2025 Approved LILIANA PORTILLO
Excavation/Setback/Form/Re-Bar 10/14/2025 Approved LILIANA PORTILLO
Final 4/3/2026 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 5/29/2026 Approved OSVALDO PARAMO
Final 5/29/2026 Not Ready for Inspection OSVALDO PARAMO
Green Building Final 5/29/2026 Not Ready for Inspection OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 5/29/2026 SGSOV Not Ready OSVALDO PARAMO
Service/Power Release 5/29/2026 Not Ready for Inspection OSVALDO PARAMO
Smoke Detectors 5/29/2026 Not Ready for Inspection OSVALDO PARAMO
Verify Sprinkler Sign Off 5/29/2026 Approved OSVALDO PARAMO