6100 W 75TH PL 90045

Certificate Information: 6100 W 75TH PL 90045

Application / Permit
22010-20000-00361
Plan Check / Job No.
B22VN01131
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
NEW 2-STORY SFD WITH ATTACHED 2-CAR GARAGE.
Permit Issued
Issued on 10/17/2022
Issuing Office
Valley
Current Status
CofO Issued on 3/17/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/25/2022 APPLICANT
Assigned to Plan Check Engineer 2/24/2022 ADRIANA LOPEZ
Corrections Issued 3/4/2022 ADRIANA LOPEZ
Quality Review Completed 3/9/2022 SEAN DANG
Building Plans Picked Up 3/21/2022 APPLICANT
Applicant returned to address corrections 6/28/2022 ADRIANA LOPEZ
Plan Check Approved 9/6/2022 ADRIANA LOPEZ
Issued 10/17/2022 APPLICANT
CofO in Progress 3/17/2025 JESUS PINEDA
Permit Finaled 3/17/2025 RICHARD STEINBACH
CofO Issued 3/17/2025 RICHARD STEINBACH
Permit Finaled 3/17/2025 RICHARD STEINBACH

Permit Application Clearance Information

Specific Plan Cleared 5/18/2022 PEDRO AYALA
Disturb/Remove Protected Trees Cleared 6/22/2022 ADALBERTO VERA
Trees in Parkway Cleared 6/22/2022 ADALBERTO VERA
Hydrant and Access approval Cleared 6/23/2022 LAVEON RIDER
Eng Process Fee Ord 176,300 Cleared 7/18/2022 CATHERINE ADROVER
Sewer availability Cleared 7/18/2022 CATHERINE ADROVER
Low Impact Development Cleared 8/10/2022 ROGELIO CORTES
Roof/Waste drainage to street Cleared 8/11/2022 CATHERINE ADROVER
GPI Written Notices Cleared 8/17/2022 ADRIANA LOPEZ
Grading Pre-Inspection Cleared 8/17/2022 ADRIANA LOPEZ

Contact Information

Contractor Sweiskloss Inc; Lic. No.: 766542-B 1424 4TH STREET SUITE 501      SANTA MONICA, CA 90401

Inspector Information

MICHAEL LEWIS, (310) 914-3979 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 12/20/2022 Not Ready for Inspection BOBBY KEY
Footing/Foundation/Slab 12/20/2022 Corrections Issued BOBBY KEY
Deputy Reinf. Concrete 12/21/2022 Conditional Approval BOBBY KEY
Excavation/Setback/Form/Re-Bar 12/22/2022 Conditional Approval DAVID FEILER
Footing/Foundation/Slab 12/22/2022 Conditional Approval DAVID FEILER
Excavation/Setback/Form/Re-Bar 12/23/2022 Approved DAVID FEILER
Footing/Foundation/Slab 12/23/2022 Approved DAVID FEILER
Floor/Roof Diaphrgm/Shear Wall 1/20/2023 Partial Approval BOBBY KEY
Floor/Roof Diaphrgm/Shear Wall 1/25/2023 Partial Approval BOBBY KEY
Floor/Roof Diaphrgm/Shear Wall 3/8/2023 Partial Approval BOBBY KEY
Floor/Roof Diaphrgm/Shear Wall 3/17/2023 Partial Approval BOBBY KEY
Deputy Reinf. Concrete 3/28/2023 Conditional Approval BOBBY KEY
Deputy Wood Construction 4/7/2023 Conditional Approval JESUS PINEDA
Deputy Wood Construction 4/27/2023 Conditional Approval BOBBY KEY
Floor/Roof Diaphrgm/Shear Wall 4/28/2023 Partial Approval BOBBY KEY
Deputy Drilled-In Anchors 6/6/2023 Conditional Approval MICHAEL PELHAM
Deputy Steel/Welding 6/6/2023 Conditional Approval MICHAEL PELHAM
PLUMBING-Rough 7/5/2023 Approved BOBBY KEY
ELECTRICAL-Rough 7/24/2023 Partial Approval BOBBY KEY
Insulation 7/24/2023 Partial Approval BOBBY KEY
ELECTRICAL-Rough 9/11/2023 Conditional Approval RICHARD STEINBACH
ELECTRICAL-Rough 9/22/2023 Approved BOBBY KEY
HVAC-Rough 9/22/2023 Approved BOBBY KEY
Shower Pan 10/5/2023 Approved TEMISTOCLES CAAL
BUILDING-Rough-Frame 10/12/2023 Approved BOBBY KEY
Green Building Rough 10/12/2023 Approved BOBBY KEY
Insulation 10/12/2023 Partial Approval BOBBY KEY
Verify Sprinkler Sign Off 10/12/2023 Approved BOBBY KEY
Insulation 10/18/2023 Approved BOBBY KEY
Drywall Nailing 10/30/2023 Partial Approval TEMISTOCLES CAAL
Interior/Exterior Lathing 10/30/2023 Approved TEMISTOCLES CAAL
Drywall Nailing 11/27/2023 Approved BOBBY KEY
Excavation/Setback/Form/Re-Bar 12/7/2023 Approved BOBBY KEY
Gas Test 3/15/2024 Partial Approval BOBBY KEY
Sewer 3/15/2024 Approved BOBBY KEY
Underground Mechanical 3/15/2024 Partial Approval BOBBY KEY
Gas Test 6/18/2024 Approved BOBBY KEY
PLUMBING-Final 6/18/2024 Partial Approval BOBBY KEY
SGSOV-Seismic Gas S/O Valve 6/18/2024 SGSOV Approved BOBBY KEY
HVAC-Final 6/27/2024 Approved BOBBY KEY
PLUMBING-Final 6/27/2024 Approved BOBBY KEY
ELECTRICAL-Final 7/15/2024 Partial Approval BOBBY KEY
Green Building Final 7/15/2024 Approved BOBBY KEY
Smoke Detectors 7/15/2024 Approved BOBBY KEY
ELECTRICAL-Final 7/29/2024 Approved BOBBY KEY
Final 7/31/2024 Corrections Issued BOBBY KEY
Final 3/17/2025 OK to Issue CofO JESUS PINEDA
Service/Power Release 3/17/2025 Approved JESUS PINEDA